Executive Engineer N.P.C. Div No.9, Sanand
Realignment of DOL-1 Sub minor off-taking from kanjari Distributary at ch.1600 m in ONGC area.
304835
Tender Notice No.03/2026-27 (3rd Attempt)
Open
Civil - All
Works
Ahmedabad
11 documents required · 11 mandatory
₹1,062
Executive Engineer, N. P. Canal Division No. 9, Sanand
₹7,350
13 May 2026
13 May 2026
13 May 2026
20 May 2026
13 May 2026
8 Section-7 Bill of Quantities
9 Section-8 Securities and Other Forms
10 Section-9 Drawings
11 Section-10 Documents to be furnished by Bidder
INVITATION FOR BID
NATIONAL COMPETITIVE BIDDING
1. The Executive Engineer N.P. Canal Division No. 9, Sanand invites bids for the
construction of works detailed in the table. The bidders may submit bids for any or all
of the following works.
Approxima Bid Registration
Package Name of Cost of Period of
te value of security(Rs. /Category of
No. work document completion
works (Rs.) ) contractor if
DOL-1 Sub minor
off-taking from
- kanjari 7,34,487.20 7350.00 (900.00 + GST 90 Days “E-2 & Above”
Distributary at 162.00)
2.Prospective / Interested bidder may download the Bid Documents from website
https://tender.nprocure.com free of cost till the Time and Date as mentioned on
online NIT at website https://tender.nprocure.com
(A) The concerned Contractor/bidder shall submit the certificate of registration or
renewal receipt as approved contractor in “ E-2& Above " class in SSNNL /
NWRWS &K Dept / R & B Dept of Gujarat State or equivalent class in
CPWD/Railway /other State Government.
(B) The Contractor registered outside Gujarat shall apply for getting registered
himself in “ E-2& Above" class either with the Sardar Sarovar Narmada Nigam
Limited or with the state of Government of Gujarat before the date of submission
of Tender. The proof of the application for the registration shall have to be
attached with the Tender online.
(C) The Contractor registered in CPWD / Railway and other State Govt. equivalent to
class of Gujarat mentioned above, will be eligible to quote for the Tender with
the condition that concerned Contractor shall get themselves registered in “ E-
2&Above "class in the Sardar Sarovar Narmada Nigam Limited or in the State of
Gujarat on or before the date of acceptance (approval) of his Tender.
Failure of such bidders to get themselves registered in “E-2& Above " class either
with the Sardar Sarovar Narmada Nigam Limited or with the state of
Government of Gujarat before the date of submission of Tender, the bid of such
concerned contractor/bidder shall be rejected, and he shall be considered
nonresponsive/ disqualified.
3. However, Bidder who is submitting the Bid Online will have to pay the Bid
Document Fee/ Tender Fee through Demand Draft only of any Schedule Bank
payable at Sanand and in favour of ‘Executive Engineer, N.P. Canal Division No.
Sanand’. Once the Bid is received online, Bid Document / Tender Fee will not be
The Demand Draft for Bid Document / Tender fee and FDR / Bank Guarantee
against Bid Security / EMD shall be submitted in electronic format through online
(by scanning) while uploading the bid, this submission shall mean that bid
document / tender fee and Bid Security / EMD has been received. Accordingly, the
offer of only those shall be opened whose Bid Document / Tender Fee and Bid
Security / EMD have been received electronically. However, for the purpose of
realization of Demand Draft, and FDR / Bank Guarantee bidder shall send the same
in original through R.P.A.D. /Speed Post/ Courier) only so as to reach to‘Executive
Engineer, N.P. Canal Division No. 9, Sanand within 7 Days from the last day of
bid submission.
Penaltative action for not submitting Demand Draft / FDR / Bank
Guarantee in original to Executive Engineer / Tender Inviting Authority by bidder
shall be initiated.
4. Bids received online, will be opened on the time, date and place as specified in the
online NIT at website https://tender.nprocure.com in the presence of the bidders or
their authorized representatives, who wish to remain present.
If the office happens to be closed on the day of opening of the bids as specified, the
bids will be opened on the next working day at the same time and venue.
5. A pre bid meeting will be held on ………………………………at ………………………..hrs. at
the office of ................................... to clarify the issues and to answer questions on any
matter that ................................. may be raised at that stage as stated in clause 9.2 of
‘instructions to Bidders’ of the bidding documents.
6. Bid Security (EMD) is Rs. 7350.00 equal to 1% of Estimated Amount put to bid /
tender and should be rounded off to the next thousand rupees. (The Validity of
EMD should be 165 days from the date of uploading of BG/FDR documents on
e-tendering website.)
7. Other Information is as under:
A. Agencies can prepare and edit their offers a number of times before the end of
the tender submission date and time. After the tender submission date and
time, the bidder cannot modify / edit / withdraw their submitted offer in any
case. No written or online request in this regard shall be granted.
B. Offers in physical form will not be accepted in any case.
C. Demand Draft purchased by the other then bidder and issued after the last date
of submission of Bids, will not be considered or accepted.
D. The cost incurred by the contractor for this offer for clarification or attending
discussion, conferences or site visits will not be reimbursed by the Employer or
Engineer-in-Charge.
E. Conditional tender shall not be accepted.
F. Any changes, addition, alternation made in the prescribed form attached with
tender are liable to be rejected.
G. Any change in format or conditional Bank Guarantee will not be accepted and
the bidder will be considered non-responsive.
H. All the bidders are instructed to fill in information strictly in accordance with
the format given in the checklist /qualification document / tender document.
I. It is mandatory for the bidders to supply each and every information as asked
strictly in electronic format at appropriate places only.
J. Blank / insufficient information shall be treated as nil information and shall
result in disqualification.
K. Even if the bidder has been qualified in a similar or larger size of project in the
past, it shall not be deemed to be a ground / reason for not giving required
information for this work / bid.
L. Information supplied for earlier projects shall not be considered while
evaluation of this bid. The Government will not ask for any other information,
unless it is found absolutely necessary by the competent authority.
M. If found necessary, the contractor will be intimated for negotiation,
The threshold limit for the pre-qualification criteria shall be adopted as per
SSNNL circular issued vide letter No. CPC/Model Tender/Revision/2011/
648 Pt-IIIA, dtd.21-05-2019 which is as under
-Works of Water Resources department Above Rs.7.5 Crores
-Roads/Bridge/Building work Above Rs.7.0 Crore
-Electrical Work * Above Rs.0.5 Crore
(*) includes any or combination of providing AC plants, lifts, sound systems of
Auditorium refrigeration
For the works costing below Rs.7.5 crore for Water Resources department
Works and above Rs.7.0 crore for Road, Building and Bridge Works documents
mentioned in Section-10 shall be submitted in electronic format only through
online by scanning and also the (i) Bid Document Fee / Tender Fee (ii) Bid
Security / EMD should be sent in original to the Tender opening authority
through RPAD/Speed Post/ Courier) only, so as to reach the Executive Engineer,
N.P. Canal Division No. 9, Sanand, within 7 days from last day of submission of
INSTRUCTIONS TO BIDDERS
Section1:Instructions to Bidders
Page No. Page No.
A. General D. Submission of Bids
1. Scope of Bid 9 19. Sealing & Marking of Bids
2. Source of Funds 9 20. Deadline for Submission of
3. Eligible Bidders 9 21. Late Bids
4. Qualification of the 9 22. Modification and
Bidder Withdrawal of Bids
5. One Bid per Bidder
6. Cost of Bidding 11 E. Bid Opening and Evaluation
7. Site Visit 11 23. Bid Opening
B. Bidding Documents 25. Clarification of Financial
8. Content of Bidding 12 26. Examination of Bids and
Documents Determination of
9. Clarification of Bidding 12 27. Correction of Errors
10. Amendment of Bidding 13 28. Deleted
29. Evaluation and Comparison
Of Financial Bids
C. Preparation of Bids 30. Deleted
11. Language of Bid
12. Documents Comprising 14 F. Award of Contract
13. Bid Prices 15 31. Award Criteria
14. Currencies of Bid and 15 32. Employer’s Right to Accept
Payment any Bid and to Reject any
15. Bid Validity 15 33. Notification of Award and
Signing of Agreement
16. Bid Security 15 34. Performance Security
17. Alternative Proposals By 16 35. Advance Payment
Bidders and Security
18. Format and Signing of Bid 16 36. Dispute Review Expert
37. Corrector Fraudulent
1. Scope of Bid
1.1 The Employer Executive Engineer, N.P. Canal Division No. 9, Sanand invites bids for the
“Realignment of DOL-1 Sub minor off-taking from kanjari Distributary at ch.1600
m in ONGC area.” Detailed in the table given in IFB. The bidders may submit bids for
any or all of the works detailed in the table given in IFB.
1.2 The successful bidder will be expected to complete the works by the intended
completion date specified in the Contract data.
1.3 Throughout these bidding documents, the terms ‘bid’ and ‘tender’ and their derivatives
(bidder/ tenderer, bid / tender, bidding/ tendering, etc.) are synonymous.
2. Source of Funds
2.1 The expenditure on this project will be met from the budget of Govt. of Gujarat / Govt.
of India for centrally sponsored projects.
3. Eligible Bidders
3.1 This Invitation for Bids is open to all eligible bidders.
3.2 All bidders shall provide in Section 2, Forms of Bid and Qualification Information, a
statement that the Bidder is neither associated, nor has been associated, directly or
indirectly, with the consultant or any other entity that has prepared the design,
specifications, and other documents for the Project or being proposed as Project
Manager for the Contract. A firm that has been engaged by the Employer to provide
consulting services for the preparation or supervision of the works, and any of its
affiliates, shall not be eligible to bid.
4. Qualification of the Bidder
4.1 All bidders shall provide in Section 2, Forms of Bid and Qualification Information, a
preliminary description of the proposed work method and schedule, including
drawings and charts, as necessary. The proposed methodology should include a
program of construction backed with equipment planning and deployment duly
supported with broad calculations and quality assurance procedures proposed to be
adopted justifying their capability of execution and completion of work as per
technical specifications, within stipulated period of completion.
4.5 QUALIFICATION CRITERIA:
4.5.4. Personnel Capabilities.
Availability for his work of personnel with adequate experience as required; as per
4.5.5. Equipment Capabilities
Based on the studies carried out by the Engineer, the minimum suggested major
equipment to attain the completion of works in accordance with the prescribed
construction schedule are shown in the Appendix.
The bidders should, however, undertake their own studies and furnish with
their bid, a detailed construction planning and methodology supported with layout and
necessary drawings and calculations to allow the employer to review their proposals.
The numbers, types and capacities of each plant/equipment shall be shown in the
proposals along with the cycle time for each operation for the given production
capacity to match the requirements.
4.5.8. Litigation History
The Applicant should provide accurate information on any litigation or arbitration
resulting from contracts completed or under execution by him over the last five years.
A consistent history of awards against the Applicant or any partner of a joint venture
may result in failure of the applicant.
4.5.9. Disqualification
Even though the applicants meet the above criteria, they are subject to be disqualified
Made misleading or false representation in the forms, statements submitted, and / or
Record of poor performance such as abandoning the work, rescinding of contract for
which the reasons are attributable to the non – performance of the contractor;
consistent history of litigation awarded against the applicant or financial failure due to
bankruptcy. The rescinding of contract of a joint venture on account of reasons other
than non – performance, such as Most Experienced partner of joint venture pulling out,
court directions leading to breaking up of a joint venture before the start of work,
which are not attributable to the poor performance of the contractor will, however, not
affect the qualification of the individual partners.
4.7. Bid Capacity.
Applicants who meet the minimum qualification criteria will be qualified only if their
available bid capacity at the expected time of bidding is more than the total estimated
cost of the works. The available bid capacity will be calculated as under:
Assessed Available Bid Capacity = ( A*N*2-B), where
A = Maximum value of works executed in any one year during the last five years
(updated to the price level of the year indicated in appendix) taking into account the
completed as well as works in Progress. As per the Certificate (regarding Annual
Turnover i.e Total Value of Civil engineering construction works), issued by
Chartered Accountant (in prescribed format as Form-E)
B = Value at current price level of the existing commitments and ongoing works to be
completed during the next 03 Month. ( period of completion of work for which bids
are invited ) as on 30 days prior to the last date of online submission of tender and
N = Number of years prescribed for completion of the works for which the bids are
Note :- In Case of joint venture, the available bid capacity will be applied for each
partner to the extent of his proposed participation in the execution of the
For Value of B in Bid capacity, bidder must submit online a self-certified
copy of statement for existing commitments and ongoing works in
prescribed format.
4.8 Even though the bidders meet the above qualifying criteria, they are subject to be
disqualified if they have:
- Made misleading or false representation in the forms, statements and Attachments
the submitted in proof the qualification requirements; and / or
- Record of poor performance such as abandoning the works, not properly
completing the contract, inordinate delay in completion, litigation history, or
financial failures etc.; and/ or
- Participated in the previous bidding for the same work and had quoted
unreasonably high bid prices and could not furnish rational justification to the
5.One bid per bidder
5.1. Each bidder shall submit only one bid for one package. A bidder who submits or
participates in more than one bid (other than as a subcontractor or in cases of
alternatives that have been permitted or requested) will cause all the proposals with
the bidder’s participation to be disqualified.
