Loading…
Loading…
Tender Value
₹3.8 L
EMD Value
₹9,529
Closing Date
7 Oct 2026, 5:00 pm6d left
Assistant Engineer
Assistant engineer, LID EW SECTION, KARAVALOOR
building
2026_LSGD_874364_4
05/AE/LIDEW/KVR/2026
Open Tender
Civil Works - Roads
Item Rate
180 days
KARAVALOOR
Please refer Tender documents.
9 documents required · 9 mandatory
₹845
Yes
₹9,529
Yes
30 Sept 2026
30 Sept 2026
9 Oct 2026
30 Sept 2026
7 Oct 2026
30 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1COMPOUND WALL | |||||
| 1.001 | OD123117/2026-2027:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:Dry Rubble Masonry | 23.65 | cum | - | - |
| 1.002 | 15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar | 2.3 | cum | - | - |
| 1.003 | OD123453/2026-2027:Mason for specified works | 5 | each | - | - |
| 1.004 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 13.4 | cum | - | - |
| 1.005 | OD123120/2026-2027:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good
quality blasted rubble including packing to compactness to lines and levels cost and conveyance
of all materials labour charges etc. complete as per direction of Departmental officers at site | 26.53 | cum | - | - |
| 1.006 | OD123119/2026-2027:DRY RUBBLE MASONRY using Departmental rubble _ Dry rubble without concrete levelling course masonry with good
quality blasted rubble including packing to compactness to lines and levels,
labour charges etc. complete as per direction of Departmental officers at site. | 16.55 | cum | - | - |
| 1.007 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 9.9 | sqm | - | - |
| 1.008 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 248.63 | kilogram | - | - |
| 1.009 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 4.08 | cum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.72 MB
viewsbd.pdf
Tender Documents • 2.23 MB
MER.pdf
Tender Documents • 1.01 MB
BOQ_1484606.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .