Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.5 LAccepted-AOC DWS DIVISION KAMALPUR DHALAI TRIPURA | GOMATI | TRIPURA | 799104 | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹28.4 L+₹85,054.35 (3.09%)Rejected-Finance AMBAGAN BISHALGARH SEPAHIJALA TRIPURA PIN 799102 | BISHALGARH | SEPAHIJALA | TRIPURA | 799102 | L2 | Rejected-Finance Being L2 | |
| 3 | L3₹28.6 L+₹1.1 L (4.14%)Rejected-Finance VILL P O BALIGAON KAMALPUR DHALAI TRIPURA PIN NO 799278 | DHALAI | TRIPURA | 799278 | L3 | Rejected-Finance Being L3 | |
| 4 | L4₹29.6 L+₹2.1 L (7.55%)Rejected-Finance | L4 | Rejected-Finance Being L4 | |
| 5 | L5₹29.6 L+₹2.1 L (7.67%)Rejected-Finance RUPASHPUR KAMALPUR KAMALPUR DHALAI TRIPURA PIN NO 799285 | DHALAI | TRIPURA | 799285 | L5 | Rejected-Finance Being L5 |
Tender Value
₹38.8 L
EMD Value
₹77,675
Closing Date
17 Jan 2024, 3:00 pmClosed
Executive Engineer, PWD (WR D-V), Kamalpur
Executive Engineer, PWD (WR D-V), Kamalpur
Extension of Brick line canal at Malaya HPLI scheme under Mohanpur GP of Durgachowmuhani RD Block during the year 2023 24 SH Construction of brick line canal
2023_CEWR_45301_1
10/SE/WRC-II/DNIeT/KGT/2023-24
Open Tender
Civil Works - Water Works
Percentage
90 days
Kamalpur
Please refer to tender documents
7 documents required · 7 mandatory
₹1,000
₹77,675
Yes
20 Feb 2024
27 Dec 2023
17 Jan 2024
27 Dec 2023
17 Jan 2024
27 Dec 2023
eProcurement System of Government of Tripura Created By: Arun Kumar Murasing Created Date/Time: 17-Jan-2024 04:16 PM Tender Title: Extension of Brick line canal at Malaya HPLI scheme under Mohanpur GP of Durgachowmuhani RD Block during the year 2023 24 SH Construction of brick line canal Tender ID: 2023_CEWR_45301_1
Tender Inviting Authority : Executive Engineer, W.R. Division No-V, Kamalpur.
Name Of Work :- Extension of Brickline canal at Malaya HPLI scheme under Mohanpur GP of Durgachowmuhani RD Block during the year 2023-24./ SH: Construction of brick line canal.
DNIeT No. : 10/SE/WRC-II/DNIeT/2023-24
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words (Iteration 0)
1.00 Niranjan Ghosh(GSTN-16ATAPG0440P2ZT) 3883760.00 -23.83 2958259.99 Twenty Nine Lakh Fifty Eight Thousand Two Hundred and Fifty Nine
2.00 SAGAR GHOSH SARKAR(GSTN-16BTOPS3065H1Z9) 3883760.00 -29.18 2750478.83 Twenty Seven Lakh Fifty Thousand Four Hundred and Seventy Eight
3.00 TAPASH SINHA(GSTN-16FLQPS7329N1ZZ) 3883760.00 -23.75 2961367.00 Twenty Nine Lakh Sixty One Thousand Three Hundred and Sixty Seven
4.00 DIPTANU BHADRA(GSTN-NA) 3883760.00 -18.79 3154001.50 Thirty One Lakh Fifty Four Thousand One
5.00 Kanakjit Sinha(GSTN-NA) 3883760.00 -26.25 2864273.00 Twenty Eight Lakh Sixty Four Thousand Two Hundred and Seventy Three
6.00 Manfar Mia(GSTN-NA) 3883760.00 -23.56 2968746.14 Twenty Nine Lakh Sixty Eight Thousand Seven Hundred and Fourty Six
7.00 Pradip Debnath(GSTN-NA) 3883760.00 -26.99 2835533.18 Twenty Eight Lakh Thirty Five Thousand Five Hundred and Thirty Three
Lowest Amount Quoted BY: SAGAR GHOSH SARKAR(2750478.83)
BOQ Summary Details Tender Title: Extension of Brick line canal at Malaya HPLI scheme under Mohanpur GP of Durgachowmuhani RD Block during the year 2023 24 SH Construction of brick line canal Tender ID: 2023_CEWR_45301_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 SAGAR GHOSH SARKAR 2750478.83 L1
2 Pradip Debnath 2835533.18 L2
3 Kanakjit Sinha 2864273.00 L3
4 Niranjan Ghosh 2958259.99 L4
5 TAPASH SINHA 2961367.00 L5
6 Manfar Mia 2968746.14 L6
7 DIPTANU BHADRA 3154001.50 L7
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_46040.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .