Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.3 LAccepted-AOC | ₹30.3 L Quoted ₹33.2 L | L1 | Accepted-AOC Being lowest bidder |
| 2 | L2₹34.0 LRejected-Finance | ₹34.0 L | L2 | Rejected-Finance Other than lowest bidder |
| 3 | L3₹34.3 LRejected-Finance | ₹34.3 L | L3 | Rejected-Finance Other than lowest bidder |
| 4 | L4₹35.9 LRejected-Finance | ₹35.9 L | L4 | Rejected-Finance Other than lowest bidder |
| 5 | L5₹37.2 LRejected-Finance 1ST FLOOR SHOP NO 206 NEAR GRAIN MARKIT NEW MANDI TOWN SHIP AMBALA SECTOR 8 AMBALA HARYANA 134003 UDYAM HR 01 0027527 | AMBALA | HARYANA | 134003 | ₹37.2 L | L5 | Rejected-Finance Other than lowest bidder |
| Sl No | Description | Qty | Unit | R. P. Suppliers and Construction Co. L1 | AMBALA ENGINEERING CO L6 | RAJINDER KUMAR AND ASSOCIATES L4 | Krishna builders L2 | VIJ ENGINEERS L5 | M/s Seerat Enterprises L3 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Attending day to day complaints lodge in complaint register or ARMAAN app of interrupted/breakdown of external water supply and repair to make the continuity of external water supply after detecting & rectifying the defect such as replacement of nipple, tee,union,socket or blockage in any pipe from 15mm to size 25 mm and other minor items such as required in order to make good the continuity of water supply to the entire satisfaction of Engineer-in-Charge.
Note:- (a) This item pertains to attending complaints of external water supply such as T&P and safety tools will be the responsibility of contractor etc as required in order to attend the complaint to the entire satisfaction of user/Engineer-in-Charge.
(b) Rs. 100/- per day will be recovered from contractor payment if fail to rectify complaint within 24 hrs. Necessary exacavation /digging wherever required for the rectification of complaint will be done by the contractor and no extra amount will be paid seperately. | 2,900 | Each Job | 150 ₹4.3 L | 156 ₹4.5 L | 160 ₹4.6 L | 130 ₹3.8 L | 125 ₹3.6 L | 160 ₹4.6 L |
| 2.00 | Attending day to day complaints lodge in complaint register or on ARMAAN app of interrupted/breakdown of external water supply and repair to make the continuity of external water supply after detecting & rectifying the defect such as replacement of nipple, tee,union,socket or blockage in any pipe from 40 mm to 80 mm and other minor items such as required in order to make good the continuity of water supply to the entire satisfaction of Engr in Charge.
Note:- (a) This item pertains to attending complaints of external water supply such as T&P and safety tools will be the responsibility of contractor etc as required in order to attend the complaint to the entire satisfaction of user/Engineer-in-Charge.
(b) Rs. 200/- per day will be recovered from contractor payment if fail to rectify complain within 24 hrs. Necessary exacavation /digging wherever required for the rectification of complaint will be done by the contractor and no extra amount will be paid seperately.
