All Bids
RequiredThe Bidder should have experience in manufacture & supply of Seamless Boiler Tubes of grades SA 210 Gr.A1 or Higher Grade Boiler tubes like SA 213 T22, SA213 T91 to 210 MW and higher capacity Thermal Power Stations of TGGENCO/APGENCO/NTPC/BHEL prior to the date of submission of the bid. (Note: Copy of Purchase orders & its invoices shall be uploaded in tender schedule.)
RequiredThe Bidder should have manufactured and supply of Seamless Boiler Tubes of grades SA 210 Gr.A1 or Higher Grade Boiler tubes like SA 213 T22, SA213 T91 to 210 MW and higher capacity successfully at least One Order over past (03) Three years prior to the date of submission of the bid. (Note: Copy of Purchase orders & its invoices for Boiler Tubes shall be uploaded.)
RequiredThe Bidder shall submit Performance certificate(s) issued by the Station head of the Thermal power stations, confirming that the supplied Seamless Boiler Tubes served the Guarantee Period, as stipulated in their Purchase order and its performance is found to be satisfactory
RequiredThe Bidder shall submit Audited Financial Statements, for the last (03) three years.
RequiredThe Bidder must contain all the required manufacturing, proper heat treatment and testing facilities as per the relevant IS codes and documentary proof shall be enclosed. All Schedules duly filled in signed & stamped must be uploaded in tender schedule.
RequiredDelivery period: Within 8 Weeks from the date of Purchase Order/Letter of Indent.
RequiredEach tube shall contain hard stamping identification mark as in the test certificate (Form-IIIB) and highlighted.
RequiredTubes Heat Number, ASTM/ASME material Grade and Tubes Size-OD and thickness shall be marked in each tube
RequiredLength of the Tubes should be 7.5 to 9 Metres length.
RequiredAll Tubes shall have Rust Preventive Epoxy Paint coating on the external as follows: The Tubes shall be coated with suitable Rust Preventive Epoxy Paint with minimum DFT of 50 Microns. Epoxy Paint coated steel surfaces shall be capable of withstanding salt spray corrosion test for minimum 1000 Hours. The inside surface of the tube shall be protected with volatile corrosive rust inhibitor. Rust p
RequiredBoth ends of the Tubes are to be Yellow colour code for SA210 Gr.A1 to be painted, plugged with plastic end caps.
RequiredTGGENCO reserves the right to test the material supplied randomly at TGGENCO site, if required at approved/accredited lab and Cost for the test to be borne by the Bidder, if test result found not as per the standard specifications, material has to be replaced with NEW material with own expenses of the Bidder.
RequiredOriginal IBR Test Certification FORM-IIIB shall be furnished along with the supply of materials at free of cost. If the tubes are supplied from Sources other than India, the above Certificate shall be in the respective form duly signed by the Chief Inspecting Authority authorized by Central Boiler Board-India.
RequiredTGGENCO reserves right to visit the suppliers works to audit and inspect to ensure the capability for technical evaluation.
RequiredTGGENCO reserves right to inspect the item ordered at any stage of manufacturing and if found not meeting the stipulated condition, the material is liable for rejection.
RequiredTGGENCO reserves the rights to reject, if the Bidder who have previously supplied to TGGENCO/APGENCO or any other thermal power stations in India and their performance is found to be not satisfactory.
RequiredResponsibility for correctness of the information submitted in the bid lies with bidder. If any information furnished in the bid is proved to be false at a later date, the bid will not only be rejected.
RequiredThe information/documentary evidence regarding performance certificate, PO copies and finance statements shall be furnished invariably by the bidder as per Tender Specification requirements. The evaluation of the bids will be carried out as per the uploaded/ furnished information only.
RequiredBidders who are technically suitable as per tender specification enclosed can only be considered.
RequiredBidders with poor performance in executing the previous purchase orders/bidders who have executed partial supplies during the delivery period/bidders who have not supplied the material even after several notices/bidders who supplied the material lately and suffered the works/bidders whose supplies failed during guarantee performance period/black listed firms are not eligible for quoting
RequiredAcceptance of commercial terms and upload duly filled certificate.
RequiredGST registration certificate
RequiredHSN codes of the materials (6 to 8 digits) and GST rates of the offered material.
RequiredThe bidder must up load the EMD payment details i.e., scanned copy of DD or online transaction receipt.