Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹8.4 LAdmitted-Finance | -16.91% | ₹8.4 L | L1 | Admitted-Finance |
| 2 | L2₹8.9 LAdmitted-Finance | -12.10% | ₹8.9 L | L2 | Admitted-Finance |
| 3 | L3₹9.2 LAdmitted-Finance | -9.99% | ₹9.2 L | L3 | Admitted-Finance |
| 4 | L4₹10.1 LAdmitted-Finance | -1.00% | ₹10.1 L | L4 | Admitted-Finance |
| 5 | Not Admitted-Fee/PreQual/Technical 7313 4 BANS BAZAR AMBALA CITY | AMBALA CITY | AMBALA | HARYANA | - | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹10.2 L
EMD Value
₹20,000
Closing Date
3 Aug 2026, 5:00 pmClosed
Vikas Dhiman
Municipal Corporation Yamunanagar
Construction of Street and drain from Sai Honda agency to ho Parmod Rani in Guru Arjun Nagar ward no 06 MC YNR-Jagadhri (FOR L/C SOCIETY LTD)
2026_HRY_537051_1
20269DF48A74 E32B 4446 8BA3 95E0B7544759288ULB
Open Tender
Civil Works
Works
115 days
Jagadhari
2 documents required · 2 mandatory
₹1,000
₹20,000
Yes
24 Aug 2026
28 Jul 2026
4 Aug 2026
28 Jul 2026
3 Aug 2026
28 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | [10.100.2]Cement Concrete 1:8:16 Flooring 2. Cement Concrete 1:8:16 with stone aggregate 40 mm size in foundation and plinth. [Through Rate] | 88.86 | cum | 1,863 | ₹1,65,546.18 |
| 1.02 | [11.5.3]12 mm cement plaster of mix : 3. 1:4 (1 cement: 4 fine sand) [Through Rate] | 75.96 | Sqm | 113 | ₹8,583.48 |
| 1.03 | [13.29.2]Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 2. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works [Through Rate] | 182.5 | Kg. | 83 | ₹15,147.5 |
| 1.04 | [17.70]Removal of existing IPB by manual means and disposal of dismantled material with all lead and lift as per technical specification clause 202.3. [Through Rate] | 468 | Sqm | 26 | ₹12,168 |
| 1.05 | [20.62.1]Providing, lowering, laying, cutting (cut surface to be uniformly finished), jointing with rubber rings marked with IS : 5382 and testing of SPIGOT AND SOCKETTED RCC, NP2 MARKED WITH IS : 458-1988 and specials into trenches for all depths including carriage, loading, unloading, stacking, handling, re-handling etc. complete is all respects to the satisfaction to the Engineer - in -charge. 1. 200 mm i/d [Through Rate] | 260 | Metre | 285 | ₹74,100 |
| 1.06 | [21.93.1]Providing and fixing SFRC MANHOLE COVERS AND FRAMES MARKED WITH IS: 12592 including setting the same to correct lines and levels in 1:3 cement sand mortar over manhole including carriage loading unloading stacking handling re-handling etc. complete in all respects to the satisfaction to the Engineer-in-charge. 1. Type:- Extra Heavy Duty Set (EHD-35) 560MM Clear Opening [Through Rate] | 4 | Each | 1,155 | ₹4,620 |
| 1.07 | [3.1.1]By Mechanical Transport including loading, unloading and stacking 1. Lime, moorum, building rubbish [5km] | 50.57 | cum | 66 | ₹3,337.62 |
| 1.08 | [3.1.2]By Mechanical Transport including loading, unloading and stacking 2. Earth [5km] | 128 | cum | 83 | ₹10,624 |
| 1.09 | [4.12.1]Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. 1. All kinds of soil [Through Rate] | 128.2 | cum | 78 | ₹9,999.6 |
| 1.1 | [4.16.1.2]Excavating trenches of required width and depth for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m. 1.2. All kind of soil Pipes, cables etc, exceeding 80 mm dia but not exceeding 300 mm dia. [Through Rate] | 260 | Metre | 64 | ₹16,640 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.72 MB
BOQ_616195.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].