Note for Ser Item No 1.00 & 2.00 :-
Fittings such as union, elbow, nipple, socket, reducers, tee and dead plug required for rectification of complaint will be measured and paid under. | 720 | Each Job | 150 ₹1.1 L | 145 ₹1.0 L | 180 ₹1.3 L | 180 ₹1.3 L | 180 ₹1.3 L | 180 ₹1.3 L |
| 3.00Supply only in repair the following sizes GI specials to be fixed in existing / relaying GI tubing where required for making serviceable of the line complete all as specified and directed. | |||||||||
| 3.01 | GI union15mm | 435 | Each | 40 ₹17,400 | 38 ₹16,530 | 20 ₹8,700 | 67 ₹29,145 | 20 ₹8,700 | 50 ₹21,750 |
| 3.02 | GI union 20mm | 720 | Each | 40 ₹28,800 | 46 ₹33,120 | 30 ₹21,600 | - | 25 ₹18,000 | 60 ₹43,200 |
| 3.03 | GI union 25mm | 240 | Each | 75 ₹18,000 | 54 ₹12,960 | 40 ₹9,600 | - | 45 ₹10,800 | 70 ₹16,800 |
| 3.04 | GI union 40 mm | 380 | Each | 100 ₹38,000 | 73 ₹27,740 | 60 ₹22,800 | - | 80 ₹30,400 | 90 ₹34,200 |
| 3.05 | GI union 50 mm | 240 | Each | 250 ₹60,000 | 106 ₹25,440 | 120 ₹28,800 | - | 120 ₹28,800 | 110 ₹26,400 |
| 3.06 | GI union 80 mm | 150 | Each | 300 ₹45,000 | 118 ₹17,700 | 140 ₹21,000 | - | 200 ₹30,000 | 250 ₹37,500 |
| 3.07 | GI elbow 15mm | 280 | Each | 25 ₹7,000 | 24 ₹6,720 | 10 ₹2,800 | - | 15 ₹4,200 | 20 ₹5,600 |
Updated dates
Tender Value
₹49 L
EMD Value
₹98,000
Closing Date
16 May 2026, 6:00 pmClosed
GE UTILITY AMBALA
GE UTILITY AMBALA CANTT 133001
COMPREHENSIVE MAINT REPAIR REPLACEMENT ATTENDING BREAKDOWN AND ALLIED WORKS FOR GI CI AND DI WATER PIPELINES FOR EXTERNAL WATER SUPPLY RAISING MAIN SYSTEM AT SECTOR A UNDER GE U AMBALA CANTT
2026_MES_760751_1
CA NO GE U AMB 27 OF 2026-27
Open Tender
Civil Works
240 days
GE UTILITY AMBALA CANTT
AS PER TENDER DOCUMENTS
8 documents required · 8 mandatory
₹500
GE UTILITY AMBALA CANTT
₹98,000
4 Jun 2026
17 Apr 2026
18 May 2026
17 Apr 2026
16 May 2026
2 May 2026
17 Apr 2026 - 24 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
Attending day to day complaints lodge in complaint register or ARMAAN app of interrupted/breakdown of external water supply and repair to make the continuity of external water supply after detecting & rectifying the defect such as replacement of nipple, tee,union,socket or blockage in any pipe from 15mm to size 25 mm and other minor items such as required in order to make good the continuity of water supply to the entire satisfaction of Engineer-in-Charge.
Note:- (a) This item pertains to attending complaints of external water supply such as T&P and safety tools will be the responsibility of contractor etc as required in order to attend the complaint to the entire satisfaction of user/Engineer-in-Charge.
(b) Rs. 100/- per day will be recovered from contractor payment if fail to rectify complaint within 24 hrs. Necessary exacavation /digging wherever required for the rectification of complaint will be done by the contractor and no extra amount will be paid seperately. | - | Each Job | - | - | |
Attending day to day complaints lodge in complaint register or on ARMAAN app of interrupted/breakdown of external water supply and repair to make the continuity of external water supply after detecting & rectifying the defect such as replacement of nipple, tee,union,socket or blockage in any pipe from 40 mm to 80 mm and other minor items such as required in order to make good the continuity of water supply to the entire satisfaction of Engr in Charge.
Note:- (a) This item pertains to attending complaints of external water supply such as T&P and safety tools will be the responsibility of contractor etc as required in order to attend the complaint to the entire satisfaction of user/Engineer-in-Charge.
(b) Rs. 200/- per day will be recovered from contractor payment if fail to rectify complain within 24 hrs. Necessary exacavation /digging wherever required for the rectification of complaint will be done by the contractor and no extra amount will be paid seperately.
Note for Ser Item No 1.00 & 2.00 :-
Fittings such as union, elbow, nipple, socket, reducers, tee and dead plug required for rectification of complaint will be measured and paid under. | - | Each Job | - | - | |
Supply only in repair the following sizes GI specials to be fixed in existing / relaying GI tubing where required for making serviceable of the line complete all as specified and directed. | - | - | - | - | |
GI union15mm | - | Each | - | - | |
GI union 20mm | - | Each | - | - | |
GI union 25mm | - | Each | - | - | |
GI union 40 mm | - | Each | - | - | |
GI union 50 mm | - | Each | - | - | |
GI union 80 mm | - | Each | - | - | |
GI elbow 15mm | - | Each | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.52 MB
BOQ_852187.xls
BOQ • 0.28 MB
Tender.pdf
Tender Documents • 0.71 MB
Download all tender documents and submit your bid