| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.2 LAdmitted-Finance | ₹6.2 L | L1 | Admitted-Finance |
| 2 | L2₹6.2 LAdmitted-Finance | ₹6.2 L | L2 | Admitted-Finance |
| 3 | L3₹6.3 LAdmitted-Finance 159B M G ROAD HARIDEVPUR KOLKATA WEST BENGAL 700082 UDYAM WB 10 0018308 | KOLKATA | WEST BENGAL | 700082 | ₹6.3 L | L3 | Admitted-Finance |
| 4 | Rejected-Technical 1087 LASKARHAT KOLKATA 700039 | KOLKATA | WEST BENGAL | 700039 | - | - | Rejected-Technical Not Qualified |
| Sl No | Description | Qty | Unit | RIDDHI (INDIA) L2 | SENSUAL ELECTRO MECH L1 | MONDAL ENTERPRISE L3 |
|---|---|---|---|---|---|---|
| 1.00 | Supply, delivery and fitting fixing of 1 no. ABB make Soft Starter at Clear water pumping station under Panihati Municipality as per direction of EIC. ( Model no: PSTX470-600-70) | 1 | No. | 4,77,000 ₹4.8 L | 4,77,000 ₹4.8 L | 4,91,310 ₹4.9 L |
| 2.00Repairing of Marathon make 250 KW LT Motor | ||||||
| 3.00 | Taking out the L.T. sq. cage Induction Motor after disconnections of supply terminal connections including earthing terminal connection, from coupling end of VT pump after dismantling the same from the motor stool. The motor is to be kept on wooden sleeper at a suitable distance from the floor without damaging the earthing strips and cables etc. as per direction of E.I.C | 1 | No. | 18,090 ₹18,090 | 18,000 ₹18,000 | 18,540 ₹18,540 |
| 4.00 | Repairing and servicing of the 250 KW LT motor ( Make: Marathon) by dismantling it part by part, cleaning, doing through inspection, necessary rectifications & repairing, replacement of spare parts such as: i) 6 nos lead cables & 6 nos. thimble, ii) Terminal block 2 nos, iii) DE roller bearing ( NU 321 C3), NDE Ball bearing ( 6321 C3 ) Make: SKF / FAG etc. Thereafter re-connection & re-insulation of the stator winding, heat varnishing of the stator winding etc and then re-assembly of the complete motor unit including commencement of all necessary testings of the repaired motor along with painting & transportation of motor. | 1 | Job | 76,500 ₹76,500 | 76,500 ₹76,500 | 78,795 ₹78,795 |
| 5.00 | Refifling the motor (LT sq. cage IM) with all its necessary coupling and accessories to its original position including fifling fixing with bearing housing non-reversable rachet unit and pump shaft with proper tollerance and clearance and reconnection of terminal points the overhauling work i.e. cleaning of contracts sliping etc. (all connection strips, cable end are to be refifled in proper way including good damages of strip terminals) and satisfactory 2 hours trial run of the pump as per direction of E.I.C. for all pumping stations. | 1 | Job | 45,000 ₹45,000 | 45,000 ₹45,000 | 46,350 ₹46,350 |
Tender Value
Refer Docs
EMD Value
₹12,300
Closing Date
17 Feb 2026, 2:00 pmClosed
Executive Engineer, MD-I, EM, KMDA
OFFICE OF THE EXECUTIVE ENGINEER, MECHANICAL DIVISION-I. E-M SECTOR. KMDA, 59-NAZRUL PARK. ASHIWINI NAGAR. KOLKATA- 700159.
Replacement of 1 no. ABB make Soft Starter and allied works at Clear Water Pumping Station under Panihati Municipal Area.
2026_KMDA_997888_1
KMDA/E-M/EE/MD-I/NIQ No.- 06 of 2025-26 Dated- 30.01.2026
Open Tender
MECHANICAL
15 days
Panihati Municipal Area.
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹12,300
13 May 2026
9 Feb 2026
19 Feb 2026
9 Feb 2026
17 Feb 2026
9 Feb 2026
Supply, delivery and fitting fixing of 1 no. ABB make Soft Starter at Clear water pumping station under Panihati Municipality as per direction of EIC. ( Model no: PSTX470-600-70)
Repairing of Marathon make 250 KW LT Motor
Taking out the L.T. sq. cage Induction Motor after disconnections of supply terminal connections including earthing terminal connection, from coupling end of VT pump after dismantling the same from the motor stool. The motor is to be kept on wooden sleeper at a suitable distance from the floor without damaging the earthing strips and cables etc. as per direction of E.I.C
Repairing and servicing of the 250 KW LT motor ( Make: Marathon) by dismantling it part by part, cleaning, doing through inspection, necessary rectifications & repairing, replacement of spare parts such as: i) 6 nos lead cables & 6 nos. thimble, ii) Terminal block 2 nos, iii) DE roller bearing ( NU 321 C3), NDE Ball bearing ( 6321 C3 ) Make: SKF / FAG etc. Thereafter re-connection & re-insulation of the stator winding, heat varnishing of the stator winding etc and then re-assembly of the complete motor unit including commencement of all necessary testings of the repaired motor along with painting & transportation of motor.
Refifling the motor (LT sq. cage IM) with all its necessary coupling and accessories to its original position including fifling fixing with bearing housing non-reversable rachet unit and pump shaft with proper tollerance and clearance and reconnection of terminal points the overhauling work i.e. cleaning of contracts sliping etc. (all connection strips, cable end are to be refifled in proper way including good damages of strip terminals) and satisfactory 2 hours trial run of the pump as per direction of E.I.C. for all pumping stations.
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.59 MB
BOQ_2443333.xls
BOQ • 0.33 MB
Docs6_MD1.pdf
Tender Documents • 0.97 MB
Download all tender documents and submit your bid