Tender Value
₹24.9 L
EMD Value
₹24,912.68
Closing Date
10 Jul 2026, 6:00 pm2d left
The Chief Officer, Amod Municipality, Amod
Construction of Compound wall in Amod Motu lake (Balance C.wall - 240 meter) For Amod Nagar Palika.(THIRD ATTEMPT)
316925
2025-2026
Open
Civil - All
Bharuch
1 document required · 1 mandatory
₹1,062
The Chief Officer, Amod Municipality, Amod
₹24,912.68
23 Jun 2026
23 Jun 2026
23 Jun 2026
10 Jul 2026
23 Jun 2026
Name Of Work : Construction of Compound wall in Amod Motu lake (Balance C.wall -240 meter)
FOR AMOD NAGAR PALIKA.
Item Quanties Item of work Estimate Rates Unit Total amount
Item Quanties Item of work Estimate Rates Unit Total amount
No. estimated In In Words accorinding
but may Figures estimated
Boring holes 2.5 m deep in
ordinary soil (for cast in situ piles)
and getting out the soil and Rupees Nine Hundred
1 89.00 disposal of the surplus excavated 907.22 Seven and Twenty Two Nos
soil as directed within a lead of Paisas Only
50 Meter for following diameter of
pipes.(ii) 250 mm
Excavation for foundation upto
1.5 m depth including sorting out
Rupees One Hundred
and stacking of useful materials
2 18.30 117.08 Seventeen and Eight Cum
and disposing off the excavated
stuff upto 50 Meter lead.(A)
Loose or soft soil
Filling available excavated earth
(excluding rock) in trenches.
plinth, sides of foundations etc. in Rupees One Hundred
3 4.60 layers not exceeding 20 cm. in 130.39 Thirty and Thirty Nine Cum
depth consolidating each Paisas Only
disposited layer by ramming and
Providing and laying controlled
cement concrete M.250 and
curing complete excluding the
Rupees Four Thousand
cost of formwork and
4 11.00 4070.58 Seventy and Fifty Eight Cum
reinforcement for reinforced Paisas Only
concrete work in (A) Foundations,
footings, Base of columns and
Providing and laying cement
concrete 1:3:6 (1- Cement :
Rupees Two Thousand
3Coarse sand : 6- Graded brick
Nine Hundred Seventy
5 6.90 bat aggregate 40mm normal 2976.73 Cum
Six and Seventy Three
size) and curing complete Paisas Only
excluding cost of formwork in (A)
Foundation and Plinth
Item Quanties Item of work Estimate Rates Unit Total amount
Item Quanties Item of work Estimate Rates Unit Total amount
No. estimated In In Words accorinding
but may Figures estimated
Providing and laying controlled
cement concrete work M250 and
curing complete including the
cost of form work but excluding Rupees Six Thousand
6 24.30 reinforcement of reinforced 6046.87 Forty Six and Eighty Cum
concrete work in : (C) Seven Paisas Only
Slabs,landing,shelves,Balconies
Lintels, Beams, Girders and
Cantilever upto floor two level.
Providing and laying controlled
cement concrete work M250 and
curing complete including the
7 18.50 8008.29 Thousand Eight and Cum
cost of form work but excluding
Twenty Nine Paisas Only
reinforcement of reinforced
concrete work in : Column
Brick work using common burnt
clay building bricks having
crushing strength not less than Rupees Four Thousand
8 45.50 35 kg./Sq.Cm. in foundation and 4320.08 Three Hundred Twenty Smt
plinth in Cement Mortar 1:5 (1- and Eight Paisas Only
Cement : 6 -fine sand)(B)
Providing TMT Bar FE 500D
reinforcement for R.C.C. work
Rupees Seventy Six and
9 8069.50 including bending, binding and 76.21 Kgs
Twenty One Paisas Only
placing in position complete upto
floor two level
20mm thick sand faced cement
plaster on walls upto height
metres above ground level
Rupees Three Hundred
consisting of 12mm thick backing
10 764.00 329.29 Twenty Nine and Twenty Smt
coat of C.M. 1:3 (1-cement : 3-
Nine Paisas Only
sand) and 8mm thick finishing
coat of C.M. 1:1 (1-cement : 1-
sand) etc. complete.
Item Quanties Item of work Estimate Rates Unit Total amount
Item Quanties Item of work Estimate Rates Unit Total amount
No. estimated In In Words accorinding
but may Figures estimated
Finishing wall with weather proof
exterior emulsion paint on wall
surface (two coats) to give an
required shape even shade after
thoroughly brushing the surface
to remove all dirt, and remains of
loose powdered materials.etc
Rupees One Hundred
complete including Applying two
11 764.00 155.13 Fifty Five and Thirteen Smt
coats of putty & two coats of
primer of approved brand and
manufacture on new wall surface
to give an even shade including
thoroughly brushing the surface
free from mortar dropping and
other foreign matter and sand
papered smooth.
Providing & laying weep hole in
Aburtments, and returns by using
A.C. pipe of 100mm including Rupees Eighty Two and
laying in proper grede and Fifty Seven Paisas Only
jointing the completed as per
detailed specification.
Providing and fixing M.S. grills of
required pattern to wooden
frames of windows etc. with M.S.
flats at required spacings and
Rupees One Hundred
frame alround, square or round
13 4215.00 102.62 Two and Sixty Two Kgs
bars with round headed bolts and
nuts or by screws. (A) Plain
GRILL including one coat of
primer and two coats of enamel
Dismantling Credit
Rupees Twenty Four Lacs Ninety One Thousand Two Hundred Sixty Eight Only
Municipal Engineer Chief Officer
Signature of the Amod Nagar Palika Amod Nagar Palika
Contractor. Amod Amod
I / We am / are willing to carry out the work at…………………. % Below / Above ………..
Percent (should be written in Figurs and words / Below Above the estimate rates mentioned above Amount of my /
Item Quanties Item of work Estimate Rates Unit Total amount
Item Quanties Item of work Estimate Rates Unit Total amount
No. estimated In In Words accorinding
but may Figures estimated
Our tender works Out as Under :-
Estimated Amount Put to Estimated Amount Put to
Put to Tander Rs. 2491268.01 Put to Tander Rs.
Signature of the Contractor. Chief Officer
Amod Nagar Palika
Note All Works shall be carried out as Public works Department Handbook and other specifications pf Division or as
GM\W ov ! AW] H SFD AF\WSFD lJEFUGL 5]l:TSF VG[ 0LJLhGGL ALÒ BF; lJUT D]HA VYJF ;]RGF 5|DF6[ SZL VF5JFG]\ ZC[X[P
Note All the Column in Schedule should be filled in ink or ball pen and Total of the entires in last
: 2 column should be struck by the contractor under his signature.
GM\W ov Z VG;}lRDF\ AWF BFGFGL lJUTM XFCLYL EZJL VG[ K[<,F BFGFGL GM\WGM ;ZJF/M SZL SM\g8=FS8Z[ 5MTFGL ;CL SZJLP
Note Rates quoted include clearance of site (Prior commencement of works and at its close ) in all respects and hold
: 3 good for work under all conditions,site,moisture,weather etc.
8F\S[,F NZDF\4:Y/GL sSFDGF\ VFZ\E[ VG[ 5]~ YFI T[ JBT[ f NZ[S ZLT[ ;FO ;]OL SZJFG]\ ;DFJ[X YFI K[ VG[ T[ NZ TDFD 5lZl:YTL 4 :Y/ 4E[H 4 CJFDFG lJU[Z[
C[9/ SFD DF8[ VD,DF\ ZC[X[P
Note To be continued on additional sheets, if found necessary.
GM\W ov $ H~Z H6FI JWFZFGF SFU/M HM0L RF,] ZFBJ]\
Note Bidder have to deposit Dismantling Credit FDR/DD to nagar palika at a time of W.O and after
: 5 disucting dismantling credit from R.A.Bill 01 the FDR will be returned to bidder.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Building Specification Book.pdf
SBD.pdf
SCHEDULE-B.pdf
Site Visit Must Attach.pdf
Term and Conditiontion.pdf
NIT.pdf
Download all tender documents and submit your bid