Loading…
Loading…
Tender Value
₹8.3 L
EMD Value
₹20,730
Closing Date
12 Oct 2026, 5:00 pmClosed
Executive Engineer,PMU ,Kattakada.
O/o Executive Engineer,PMU,Kattakada
Reconductoring the Branch Lines of Tholicode feeder (Alumkuzhi) under Electrical Section, Palode of Electrical Division, Nedumangad under Electrical Circle, Kattakada
2026_KSEB_870176_1
EE/PMU(KTDA)/ET-31/2026-27 dated 15.09.2026
Open Tender
Electrical Works
Percentage
120 days
Palode
6 documents required · 6 mandatory
₹2,006
₹20,730
12 Oct 2026
15 Sept 2026
15 Oct 2026
15 Sept 2026
12 Oct 2026
15 Sept 2026
15 Sept 2026 - 22 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Stringing of 11 kV Aerial bunched cable of size 3 x 120 + 1 x 95 sqmm with bare/insulated Messenger through existing poles | 1,700 | m | 45.62 | ₹77,554 |
| 2 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 numbers of poles excluding loading& unloading charges. | 19 | Trip | 3,142.26 | ₹59,702.94 |
| 3 | Labour charges for loading HT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle). | 69 | No | 762.14 | ₹52,587.66 |
| 4 | Providing one Earth using GI earth pipe of size 38.1mm dia, 2.5m length including digging separate pit (0.45x0.45x2.5m) at standard distance (1.5m) away from the pole/structure in ordinary soil & backfilling the pit with 15cm alternate layer of charcoal, salt and sand up to 90cm from the bottom. including the cost of 20kg salt, 25kg charcoal, excluding supply of earth pipe. | 13 | No | 4,245.59 | ₹55,192.67 |
| 5 | Labour charges for loading HT A type pole from the stacking place and unloading the same at work site (transportation by any vehicle). | 4 | No | 906.41 | ₹3,625.64 |
| 6 | Fitting and erecting one HT PSC Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil (as per standards), drawing sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing). | 63 | No | 3,274.36 | ₹2,06,284.68 |
| 7 | Fitting and erecting one HT A type Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil (as per standards), drawing sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing). | 2 | No | 4,143.14 | ₹8,286.28 |
| 8 | Fitting and erecting one HT Four legged lattice structure in position including fitting cross arm, digging and back filling pit in ordinary soil (as per standards), drawing sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing). | 1 | No | 5,973.73 | ₹5,973.73 |
| 9 | Fitting and providing one HT Stay for 11kV pole, including digging and back filling pit in ordinary soil. | 60 | No | 1,373.73 | ₹82,423.8 |
| 10 | Fitting and erecting one HT Double Pole Structure using PSC pole in position including fitting 2 channel cross arms, digging and back filling pit in ordinary soil, drawing sufficient length of GI earthing leads through all cross arms to the ground for earthing (excluding provision of earthing). | 3 | No | 8,735.82 | ₹26,207.46 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.06 MB
BOQ_1474367.xls
BOQ • 0.36 MB
BID31.pdf
Tender Documents • 0.35 MB
Corrigendum2.pdf
PDF • 0.03 MB
Corrigendum1.pdf
PDF • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .