| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹53.0 LAccepted-AOC | L1 | Accepted-AOC AOC | |
| 2 | L2₹56.5 L+₹60,199 (1.08%)Rejected-Finance | L2 | Rejected-Finance Due to highest rate | |
| 3 | L3₹57.6 L+₹1.7 L (3.03%)Rejected-Finance | L3 | Rejected-Finance Due to highest rate |
| Sl No | Description | Qty | Unit | AJAY PATHANIA L1 | Harminder Singh L2 | kapil kumar govt contractor L3 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation in drain and channel etc in classification of all kinds of soil such as pick work, spade, jumper work, blasting work soft /hard rock, chiesling soft /hard rock lift upto 1.50 metres stacking the excavated soil with 15cm layer when required into plinth ,sides of foundations etc. consolidating each deposited layer by ramming and watering and then disposing of all surplus earth in Pick and Jumper work as per direction of Engineer-in-Charge with in all leads and lifts . | 303.15 | Cum | 680 ₹2,06,142 Lowest | 700 ₹2,12,205 | 750 ₹2,27,362.5 |
| 2.00 | Providing and laying cement concrete 1:4:8(1 cement: 4sand: 8graded stone agg. 40mm nominal size)and curing complete excluding cost of form work in foundation and plinth within all leads and lifts. | 119.35 | Cum | 7,250 ₹8,65,287.5 Lowest | 7,290 ₹8,70,061.5 | 7,320 ₹8,73,642 |
| 3.00 | Providing form work with steel plates 3.15mm thick welded with angles iron in frame 30x30x5mm so as to give a fair finish i/c centring, shuttering, propping etc.height of propping and centring below supporting floor to ceiling not exceeding 4 mtrs.height of propping and centring below supporting removal of the same for insitu work in:-In duct of Kuhl complete within all leads and lifts. | 3,408 | Sqmt | 95 ₹3,23,760 Lowest | 100 ₹3,40,800 | 111 ₹3,78,288 |
| 3.01 | In foundation and plinth complete within all leads and lifts. | 10.8 | Sqmt | 380 ₹4,104 Lowest | 400 ₹4,320 | 425 ₹4,590 |
| 4.00 | Providing laying cement concrete 1:2:4(1 cement: 2sand: 4graded stone agg.40mm nominal size)and curing complete excluding the cost of form work and reinforcement work for rainforcement cement concerete work in foundation, footingbases of columns and the like and mass concrete wall ( and thicknes but not less than 0.1 mtrs thickness ) attached pillars butteresses plinth and string sources etc.within all leads and lifts. | 364.85 | Cum | 8,800 ₹32,10,680 | 8,700 ₹31,74,195 | 8,600 ₹31,37,710 Lowest |
| 5.00 | Providing tor /mild steel reinforcement for RCC work i/c bending,binding and placing in position complete upto floor two level within all leads and lifts(Tor steel). | 11,098.5 | Kgs. | 86 ₹9,54,471 Lowest | 92 ₹10,21,062 | 100 ₹11,09,850 |
| 6.00 | Providing and fixing MS Plate V Notch of 90 degree complete within all leads and lifts. | 10 | Nos | 3,000 ₹30,000 Lowest | 3,200 ₹32,000 | 3,257 ₹32,570 |
Tender Value
₹50.0 L
EMD Value
₹82,540
Closing Date
12 Sept 2024, 11:00 amClosed
Executive Engineer
Jal Shakti Division Shahpur
CAD to FIS Dhamul Kuhal in Tehsil Shahpur, Distt, Kangra, (HP)
2024_HPIPH_92375_1
EE/JSDS/NIT/2024-6024-73 dt.29/08/2024
Open Tender
Civil Works
Item Rate
365 days
Shahpur
Please refer Tender documents.
7 documents required · 7 mandatory
₹800
Executive Engineer
₹82,540
5 Dec 2025
29 Aug 2024
12 Sept 2024
29 Aug 2024
12 Sept 2024
29 Aug 2024
29 Aug 2024 - 12 Sept 2024
Amount
Excavation in drain and channel etc in classification of all kinds of soil such as pick work, spade, jumper work, blasting work soft /hard rock, chiesling soft /hard rock lift upto 1.50 metres stacking the excavated soil with 15cm layer when required into plinth ,sides of foundations etc. consolidating each deposited layer by ramming and watering and then disposing of all surplus earth in Pick and Jumper work as per direction of Engineer-in-Charge with in all leads and lifts .
Providing and laying cement concrete 1:4:8(1 cement: 4sand: 8graded stone agg. 40mm nominal size)and curing complete excluding cost of form work in foundation and plinth within all leads and lifts.
Providing form work with steel plates 3.15mm thick welded with angles iron in frame 30x30x5mm so as to give a fair finish i/c centring, shuttering, propping etc.height of propping and centring below supporting floor to ceiling not exceeding 4 mtrs.height of propping and centring below supporting removal of the same for insitu work in:-In duct of Kuhl complete within all leads and lifts.
In foundation and plinth complete within all leads and lifts.
Providing laying cement concrete 1:2:4(1 cement: 2sand: 4graded stone agg.40mm nominal size)and curing complete excluding the cost of form work and reinforcement work for rainforcement cement concerete work in foundation, footingbases of columns and the like and mass concrete wall ( and thicknes but not less than 0.1 mtrs thickness ) attached pillars butteresses plinth and string sources etc.within all leads and lifts.
Providing tor /mild steel reinforcement for RCC work i/c bending,binding and placing in position complete upto floor two level within all leads and lifts(Tor steel).
Providing and fixing MS Plate V Notch of 90 degree complete within all leads and lifts.
Harminder Singh
kapil kumar govt contractor
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .