| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.8 LAccepted-AOC | L1 | Accepted-AOC accept L1 | |
| 2 | L2₹2.9 L+₹15,776.46 (5.68%)Rejected-AOC | L2 | Rejected-AOC reject L2 |
| Sl No | Description | Qty | Unit | Ajikumar.CG L1 | P D RAJU L2 |
|---|---|---|---|---|---|
| 1.00MAINTENANCE | |||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 5.35 | cum | 359.72 ₹1,925.22 Lowest | 359.72 ₹1,925.22 Lowest |
| 1.00 | OD193392/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good
quality blasted rubble including packing to compactness to lines and levels cost and conveyance
of all materials labour charges etc. complete as per direction of Departmental officers at site | 5.35 | cum | 3,993 ₹21,370.54 Lowest | 3,993 ₹21,370.54 Lowest |
| 1.00 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 6.34 | cum | 8,343 ₹52,861.25 Lowest | 8,343 ₹52,861.25 Lowest |
| 1.00 | 50.6.2.1:Solid block masonry using pre cast solid blocks (Factory made) of size 30x20x15 cm or nearest available size confirming to IS 2185 part I of 1979 for foundation and plinth with thickness 15cm in: CM 1:6 ( 1 cement :6 coarse sand) etc complete | 5.54 | cum | 6,831 ₹37,871.06 Lowest | 6,831 ₹37,871.06 Lowest |
| 1.00 | 13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) | 78.12 | sqm | 360 ₹28,123.2 Lowest | 550 ₹42,966 |
| 1.01 | 15.31:Dismantling tiled roofing with battens, boarding etc. complete including stacking of serviceable material and disposal of unserviceable material within 50 metres lead. | 58.2 | sqm | 217 ₹12,629.4 Lowest | 217 ₹12,629.4 Lowest |
| 1.01 | 10.16.1:Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete.Hot finished welded type tubes | 330 | kg | 194 ₹64,020 Lowest | 194 ₹64,020 Lowest |
| 1.01 | 50.10.2:Steel work for purlin/single section with G I pipes including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete | 230 | kg | 187 ₹43,010 Lowest | 187 ₹43,010 Lowest |
| 1.01 | 12.49:Providing & laying on roof pressed clay tile ridge (Mangalore tile) of 20 mm thickness and of approved pattern on steel frame work complete (steel frame work to be paid separately ). | 13.5 | metre | 97 ₹1,309.5 Lowest | 97 ₹1,309.5 Lowest |
Tender Value
₹2.8 L
EMD Value
₹6,967
Closing Date
20 Sept 2025, 2:00 pmClosed
ASSISTANT ENGINEER
KULAKKADA GP
KULAKKADA GP 2025_26 MAINTENANCE OF ANGANWADI NO 57_PRNO 141_26
2025_LSGD_796401_4
2/AE/LSGD/KDA/2025-26
Open Tender
Civil Works - Buildings
Item Rate
180 days
KULAKKADA GP
Please refer Tender documents.
8 documents required · 8 mandatory
₹615
Yes
₹6,967
Yes
31 Oct 2025
12 Sept 2025
23 Sept 2025
12 Sept 2025
20 Sept 2025
12 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1318106.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .