| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹3.2 CrAccepted-AOC 70 SUBHASH NAGAR DISTRICT HARDOI UP | HARDOI | UTTAR PRADESH | 209869 | ₹3.2 Cr | L-1 | Accepted-AOC L-1 |
| 2 | L-2₹3.5 Cr+₹29.7 L (9.23%)Rejected-AOC NAYA GAON CHANDPUR BULANDSHAHAR UP | GONDA | UTTAR PRADESH | 271001 | ₹3.5 Cr+₹29.7 L (9.23%) | L-2 | Rejected-AOC L-2 |
| 3 | L-3₹3.7 Cr+₹52.8 L (16.4%)Rejected-AOC C 691 PATEL NAGAR RAJENDRA NAGAR BAREILLY | ₹3.7 Cr+₹52.8 L (16.4%) | L-3 | Rejected-AOC L-3 |
| 4 | L-4₹3.8 Cr+₹54.3 L (16.9%)Rejected-AOC ALAMPUR FATEHPUR JANPAD ALIGARH | ALIGARH | UTTAR PRADESH | ₹3.8 Cr+₹54.3 L (16.9%) | L-4 | Rejected-AOC L-4 |
| 5 | L-5₹3.9 Cr+₹71.4 L (22.2%)Rejected-AOC 0 0 0 NEAR DAK BUNGLOW NH 1 A NH 1A UDHAMPUR UDHAMPUR JAMMU KASHMIR 182101 | UDHAMPUR | JAMMU AND KASHMIR | 182101 | ₹3.9 Cr+₹71.4 L (22.2%) | L-5 | Rejected-AOC L-5 |
Tender Value
₹4.7 Cr
EMD Value
₹9.4 L
Closing Date
25 Sept 2024, 3:00 pmClosed
SUPERINTENDING ENGINEER
SE VTH CIRCLE IW BAREILLY
Bithora Rajwaha ke km. 0.000 se km. 29.650 tak sudhrinikaran, Boulder pitching, Nahri bhoomi ka seemankan evam km. 24.900 se km. 29.650 tak brick soling ka karye.
2024_UPIDC_954803_1
01/SE/2024-25
Open Tender
Civil Works
Item Rate
540 days
PILIBHIT
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,715
Yes
₹9.4 L
Yes
29 Oct 2024
12 Sept 2024
25 Sept 2024
12 Sept 2024
25 Sept 2024
12 Sept 2024
Amount
Cleaning thick bushes and thorny jungle without uprooting with all labour T&P etc Complete for completion of work as per direction of engineer-in-charge
Earth work in making canal section in profile by power tranported earth with a lead beyond 200m. and upto 1.00 Km. including excavation, loading, unloading, manual compaction, dressing and all lifts complete excluding royalty will be applicable from time to time on Govt. orders and for completion of work as per direction of Engineer-in-charge.
Earth work in Berm Cutting making canal section in profile with all lead and lift including manual compaction, ramming and dressing the surface to the required levels and slop. As per direction of Engineer- in-Charge.
Brick soling with straight over burnt brick laid on edge and dry including preparation of subgrade to prescribed camber and including supply of brick, filling joints with local earth, spreading blinding coat of 1cm depth of local earth of P.I. 5 to 7 or sand over the entire surface and including labour and T&P etc. required for proper completion of the work as per direction of Engineer -in-charge
Earth work in foundation in dry ordinary soil including lift up to 1.50 m and lead up to 30 m and including back filling, watering and ramming fo excavated earth into the trenches or into the space between the structure and the sides of foundation trenches or into the plinth with removal and disposal or surplus earth as directed by the Engineer-in-charge.
Laying C.C. 1:3:6 Mix (M-10) cement, coarse sand & 20 mm down graded stone grit including cost of all material, labour and T&P etc. complete as per direction of Engineer-in-charge but excludiing cost of shuttering.
Laying Brick work C.M. 1:4 Mix cement & coarse sand including cost of all material, labour and T&P etc. complete as per direction of Engineer-in-charge
Struck deep Cement pointing in 1:2 cement mortar including cost of all material, labour and T&P etc. complete as per direction of Engineer-in-charge
Centering & Shuttering For slab and Bed Block including all cost of material labour T&P etc. for complete work as per direction of Engineer-in-charge
Reinforcement in slab, laying,cutting,bending,binding and placing in position including all cost of material,labour,T&P etc. for complete work as per direction of Engineer-in-charge
Laying R.C.C. 1:1.5:3 Mix (M-20) cement, coarse sand & 20 mm down graded stone grit including cost of all material, labour and T&P etc. complete as per direction of Engineer-in-charge but excluding cost of Centering, shuttering & Reinforcement.
Cement Plastering 1:4 including cost of all material, labour and T&P etc. complete as per direction of Engineer-in-charge
Painting with snowsom including cost of all material, labour and T&P etc. complete as per direction of Engineer-in-charge
Supplying, laying and placing of Boulder 20-40 Kg for pitching including all cost of materials, labour, T & P with all lead and lift etc.and proper completion of work as per direction of Engineer-in-charge
Laying Bed Bars with C C 1:2:4 including all cost of materials, labour, T & P with all lead and lift etc.for proper completion of work as per direction of Engineer-in-charge
Providing and fixing R.C.C. Boundry Pillar as per Drawing and specification including all cost of materials, labour, T & P with all lead and lift etc.for proper completion of work as per direction of Engineer-in-charge
Providing and fixing R.C.C. Kilometre Pillar as per Drawing and specification including all cost of materials, labour, T & P with all lead and lift etc.for proper completion of work as per direction of Engineer-in-charge
Providing and fixing R.C.C. Hectometre Pillar as per Drawing and specification including all cost of materials, labour, T & P with all lead and lift etc.for proper completion of work as per direction of Engineer-in-charge
Supplying, laying and placing of Geo textile sheet 200 GSM on slope including all cost of material labour T&P etc for proper completion of work as per direction of Engineer in charge
M/S UNITE ENTERPRISES
M/S OM BALA JEE CONSTRUCTION
BHAMAR SINGH
SHIVAM ENTERPRISES
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .