Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹12.2 LAccepted-AOC | ₹12.2 L Quoted ₹12.9 L | 1 | Accepted-AOC L1 |
| 2 | 2₹13.6 LRejected-AOC | ₹13.6 L | 2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | V.M.RUHUSMON L1 | MOHAMMED BABU L2 |
|---|---|---|---|---|---|
| 1.00LABOUR CHARGE INCLUDING COST MATERIALS | |||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 126 | cum | 361.8 ₹45,586.80 | 379.97 ₹47,876.22 |
| 1.00 | OD246332/2024-2025:Sub Data for Providing Earth filled Gunny bags including cutting of the Earth, filling, conveying and placing in position (Data derived from 100.52.S.1) | 8,761 | each | 119.85 ₹10.5 L | 125.87 ₹11.0 L |
| 1.00 | 100.52.S.3:Sub Data for Supplying, conveying and covering using best quality polythene sheet on bund to protect bund from seasonal changes. | 1,584 | sqm | 23.83 ₹37,746.72 | 25.02 ₹39,631.68 |
| 1.00 | OD246333/2024-2025:Data for filling with contractors own sand in the core portion of the bund as per direction of dept officers | 276 | cum | 579.4 ₹1.6 L | 608.5 ₹1.7 L |
Tender Value
₹11.8 L
EMD Value
₹29,526
Closing Date
19 Jan 2026, 1:00 pmClosed
Assistant Executive Engineer
Office of the Assistant Executive Engineer, PH Sub Division Perinthalmanna
Construction of Temporary Bund across Kadalundi River at Oravampuram
2026_KWA_827031_1
WRD/KWA-CE(NR)/TR/ 5243/2025_26_1_1/1
Open Tender
Civil Works - Water Works
30 days
Oravampuram, Wandoor
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
₹29,526
20 Feb 2026
12 Jan 2026
20 Jan 2026
12 Jan 2026
19 Jan 2026
12 Jan 2026
12 Jan 2026 - 19 Jan 2026
LABOUR CHARGE INCLUDING COST MATERIALS
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
OD246332/2024-2025:Sub Data for Providing Earth filled Gunny bags including cutting of the Earth, filling, conveying and placing in position (Data derived from 100.52.S.1)
OD246333/2024-2025:Data for filling with contractors own sand in the core portion of the bund as per direction of dept officers
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1387641.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
KWAGeneralConditionsforeTenderingV5.pdf
PDF • 0.69 MB
Tendernotice_1.pdf
PDF • 0.04 MB
BOQ_1387641.xls
BOQ • 0.30 MB
TENDERDOCUMENTS.pdf
Tender Documents • 0.66 MB
Additionaldocuments.pdf
Additional Documents • 0.04 MB
Download all tender documents and submit your bid