Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹9.3 Cr
EMD Value
₹9.3 L
Closing Date
26 Nov 2026, 6:00 pm3d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Engineer, Surat Canal Division, Surat
Improvement of existing canal infrastructure work on Pera Distributary Ex. Umbhrat Branch Canal in the jurisdiction of Mahuva Sub Division.
363147
NIT 04 of 2026-27
Open
Civil - All
Works
Surat
15 documents required · 13 mandatory · 2 optional
₹12,000
Executive Engineer, Surat Canal Division, Surat
₹9.3 L
6 Nov 2026
6 Nov 2026
6 Nov 2026
26 Nov 2026
6 Nov 2026
120 days
BILL OF QUANTITIES
BILL OF QUANTITIES
1. The bill of Quantities shall be read in conjunction with the Instructions to Bidder,
Conditions of Contract, Technical Specifications and Drawings.
2. The quantities given in the Bill of Quantities are estimated and provisional, and
are given to provide a common basis for bidding. The basis of payment will be the
actual quantities of work ordered and carried out, as measured by the Contractor
and verified by the Engineer and valued at the rates and prices tendered in the
priced Bill of Quantities, where applicable, and otherwise at such rates and prices
as the Engineer may fix within the terms of the Contract.
3. The rates and prices tendered in the priced Bill of Quantities shall, except in so
far as it is otherwise provided under the Contract, include all constructional
plant, layout, supervision, materials, erection, maintenance, insurance, profit,
taxes and duties, together with all general risks, liabilities and obligations set out
or implied in the Contract.
4. The rates and prices shall be quoted entirely in Indian Currency.
5. A rate or prices shall be entered against each item in the Bill Quantities, whether
quantities are stated or not. The cost of Items against which Contractor has failed
to enter a rate or price shall be deemed to be covered by other rates and prices
entered in the Bill of Quantities (in case of Item rate contract).
6. The whole cost of complying with the provisions of the Contract shall be included
in the items provided in the priced Bill of Quantities, and where no Items are
provided the cost shall be deemed to be distributed among the rates and prices
entered for the related items of Work.
7. General direction and descriptions of work and materials are not necessarily
repeated or summarized in the Bill of Quantities. References to the relevant
sections of the contract documentation shall be made before entering rates or
prices against each item in the Bill of Quantities.
8. The method of completed work of payment shall be in accordance with the
specification for Road and Bridge works. For building works specifications for
building are to be followed.
9. Errors will be corrected by the Employer for any arithmetic errors pursuant to
Clause 29 of the Instructions to Bidder.
10. Rock is defined as all materials which, in the opinion of the Engineer, required
blasting, or the use of metal wedges and sledgehammers, or the use of
compressed air drilling for its removal, and which cannot be extracted by ripping
with a tractor of at least 150 kw with a single rear mounted heavy duty ripper.
BILL OF QUANTITIES
(A) Percentage Rate Tender (Up to INR 50 Cr.)
Qty. Unit Description of Item Rate Per Amount
Dismentalling the existing Brick Masonary including
103.00 CM. sorting out and stacking the useful materials and 757.40 CM
removing the debries and making good the damage
etc. complete as directed. (b) in cement concrete.
Removing of exiting disturbed C.C. Block lining
71208.50 SM including opening of joints, stacking the same and 29.10 SM
disposing of stuff as directed etc. complete with all
leads and lifts.
15.95 Ha. "Clearing the borrow area including thin jungle 2887.99 Ha.
cutting and removing trees upto 0.5 m girth, bushes,
shrubs etc. complete
Excavation for foundation in all sorts of soil including
yellow, sandy and gravelly soil, soft murrum etc. dry
185.00 CM condition including depositing the excavated stuff in 314.60 CM
uniform layers in banks or as directed etc. complete
for lead up to 1.0 km and all lifts (By machinery) (a)
Above water table
Providing and laying plain/reinforced Design Mix
cement concrete of various grade with cement, sand
and coarse aggregates including centering,
63.00 CM shuttering, batching, mixing, transporting, placing, CM
vibrating, smooth finishing, curing etc. complete for
all lead and lift. (Batching Plant Based, Including
dewatering) 10(B) Raft, Bottom slab of barel, footing
of columns, piers, abutment and bottom slab of
sump etc. ( i ) M-15 grade
"Providing and laying plain/reinforced Design Mix
cement concrete of various grade with cement, sand
and coarse aggregates including centering,
193.00 CM shuttering, batching, mixing, transporting, placing, 4499.60 CM
vibrating, smooth finishing, curing etc. complete for
all lead and lift. (Batching Plant Based, Including
dewatering) (10(c)) Piers, abutment, wingwalls,
headwall, return wall etc. ( ii ) M-15 grade"
Providing and placing in position reinforcement bars
344.00 Qtl including cutting, bending welding, joints where 7194.00 Qtl
necessary, hooking etc. complete as per drawing for
all lead and lifts. (b) TMT
Providing and Laying plain/ reinforced cement
concrete lining pf M-15 grade in bed, side slope and
curveture including batching, mixing, transporting,
placing, smooth finicing, curing including Dewatering
where required (machinary based without paver) (c)
10 cm thick lining in Bed & slope (with Water curing)
Providing and Filling Asphalt of the approved make
95004.00 RM and sand in the expansion and contraction joints in 68.03 RM
the c.c.lining including clearing the joints with air
Earthwork in embankment using soil, soft & hard
95755.80 CM murrum excavated from approved borrow 118.10 CM
area/village tanks etc. including breaking clods,
dressing to the design section with lead up to
kilometer and all lifts.(By poclane machinary)
Compaction of Earthwork in embankment in layers
15 to 20 Cms at requisite moisture content to
95755.80 CM required dry density not less then 85% of 12.40 CM
corresponding proctor maximum dry density
including watering, rolling with suitable type of roller
Providing & fixing in position vertical steel out late
gate including fabrication cutting, welding and two
10.00 Nos coat oil paint and one coat red oxide (prime coat) 4892.10 Nos
greasing ect. complete as per drawing or as directed.
Rate for one gate (size 0.45 x1.00 mt)
Rupees Nine Crore Twenty Nine lacs Ninety Eighty Five Thousand Five Hundred Eighty
Three and Ninety One Paise Only
I/We am/are willing to carry out the work at… ...................... % above/below percent (Should
be written in figures and words) of the estimated rate mentioned above. Amount of my /our
tender works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct………% below Add………% Above
In words In words
Note:-GST as per prevailing rate shall be paid Extra.
(B) For Item Rate Tender (Above to INR 50 Cr. ) :
Item Description of Item (with brief Quantity Unit Rate In Amount
No specification and reference to book of (Without GST)
specifications) Figures In Words
(A) Total Tendered Amount
(B) Rebate on above tendered amount (if any) % (in figure) ………………………………
(C)Net Tendered Amount (A-B) (in figure) ………………………………
1 The Contractor shall exhibit a board with brief details of work as directed by the
Engineer-In-Charge for which no extra payment shall be made.
2 The labour Cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as
per Govt. G.R. NO.: MIS102010/17/K1 Dated:30/07/2018 as stated in S.O.R.
therefore, in R.C.C. items where there is a change as per actual mix design the cost
of difference of cement consumption have been deducted from the rate of original
item at the rate of input rate i.e. Rs 5234/MT mentioned in all the tender.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
SBD-Pera corrected on 28-10-26.pdf
BOQ Pera Distry.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .