Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹20.3 L
EMD Value
₹40,700
Closing Date
28 Oct 2026, 5:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
VICE CHAIRMAN GHAZIABAD DEVELOPMENT AUTHORITY
GDA OFFICE VIKAS PATH GHAZIABAD
Construction of Remaining Drain and 12m Wide Road in Indirapuram Extension, Ghaziabad.
2026_GDAUP_1196758_1
696/4/PA-T/2026-27 Dt. 13.10.2026 (S.No.-02)
Open Tender
Civil Works
Percentage
90 days
GHAZIABAD
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,009
AS PER LINK PROVIDED IN TENDER DOCUMENT
₹40,700
14 Oct 2026
14 Oct 2026
30 Oct 2026
15 Oct 2026
28 Oct 2026
15 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Drain Work
Earth work in excavated by meshenical means thydraulic excavatory manual means in foudation trenches or drains (not exceeding 1.5 m in width of 10 sqm on plant, including dressing of sides and rumming of bottoms, for all lift, inchaling getting out the excavated soil and dispenal of surplus excavated soil as firested, within a lead of 50 m. All kinds of soil hem no-2.81 DSR 2023. | 113.4 | Cum | 204.3 | ₹23,167.62 |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering all work op to plinth level 1:48 11 cement. 4 coarse sand (Zone-111) derived from natural sources graded stone aggregate 40 mm nominal size derived from natural sources) item no-4, 1.8 DSR 2023 | 12.6 | Cum | 5,346.47 | ₹67,365.52 |
| 3 | Providing and laying in position ready mixed or site batched design cement concrete for plain cement concrete work, using course aggregate and fine aggregate derived from natural sources, Portland Pozzolana Ordinary Portland Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate I retard setting of concrete, to improve durability and workability without impairing strength, including pumping of concrete to site of laying, curing, carriage for all leads, but excluding the cost of centering, shuttering and finishing as per direction of the engineer-in-charge, for the following grades of concrete. Note Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the minimum specified cement content. the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. Concrete of M25 grade with minimum cement content of 300 kg/cum 4.20.1.4 | 12.6 | Cum | 7,408.33 | ₹93,344.96 |
| 4 | Providing and laying in position ready mixed or site batched design mix cement concrete for plain cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana/Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate I retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads, but excluding the cost of centering, shuttering and finishing as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the minimum specified cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement Concrete of M25 grade with minimum cement | 25.2 | Cum | 7,408.33 | ₹1,86,689.92 |
| 5 | M.S. steel reinforcement for R.C.C. work including straightening. cutting, bending, placing in position and binding all complete upto plinth level. mild steel and medium tensile steel bars. Item no-5.22.1 DSR 2023 | 29.67 | Qtl | 8,406 | ₹2,49,406.02 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for: DSR 2023/5.9 RAFT (5.9.1) DSR 2023/5.9 | 56 | Sqm | 307.78 | ₹17,235.68 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for DSR 2023/5.9 WALL (5.9.2) DSR | 336 | Sqm | 661.24 | ₹2,22,176.64 |
| 8 | ROAD WORK
Banking excavated earth by mechenical/manual means in layers not exceeding 20 cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller, or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up, in embanmments for roads, flood banks, and guide banks, etc. lead upto-50-m and for all lift: all kinds of soil Cartage of 8 km etc DSR 2023 ITIM NO 2.3.1 +SOR2022-231 (A) | 661.5 | Cum | 350.42 | ₹2,31,802.83 |
| 9 | Construction of Granular Sub-Base by providing coarse graded material. spreading in uniform layers with motor grader on prepared surface. mixsing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, as per MORTH specification clause No. 401 complete in all respects. (Approved rate) | 56 | Cum | 3,525 | ₹1,97,400 |
| 10 | Providing and laying in position ready mixed or site batched design mix cement concrete for plain cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana/Ordinary Portland Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate I retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads, but excluding the cost of centering, shuttering and finishing as per direction of the engineer-in-charge: for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the minimum specified cement content. the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. Concrete of M25 grade with minimum cement content of 300 kg/cum 4.20.1.4 | 52.5 | Cum | 7,408.33 | ₹3,88,937.33 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.34 MB
696_2.pdf
Tender Documents • 1.35 MB
BOQ_2260839.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .