Loading…
Loading…
Tender Value
₹16.6 L
EMD Value
₹17,000
Closing Date
15 Oct 2026, 6:00 pm
the Executive Engineer, R & B Division, Mehsana
S.R to Taluka Seva Sadn at Vadnagar (Pro.Parking Shed, Paving Block and Other Mis. Work)
348046
5 FOR 2026-2027 SN- 7
Open
Civil Works - Buildings
Works
Mehsana
7 documents required · 7 mandatory
₹900
Executive Engineer, R&B Division, Mehsana
₹17,000
23 Sept 2026
23 Sept 2026
23 Sept 2026
15 Oct 2026
23 Sept 2026
Bill of Quantities
QUANTITY STATEMENT
It. No. Description of item Quantity Unit Rate Total Amount
It. No. Description of item Quantity Unit Rate Total Amount
In Figures In words
1 Excavation for foundation upto 1.5M depth including sorting out 174.00 Cmt 117.08 Rupees One
and stacking of useful materials and disposing of the excavated Hundred Seventeen
stuff upto 50 Mt. lead. (A) Loose or soft soil (SOR 2024-25 It. Code And Paise Eight
2 Providing and laying cement concrete 1:4:8 (1 cement; 4 coarse sand; 103.00 Cmt 2680.21 Rupees Two
8 hand broken stone aggregate 40mm nominal size ) and curing Thousand Six
complete excluding cost of form work in (A) Foundation and plinth. Hundred Eighty
(SOR 2024-25 It. Code -05004A) And Paise Twenty
3 Providing and fixing pre-cast Rubber Dye / steel Dye inter locking 679.00 Smt 4021.02 Rupees Four
concrete block 60mm thick with grade of concrete M300 pnumatic Thousand Twenty
compressed / vibrated mechanically and as per approved design One And Paise
Confirming to IS 15658 : 2006 including 35 mm Sand layer for Two Only
levelling and filling the joint with sand in proper line and level as per
guidlines of IRC : SP 63-2018 etc. Complete.. (SOR 2024-25 It. Code -
4 Providing and laying cement concrete 1:2:4 (1 cement; 2 coarse sand; 4 3.00 Cmt 4061.21 Rupees Four
graded stone aggregate 20mm nominal size ) and curing complete Thousand Sixty
excluding cost of form work in (A)Foundation and plinth. (SOR 2024- One And Paise
25 It. Code -05010AA) Twenty One Only
5 Steel work, riveted in built up sections framed work including 97.00 Qntl. 4046.21 Rupees Four
cutting, hoisting, fixing in position and applying a priming coat of Thousand Forty
red lead paint. (A) In beams and joists, channels angles Tees, flats, with Six And Paise
connecting plates or angle cleats as in main and cross beams. Hip and Twenty One Only
jack rafters, purlins conneted to common rafters and the like.(SOR
2024-25 It. Code-11001AA)
6 Providing and fixing pre-cast concrete kerb stone of gray cement 32.00 Rmt 67.26 Rupees Sixty Seven
based concrete block 30cm length,30cm height and 15cm thick of And Paise Twenty
M200 grade concret as per approved design and including Six Only
excavation for fixing in proper line and level,filling the joint with
C:M 1:3 (1cement:3fine sand) etc complete.(SOR 2024-25 It. Code-
7 Providing corruated PPGL Sheets roofing fixed with galvanized iron 'J' 335.00 Smt 138.71 Rupees One
or 'L' hooks bolts and nuts 8 m. Diameter with bitumen and G.I. Limpet Hundred Thirty
wahsher filled with white lead complete including ridges, gutters etc. Eight And Paise
Excluding the cost of purlins, rafters and trusses. (1) 0.60 mm. thick Seventy One Only
8 Painting two coats (excluding priming coat) on new steel and other 168.00 Smt 114.53 Rupees One
metal surface with enamel paint, brushing, interior to give an even Hundred Fourteen
shade including cleaning the surface an even shade including cleanicn And Paise Fifty
the surface of all dirt, dust and other foreign matter.(SOR 2024-25 It. Three Only
Total Bid Price (in Figure)
(in words) Rupees Forty Nine Lakhs Ninety Six Thousand One Hundred Eighty Two and Paise Thirty
I/We am/are willing to carry out the work at ___________% above/below the (percentage should bewritten in figure and words only) Estimated rates as mentioned
above,amount of my/our tender works out as under.
Estimated Amount Estimated Amount
Put to Tender: RS. Put to Tender: RS.
Net : RS. Total : RS.
In Words RS. In Words RS.
(Please Strike out whichever is not applicable)
1 The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-In-Charge for which no extra payment
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
QUANTITY STATEMENT
It. No. Description of item Quantity Unit Rate Total Amount
It. No. Description of item Quantity Unit Rate Total Amount
In Figures In words
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.: PRC-10/2017 Cement Consumption/16/C
Date:11/05/2017 as stated in S.O.R. therefore in R.C.C. items where there is a change as per actual mix design the cost of difference of cement
consumption have been deducted from the rate of original item at the rate of input rate mentioned in all the tender.
Deputy Executive Engineer Executive Engineer
Signature of contractor R&B Sub Division, R&B Division
Visnagar Mehsana
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
2.GR to be attached with DTP_SBD.pdf
BUILDINGSPECIFICATIONSBOOK(NEW).pdf
INDEX SPE.pdf
SCHEDULE b.pdf
Specs_.pdf
TESTING SCHE.pdf
SBD BOOK 1_0001.pdf
SBD BOOK 2_0001.pdf
SBD BOOK 3_0001.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .