| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹12.8 LAdmitted-Finance | -35.15% | ₹12.8 L | L1 | Admitted-Finance |
| 2 | L2₹13.1 L+₹26,731.75 (2.08%)Admitted-Finance | -33.80% | ₹13.1 L+₹26,731.75 (2.08%) | L2 | Admitted-Finance |
| 3 | L3₹13.4 L+₹52,473.44 (4.09%)Admitted-Finance | -32.50% | ₹13.4 L+₹52,473.44 (4.09%) | L3 | Admitted-Finance |
| 4 | L4₹15.2 L+₹2.4 L (18.7%)Admitted-Finance | -23.00% | ₹15.2 L+₹2.4 L (18.7%) | L4 | Admitted-Finance |
Tender Value
₹19.8 L
EMD Value
₹39,600
Closing Date
30 Jul 2026, 4:00 pmClosed
EXECUTIVE ENGINEER ELECTRIC DIVISION SOPORE
EXECUTIVE ENGINEER ELECTRIC DIVISION SOPORE
R AND M of Distribution Substation (in ED Sopore) under UT Capex 2026-27
2026_PDD_315105_1
EMDS/25
Open Tender
Electrical Works
Percentage
45 days
R AND M of Distribution Substation (in ED Sopore)
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,000
Yes
EXECUTIVE ENGINEER ELECTRIC DIVISION SOPORE
₹39,600
Yes
12 Aug 2026
8 Jul 2026
1 Aug 2026
8 Jul 2026
30 Jul 2026
9 Jul 2026
8 Jul 2026 - 9 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supply, installation, testing and commissioning including carriage, loading & un-loading etc. of :
R&M of Distribution Sub-station (100kva sub station at Hospital Sopore) under UT Capex 2026-27
(Complete Job)
(Detailed Estimate is in the SBD ) | 1 | Job | 1,07,458 | ₹1,07,458 |
| 2 | Supply, installation, testing and commissioning including carriage, loading & un-loading etc. of :
R&M of Distribution Sub-station ( 400kva sub station at Samad ) under UT Capex 2026-27
(Complete Job)
(Detailed Estimate is in the SBD ) | 1 | Job | 1,07,458 | ₹1,07,458 |
| 3 | Supply, installation, testing and commissioning including carriage, loading & un-loading etc. of :
R&M of Distribution Sub-station ( 250kva sub station at Noorbagh Sopore) under UT Capex 2026-27
(Complete Job)
(Detailed Estimate is in the SBD ) | 1 | Job | 1,07,458 | ₹1,07,458 |
| 4 | Supply, installation, testing and commissioning including carriage, loading & un-loading etc. of :
R&M of Distribution Sub-station (250kva sub station at Samad ) under UT Capex 2026-27
(Complete Job)
(Detailed Estimate is in the SBD ) | 1 | Job | 1,07,458 | ₹1,07,458 |
| 5 | Supply, installation, testing and commissioning including carriage, loading & un-loading etc. of :
R&M of Distribution Sub-station ( 250kva sub station at Wani Mohalla Sangrama ) under UT Capex 2026-27
(Complete Job)
(Detailed Estimate is in the SBD ) | 1 | Job | 88,171 | ₹88,171 |
| 6 | Supply, installation, testing and commissioning including carriage, loading & un-loading etc. of :
R&M of Distribution Sub-station ( 400kva sub station at Kushal Colony) under UT Capex 2026-27
(Complete Job)
(Detailed Estimate is in the SBD ) | 1 | Job | 1,91,322 | ₹1,91,322 |
| 7 | Supply, installation, testing and commissioning including carriage, loading & un-loading etc. of :
R&M of Distribution Sub-station (250kva & 100kva sub station at Hatishah ) under UT Capex 2026-27
(Complete Job)
(Detailed Estimate is in the SBD ) | 1 | Job | 2,60,305 | ₹2,60,305 |
| 8 | Supply, installation, testing and commissioning including carriage, loading & un-loading etc. of :
R&M of Distribution Sub-station ( 100kva sub station at Shalimar Colony Warpora) under UT Capex 2026-27
(Complete Job)
(Detailed Estimate is in the SBD ) | 1 | Job | 1,84,801 | ₹1,84,801 |
| 9 | Supply, installation, testing and commissioning including carriage, loading & un-loading etc. of :
R&M of Distribution Sub-station ( 100kva sub station at Ashtan Mohalla Sagipora) under UT Capex 2026-27
(Complete Job)
(Detailed Estimate is in the SBD ) | 1 | Job | 2,08,475 | ₹2,08,475 |
| 10 | Supply, installation, testing and commissioning including carriage, loading & un-loading etc. of :
R&M of Distribution Sub-station ( 63kva sub station at Chopan Mohalla Dangerpora) under UT Capex 2026-27
(Complete Job)
(Detailed Estimate is in the SBD ) | 1 | Job | 2,02,506 | ₹2,02,506 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.48 MB
DrawingsCumSpecification.pdf
Additional Documents • 18.28 MB
BOQ_1021118.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .