| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 CrAccepted-Finance SHRIPUR BICHWA UDHAM SINGH NAGAR | MAHOBA | UTTAR PRADESH | 210421 | ₹1.9 Cr | L1 | Accepted-Finance ok |
| 2 | L2₹2.0 CrAccepted-Finance BAGESHWAR UTTARAKHAND UT | ₹2.0 Cr | L2 | Accepted-Finance ok |
| 3 | Not Admitted-Fee/PreQual/Technical CANAL ROAD BANBASA CHAMPAWAT | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | Devendra Chand L1 | PAWAN KUMAR DEEPAK KUMAR CONTRACTOR L2 |
|---|---|---|---|---|---|
| 1.00 | Excavation for Clearance of Canal in marshy soil with hydraulic excavator 0.9 Cum bucket capacity including cutting and loading in tippers and disposal with a lift upto 1.5 m and lead upto 1000 m, trimming of bottom and side slopes in accordance with requirements of lines, grades and cross- sections as per Technical Specification Clause 302.3.6. | 2,400 | Per Cum | 51 ₹1.2 L | 52 ₹1.2 L |
| 2.00 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202. By Manual Means Dismantling Brick Work in cement mortar | 1,950 | Per Cum | 380 ₹7.4 L | 381.8 ₹7.4 L |
| 3.00 | Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material Upto 3 m depth | 2,970 | Per Cum | 376 ₹11.2 L | 378.1 ₹11.2 L |
| 4.00 | Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 P.C.C grade M 10 Nominal mix 1:3:6 | 438 | Per Cum | 5,650 ₹24.7 L | 5,659.3 ₹24.8 L |
| 5.00 | Scraping of bricks dismantled from brick work including stacking as per Technical Specification Clause 202. Note -Brick Deduction from reveived from work through dismentelling of old Brick masonary after stacking as per estimated rate Rs.5800 /1000 no. (Note-Brick Deduction from reveived from work through dismentelling of old Brick masonary after stacking as per estimated rate Rs.5800 /1000 no. = 387 x@ Rs.5800 = -2244600 | 198 | /1000 no | 1,650 ₹3.3 L | 1,654.2 ₹3.3 L |
| 6.00 | Brick masonry work in cement mortar in substructure complete excepting pointing and plastering, as per drawing and technical specification Clauses 602, 603, 604, 1202 & 1204 In 1:5 Cement mortar | 2,460 | Per Cum | 5,840 ₹1.4 Cr | 5,852.4 ₹1.4 Cr |
| 7.00 | Pointing with cement mortar (1:3) on brickwork as per drawing and technical specification Clauses 613.3 and 1204 | 4,600 | Per Sqm | 76 ₹3.5 L | 76.3 ₹3.5 L |
Tender Value
₹2.3 Cr
EMD Value
₹4.6 L
Closing Date
15 Apr 2026, 5:00 pmClosed
Superintending Engineer
office of Superintending Engineer, Irrigation Works Circle, Udham Singh Nagar
Work for restoration of lining of left side of main canal no. 01 in block Khatima in Udham Singh Nagar district (Reach- Km 2.200 to 4.500 Km).
2026_IRDCE_93766_1
12/SE/2025-26
Open Tender
Civil Works - Canal
365 days
Khatima
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
Executive Engineer Irrigation Division Sitarganj
₹4.6 L
Rudrapur
12 May 2026
2 Apr 2026
16 Apr 2026
2 Apr 2026
15 Apr 2026
8 Apr 2026
7 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Excavation for Clearance of Canal in marshy soil with hydraulic excavator 0.9 Cum bucket capacity including cutting and loading in tippers and disposal with a lift upto 1.5 m and lead upto 1000 m, trimming of bottom and side slopes in accordance with requirements of lines, grades and cross- sections as per Technical Specification Clause 302.3.6. | - | Per Cum | - | - | itemH1Code1 |
| 2 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202. By Manual Means Dismantling Brick Work in cement mortar | - | Per Cum | - | - | code1.02 |
| 3 | Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material Upto 3 m depth | - | Per Cum | - | - | itemH1Code2 |
| 4 | Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 P.C.C grade M 10 Nominal mix 1:3:6 | - | Per Cum | - | - | itemH1Code3 |
| 5 | Scraping of bricks dismantled from brick work including stacking as per Technical Specification Clause 202. Note -Brick Deduction from reveived from work through dismentelling of old Brick masonary after stacking as per estimated rate Rs.5800 /1000 no. (Note-Brick Deduction from reveived from work through dismentelling of old Brick masonary after stacking as per estimated rate Rs.5800 /1000 no. = 387 x@ Rs.5800 = -2244600 | - | /1000 no | - | - | itemH1Code4 |
| 6 | Brick masonry work in cement mortar in substructure complete excepting pointing and plastering, as per drawing and technical specification Clauses 602, 603, 604, 1202 & 1204 In 1:5 Cement mortar | - | Per Cum | - | - | itemH1Code5 |
| 7 | Pointing with cement mortar (1:3) on brickwork as per drawing and technical specification Clauses 613.3 and 1204 | - | Per Sqm | - | - | itemH2Code1 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.49 MB
BOQ_110977.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid