Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹93,000
Closing Date
31 Aug 2021, 11:30 amClosed
EEEANDMWSCN
EEEANDMWSCN NEAR KANHIYA NAGAR METRO STATION DELHI -35
S/I/T/C of pump set at Sanjay Gandhi Transport Nagar BPS Re-invited
2021_DJB_207124_1
NIT NO. 08 (2021-2022)
Open Tender
Miscellaneous Services
Item Wise
90 days
EEEANDMWSCN
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
THROUGH DJB OFFICIAL WEBSITE IN LINK TENDER
₹93,000
Yes
26 Nov 2021
16 Aug 2021
31 Aug 2021
16 Aug 2021
31 Aug 2021
16 Aug 2021
Supply of Horizontal split casing pump with impeller and neckring (CF8),Shaft and sleeve (SS-410) & casing (CI) with suitable bearings, RPM 988 Head 45mts.Discharge 1890 m3/Hrs eff.84% Impeller SSMake : M&P/Jyoti/Kirloskar/Jyoti/KSB/LUBI
Supply of 3 phase, 315 kW,6 Pole, 988 rpm , 415 V,542 A, 50HZ , Duty S1, Insulation class F/F, Conn. Delta, Rotor 605 Y V, 320 A, temp 50 degree Celsius Slip Ring Induction motor in Frame TR6 or identical to existing installed motors for interchangeability without any modification It also includes carbon brush holders ,carbon brushes, all necessary connections between terminals , slip rings , carbon brushes etc. and complete in all respect & Suitability:- for above pump application Make:KEC
Providing ACB TP 1000 Amperes breaking capacity 50kA With Microprocessor Release MDO type AHA model Make : C&S/L&T/GE Including following items as under here a) Supply of under voltage Trip for ACB (1 No.) b) Supply of Indicating Lamp. (6Nos.) c) Supply of Voltmeter digital ,Make: AE/L&T (1 No.) d) Supply of Ammeter digital, Make: AE/L&T (1 No.) Supply of Current Transformer 2000/5, Make:Advance/AE/Savior (03 Nos.)
Providing of 800 Sq. mm Single core Aluminium Conductor,XLPEInsulated,Armoured as per IS,PVC Type Make:Havells/Polycab/Grandlay/Universal
Transportation of all equipment i.e. pump/ motor/ LRS/Cable/pipes etc. and material at site of work as per site requirement.
Fabrication/Supply of MS base frame of size 2400mm x 920mm using MS channel size 250 mm x 85 mm thickness 8 mm and MS base plates for motor and pump of suitable size and thickness. The job also including the welding, cutting and grinding of edges etc. as per site requirement .
Supply and Fixing of the new Foundation bolt size as required at site - 08 nos. in pocket by proper welding to MS frame of RCC with proper support and filling of CC for grip of foundation bolt in CC structure and also making wet layer of cement in old CC Structure for Proper mixing and required civil work with proper leveling
Placing of Pump Motors at the base frame including heavy labour and other tools and tackles with all necessary safety as per site requirement.
Installation of above pump sets after fixing of MS base frame, along with proper alignment of pump set and providing of suitable size coupling (Make-Unique/Fenner) & fixing the same with bore size of pump set complete taking all safety precautions with all tools & tackles etc.
Making connections of the Pump at the suction side with existing pipe line including providing and fixing of MS Reducer of size 600mm x 300mm of 10 mm thickness and MS Dismantling Joint / Pipe Piece duly flanged at both sides including providing all the consumables for making joints as per site requirement.
Making connections of the Pump at the delivery side with existing pipe line including providing and fixing of MS Reducer of size 600mm x 300mm of 10mm thickness and MS Dismantling Joint / Pipe Piece duly flanged at both sides including providing all the consumables for making joints as per site requirement.
Providing & Fixing of the Pressure Gauge of dia. 150mm & range from 0-100 Psi on delivery side including providing all the material, mounting of meter, carrying out all work as per site requirement. (Make Fibeg/H.Guru)
Making required connections at the Pump for making air release system with existing Pump arrangement including providing of pipes as per existing parameters and all the consumables for making joints as per site requirement.
Dismantling completely the old ACB of 1000 A complete with the cradle after disconnecting the joints from the main bus bars and the outgoing cable connections after taking proper shut down of the L. T. Panel. Dismantling all the connections required to discharge the Circuit breaker completely.
Fixing the new ACB of 1000 Amperes rating with complete housing in the chamber in proper manner including supply and fixing of MS Angle base support / frame of suitable size for mounting the ACB with supply of all the required material and complete work as required for mounting and fixing of the cradle / ACB as required.
Supply and fixing of Bus Bar lengths in aluminum construction of suitable cross section as required for making the joints of the incoming supply / main bus bars and the 1000 Amperes ACB and for making the provisions for outgoing cable connections / supply arrangement including bending / cutting / shaping of the bus bars as required. The job includes providing of nut-bolts, insulators, other consumables as per site requirement.
Dismantling the old door of the ACB chamber and fabrication and fixing of the new door fabricated in CRCA Sheet complete of size as suitable for the 1000 Amperes ACB and with suitable cut out for ACB operation and complete with painted through powder coating and complete with other accessories like locks, hinges etc. as required.
Reconditioning / Renovation of the metering / control system of the ACB by replacement of the defected measuring / Indicating instruments along with restoration of complete wiring connections including providing / fixing of all material / copper wires etc. for the work as per site requirement.
Laying of cables between ACB/LT Panel and motor and also between the motor and the LRS in cable trench/tray as per site requirement.
Making the required connections / joints at Motor sides, ACB side and LRS side including thimbling / end terminations of the cables including providing all the material for the work as per site requirement.
Testing and Commissioning of the complete system - Pump / Motors / LRS / ACB after completion of all the above works first at No Load & then at On Load The job further includes any left out items required during execution of work will be responsibility of firm & no extra payment will be paid
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .