Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹4.9 L
EMD Value
₹14,700
Closing Date
25 Nov 2021, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE ENGINEER BARAMULLA
REW BARAMULLA
construction of 3 no. culverts on Naar to onwards road at Dolipora Under B2V Block Wagoora
2021_RDPR_147570_5
211/Xen/Rew/Bla/2021-2022 Dated. 11/11/2021
Open Tender
Civil Works
Item Rate
30 days
BARAMULLA
Please refer Tender documents.
4 documents required · 4 mandatory
₹200
Yes
Executive Engineer REW Baramulla
₹14,700
Yes
26 Nov 2021
11 Nov 2021
26 Nov 2021
11 Nov 2021
25 Nov 2021
11 Nov 2021
120 days
Amount
Earth work in excavation by mech. manual means in trenches for foundations, drains,pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits andthe like not exceeding 10 sqm on plan, including dressing of sides and ramming ofbottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed.
Providing/Laying Stone soling Nallah hand packed on level in foundation trenches incl. Carraige of material for 25 km
Providing and laying in position plain cement concrete 1:4:8 mix ratio M 7.5 using 20 mm nominal size agg excluding cost of shuttering i/c curing( all works upto lintel level)
Providing and laying in position plain cement concrete 1:3:6 mix ratio M 10 using 20 mm nominal size agg excluding cost of shuttering i/c curing
Providing and laying in position plain cement concrete 1:1.5:3 mix ratio M25 using 20 mm nominal size agg excluding cost of shuttering i/c curing( all works upto lintel level)
Centering and shuttering including strutting, propping etc. and removal of form work for: Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs and steps etc.
12 mm thick cement sand plaster in 1:4 mix
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Mild steel and medium tensile steel bars
Structural steel work in built up section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete(railing)
Carraige of sand /bajri by MT of 25 km
Add Provision for signboard & photograph (Pre-Execution, during-Execution and Post-Execution) in concrete with Drawing will be provided by Concerned AEE/AE at the time of Execution.
M/s SHOWKAT AHMAD BHAT
stage.html
html • 0.02 MB
finance_319475.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .