Loading…
Loading…
Tender Value
₹16.8 L
EMD Value
₹16,815
Closing Date
18 Jun 2026, 6:00 pm
Chief Officer
CONSTRUCTION OF BEAUTIFICATION WORK AT NAGARPALIKA GARDEN AND DEVELOPMENT OF GREEN CITY-1 GVP POINT AT RANAVAV, DIST. PORBANDAR UNDER SWACHCHH SAHER SUNDAR SAHER YOJANA
310728
RANAVAVNP/CIVILWORK/SSSS/T32-02-R00
Open
Civil - All
Porbandar
3 documents required · 3 mandatory
₹900
Chief Officer, Ranavav Nagarpalika
₹16,815
3 Jun 2026
3 Jun 2026
3 Jun 2026
18 Jun 2026
3 Jun 2026
One percent of the Estimated cost of work put to tender shall be recovered from the running bills of the contractor as testing charges, after deducting
the cost of material proposed in scheduled-A at basic rate. One percent labour cess will be deducted from contractor’s bill.
I/ We am/are willing to carry out the work at _____________________% above / below _____________________________%
(should be written in figure and words)
below / above the estimated rates mentioned above amount of my / our tender works out as under :-
Estimated amount put to tender : Estimated amount put to tender :
Signature of contractor Chief Officer
RANAVAV NAGARPALIKA
SCHEDULE NAME OF WORK Amount
1) All the work shall be carried out as per MOST specification and specification on the division or as directed.
Rates quoted includes clearance of site (prior to commencement of work and at its closed) in all respects and held gross for
2) under all conditions, site moisture weather etc.
In RCC item when there is change in grade of concrete mix or change in consumption of cement as per actual mix design then
the difference in consumption of cement shall be deducted from the rate of original item valued at the star rate as mentioned
in tender. However no extra payment shall be made for use of additional Quantity of cement as per actual concrete mix
design. Concrete mix design shall be done in GERI laboratory only.
The Contractor shall exhibits a board as per Govt. circular No. 2DK – 3277 / 1657 N Dt. 26–01-73 with detail of specification
4) and details of work and amount involved at site without any payment as directed by the Engineer in charge.
Testing of materials be as per statement attached with the Specifications, the materials shall be tested in G.E.R.I. Bill for
5) testing shall be paid by the Executive Engineer and 1% of the (one percent) of amount put to tender after shall be recovered
from the running account bills of the works. (As per G.R. (R&B) Dept.., No. TNC/1085/4/C Dtd. 20.12.91.
6) The contractor shall quote even "NIL" if no reduction is proposed.
One precent of estimated cost put to tender for this work shall be recovered from the contract payments as "LABOUR CESS".
7) In terms of the Gujarat Government Gazette Extra ordinary dated 12.12.04. Implementation of building and other
construction workers regulation of equipment and conditions of service Act-1996)
8) Photographs of before work and after work will be submitted by the contractor at the time of each bill submission.
The contractor is solely responsible to bare all applicable taxes. I.e. GST etc. and department will not entertain any contractor
representation to reimburse any financial burden due to applicable taxes : i.e. GST etc.
Signature of contractor Chief Officer
RANAVAV NAGARPALIKA
RANAVAV NAGARPALIKA
RANAVAV, DIST. PORBANDAR
Name of Project : CONSTRUCTION OF BEAUTIFICATION WORK AT NAGARPALIKA GARDEN AND DEVELOPMENT OF GREEN
CITY-1 GVP POINT AT RANAVAV, DIST. PORBANDAR UNDER SWACHCHH SAHER SUNDAR SAHER
Name of Work : PROPOSED BEAUTIFICATION WORK AT NAGARPALIKA GARDEN FOR RANAVAV NAGARPALIKA DIST.
SCHEDULE - "B-1"
Item Quantities Item Description Estimated Rates Unit Total Amount
Item Quantities Item Description Estimated Rates Unit Total Amount
No. Estimated but in Figure in Words according to
may be more estimated
or less quantities.
1 Excavation for foundation up to 1.5 m depth including Rupees One Hundred Twenty
sorting out and stacking of useful materials and disposing Eight and Seventy Nine Paise
off the excavated stuff up to 50 Meter lead. (A) Loose or
2 Providing and laying cement concrete 1:3:6 (1-Cement : 3- Rupees Three Thousand One
Coarse sand : 6-hand broken stone aggregates 20 mm Hundred Eighteen and Seven
nominal size) and curing complete excluding cost of Paise
3 Providing and laying cement concrete 1:2:4 (1-Cement : 2- Rupees Three Thousand
Coarse sand : 4-graded stone aggregates 20 mm nominal Eight Hundred Forty Two and
size) and curing complete excluding cost of formwork in Ninety One Paise
(A) Foundation and Plinth for sculpture Base
Item Quantities Item Description Estimated Rates Unit Total Amount
Item Quantities Item Description Estimated Rates Unit Total Amount
No. Estimated but in Figure in Words according to
may be more estimated
or less quantities.
4 Providing and fixing pre-cast concrete kerb stone of Gray Rupees Four Hundred
cement based concrete block 30cm length, 30cm height Nineteen and Ninety Six
and 15cm thick of M200 grade concrete as per approved Paise
design and including excavation for fixing in proper line
and level, filling the joint with C:M 1:3 (1-cement : 3-fine
500.00 sand) etc complete. 419.96 Rmt
5 Filling in foundation and plinth with black garden soil in Rupees Three Hundred Four
any thickness completed. and One Paisa
6 Providing and TMT bar FE 500/500D reinforcement for Rupees Seventy Seven and
R.C.C. work and including bending, binding & placing in Twenty Nine Paise
position completed up to floor two level.
7 Supply & plantation of shrubs are to be planted as per the Rupees Four Hundred Thirty
detailed planting drawing and specify distance, labour and Seventy Seven Paise
charges, for digging of pit as per detailed specification
filling of organic manure, fertilizer, insecticides etc. and
planting of plant as shown in the drawing, filling the pit,
proper pressing and watering. complete including
maintenance for 3 years with watering, organic manure,
insecticides to be applied time to time wherever required.
also damaged or dry plant which is not grow up, to be
replaced complete. (A) MEHNDI
8 Providing and Fitting Work of Sculpture, Maniyaro on Earth Rupees One Lac Eight
in F.R.P Material. The Sculpture Width, Length, and Height Hundred Ninety Nine Only
are as per the Given Drawing and all Complete on the
Instruction of the Municipal Engineer.
9 Providing and Fitting Work of Sculpture Goval and Gaay Rupees Three Lac Thirty Six
Dohti stree on Earth in F.R.P Material. The Sculpture Thousand Three Hundred
Width, Length, and Height are as per the Given Drawing Thirty Only
and all Complete on the Instruction of the Municipal
Item Quantities Item Description Estimated Rates Unit Total Amount
Item Quantities Item Description Estimated Rates Unit Total Amount
No. Estimated but in Figure in Words according to
may be more estimated
or less quantities.
10 Providing and fixing M.S. grills of required pattern to Rupees One Hundred
wooden frames of windows etc. with M.S. flats at required Fourteen and Forty Four
spacings and frame around, square or round bars with Paise
round headed bolts and nuts or by screws (A) Plain Grill.
RANAVAV NAGARPALIKA
RANAVAV, DIST. PORBANDAR
Name of Project : CONSTRUCTION OF BEAUTIFICATION WORK AT NAGARPALIKA GARDEN AND DEVELOPMENT OF GREEN
CITY-1 GVP POINT AT RANAVAV, DIST. PORBANDAR UNDER SWACHCHH SAHER SUNDAR SAHER
Name of Work : DEVELOPMENT OF GREEN CITY 2 OUTER PLOT AT RANAVAV NAGARPALIKA AREA, DIST. PORBANDAR
SCHEDULE - "B-2"
Item Quantities Item Description Estimated Rates Unit Total Amount
Item Quantities Item Description Estimated Rates Unit Total Amount
No. Estimated but in Figure in Words according to
may be more estimated
or less quantities.
1 Excavation for foundation up to 1.5 m depth including Rupees One Hundred Twenty
sorting out and stacking of useful materials and disposing Eight and Seventy Nine Paise
off the excavated stuff up to 50 Meter lead. (A) Loose or
2 Providing and laying cement concrete 1:3:6 (1-Cement : 3- Rupees Three Thousand One
Coarse sand : 6-hand broken stone aggregates 20 mm Hundred Eighteen and Seven
nominal size) and curing complete excluding cost of Paise
3 Providing and laying cement concrete 1:3:6 (1-Cement : 3- Rupees Four Thousand One
Coarse sand : 6-crushed stone aggregates 20 mm nominal Hundred Ninety Two and
size) and curing complete including cost of formwork in (A) Thirty Three Paise
Wall Caps / Coping
4 Providing and TMT bar FE 500/500D reinforcement for Rupees Seventy Seven and
R.C.C. work and including bending, binding & placing in Twenty Nine Paise
position completed up to floor two level.
Item Quantities Item Description Estimated Rates Unit Total Amount
Item Quantities Item Description Estimated Rates Unit Total Amount
No. Estimated but in Figure in Words according to
may be more estimated
or less quantities.
5 White stone Bela masonry block in course in super Rupees Six Thousand Five
structure with stone of approved quality in Cement mortar Hundred Twenty Four and
1:6 (1cement : 6 course sand) including racking the joints One Paisa
etc. complete up to floor two level.
6 20 mm thick sand faced cement plaster on walls up to Rupees Three Hundred Thirty
height 10 meters above ground level consisting of 12 mm and Seventy Two Paise
thick backing coat of c.m. 1:3 (1:cement - 3:sand) and
mm thick finishing coat of c.m. 1:1 (1:cement - 1:sand)
7 Providing and fixing 1.20 Metre high fencing with 2.0 Metre Rupees Three Hundred
long M.S. Angle posts 40 mm x 40 mm x 6 mm and oil Ninety One and Ninety Three
painting 3 coats fixed at 2.5Mt, C/c. with five Horizontal Paise
lines and two diagonals of galvanised steel barbed wire
weighting 9.38Kg. per 100 Metre, strained and fixed to
posts with G.I. staples including fixing the postsing round
with 0.5M x 0.5.M x 0.5M. block in C.C 1:5:10 etc
45.00 complete. 391.93 Rmt
8 Plam Tree supply & plantation are to be planted as per the Rupees Two Thousand Three
detailed planting drawing & as specified, labour charges, Hundred Seventy Five and
for digging of pit as per detailed specification filling of Fifty Two Paise
organic manure, fertilizer, insecticide etc. and planting of
plant as shown in the drawing, filling the pit, proper
pressing, supporting and watering and maintain for
year after completion of work.
64.00 (1) Bottle Palm 10' height (2) Foxtail Palm 12' height 2375.52 NO
Item Quantities Item Description Estimated Rates Unit Total Amount
Item Quantities Item Description Estimated Rates Unit Total Amount
No. Estimated but in Figure in Words according to
may be more estimated
or less quantities.
9 Tree supply & plantation are to be planted as per the Rupees One Thousand Four
detailed planting drawing & as specified, labour charges, Hundred Eighty Six and
for digging of pit as per detailed specification filling of Seventy Two Paise
organic manure, fertilizer, insecticide etc. and planting of
plant as shown in the drawing, filling the pit, proper
pressing, supporting and watering and maintain for
year after completion of work.
22.00 (1) Champa 6' height (various colour) 1486.72 NO
10 Providing, Supplying and Fixing Bamboo Tree Guards as Rupees Nine Hundred
per detail design. Seventy Eight and Sixty Nine
86.00 978.69 Paise NO
11 White washing with lime on wall surface (two coats) to Rupees Thirteen and Thirty
give an even shade including thoroughly booming the Paise
surface to remove all dirt, dust; mortar drops and other
12 Finishing wall with weather proof exterior emulsion paint Rupees One Hundred Twenty
on wall surface (two coats) to give an required shape even Two and Fourteen Paise
shade after thoroughly brushing the surface to remove all
dirt, and remains of loose powdered materials. Etc
13 Wall artistic 2D-3D paint : The work includes surface
preparation, priming, and the application of theme-based
artistic wall painting on roadside compound walls and other
structures. Surface preparation involves removing loose
particles, dust, grease, and old paint using wire brushes,
sandpaper, and high-pressure water jetting. Any cracks or
uneven surfaces shall be filled with an approved exterior-
grade putty and levelled for a smooth finish. A weather-
resistant, anti-fungal primer shall be applied to enhance
adhesion and durability.
Item Quantities Item Description Estimated Rates Unit Total Amount
Item Quantities Item Description Estimated Rates Unit Total Amount
No. Estimated but in Figure in Words according to
may be more estimated
or less quantities.
The painting shall be executed using high-quality, UV- Rupees One Thousand One
resistant acrylic or emulsion paints suitable for outdoor Hundred Ninety Five and
conditions, ensuring resistance to fading, peeling, and Forty Four Paise
moisture damage. The theme-based 2D design shall be pre-
approved and executed manually by skilled artists using a
combination of brushes, rollers, and spray techniques to
achieve detailed artistic effects. A final protective coat of
clear weatherproof and anti-graffiti varnish shall be applied
to enhance longevity and protect against vandalism and
environmental elements. The work shall be carried out as
per approved designs, ensuring aesthetic appeal and
structural integrity.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
01 SBD.pdf
02 MILE STONE DATES.pdf
03 SCHEDULE-B.pdf
04 QUALIFICATION CRITERIA.pdf
05 DETAILS OF WORK.pdf
06 TECHNICAL SPECIFICATION INDEX.pdf
07 TESTS REQUIRED FOR MATERIALS.pdf
08 ADDITIONAL SPECIFICATIONS.pdf
09 CEMENT CONSUMPTION.pdf
10 VENDOR LIST FOR EQUIPMENTS.pdf
11 DRAWINGS.pdf
A - BUILDING SPECIFICATIONS.pdf
B - ROAD WORK SPECIFICATIONS.pdf
C - PARIPATRAS.pdf
Download all tender documents and submit your bid