6. Cost of Bidding
6.1. The bidder shall bear all costs associated with the preparation and submission of his Bid,
and the Employer will in no case be responsible and liable for those costs.
7.1. The Bidder, at the Bidder’s own responsibility and risk is encouraged to visit and
examine the Site of work and its surrounding and obtain all information that may be
necessary for preparing the Bid and entering into a contract for construction of the
The costs of visiting the site shall be at the Bidder’s own expense.
B.BIDDING DOCUMENTS
8. Content of Bidding Documents
8.1The set of bidding documents comprises the documents listed below and addenda issued
in accordance with Clause 10:
Section Particulars Volume No.
- Invitation for Bids
1 Instructions to Bidders
2 Qualification Information, and other forms
3 Conditions of Contract
4 Contract Data
5 Technical Specifications II
6 Form of Bid III
7 Bill of Quantities
8 Securities and other forms
10 Documents to be furnished by bidder V
8.2. Volumes I, II, III and IV are available online and documents to be furnished by the
bidder in compliance to section 2 will be prepared by him and furnished as Volume- V
in two parts (refer clause 12).
8.3. The bidder is expected to examine carefully all instructions, conditions of contract,
contract data, forms, terms, technical specifications, bill of quantities, forms, Annexes
and drawings in the Bid Document. Failure to comply with the requirements of Bid
Documents shall be at the bidder’s own risk. Pursuant to clause 26 hereof, bids
which are not substantially responsive to the requirements of the Bid Documents shall
9. Clarification Bidding Documents
9.1 A prospective bidder requiring any clarification of the bidding documents may notify
the Employer in writing or through E-mail at the Employer’s address indicated in the
invitation to bid. The Employer will respond to any request for clarification which he
received earlier than 15 days prior to the deadline for submission of bids. Employer’s
response will be published on website including a description of the enquiry but
without identifying its source.
9.2. Pre-bid meeting
9.2.1. The bidder or his official representative is invited to attend a pre-bid meeting which
will take place at the address, venue, time and date as indicated in the appendix.
9.2.2.The purpose of the meeting will be to clarify issues and to answer questions on any
matter that may be raised at that stage.
9.2.3.The bidder shall be required to submit any questions in writing or e-mail to reach the
Employer not later than 03 days before the meeting.
9.2.4 Minutes of the meeting, including the question raised (Without identifying the source of
enquiry) and the responses given will be published without delay on the tender
website i.e. https://tender.nprocure.com.Any modification of the bidding documents
listed in sub-Clause 8.1 which may become necessary as a result of the pre-bid
meeting shall be made by the Employer exclusively through the issue of an Addendum
pursuant to Clause 10 and not through the minutes of the pre-bid meeting.
9.2.5. Non-attendance at the pre-bid meeting will not be a cause for disqualification of a
10. Amendment of Bidding Documents
10.1 Before the deadline for submission of bids, the Employer may modify the bidding
documents by issuing addenda.
10.2. Any addendum thus issued shall be part of the bidding documents. The Employer will
assume no responsibility for the same.
10.3. To give prospective bidders reasonable time in which to take an addendum into
account in preparing their bids, the Employer may, at his discretion, extend as
necessary the deadline for submission of bids, in accordance with Sub-Clause
C.PREPARATION OF BIDS
11. Language of the Bid
11.1 All documents relating to the bid shall be in the English language.
12. Documents Comprising the Bid
12.1. The bid be submitted by the bidder as Volume V of the bid document (refer Clause 8.1)
shall be in two separate parts:
Part I shall be named “Preliminary Stage” and shall comprise
(i) Bid Security in the form specified in Section
(iii) Certificates, undertakings, affidavits as specified in Section-2
(iv) Any other information pursuant to Clause 4.5 of these instructions
(v) Undertaking that the bid shall remain valid for the period specified in Clause
Part II shall be named “Financial Bid” and shall comprise
(i) Form of Bid as specified in Section
(ii) Priced Bill of Quantities for items specified in Section
12.2. The Bidder shall submit the details / information pertaining to each part i.e.
Preliminary as well as financial and must be submitted online only.
12.3. Following documents will be deemed to be part of the bid.
Section Particulars Volume No.
Invitation for Bids (IFB)
1 Instruction to Bidders Volume I
3 Conditions of Contract
4 Contract Data
5 Specifications Volume II
9 Drawings Volume IV
13.1 The Contract shall be for the whole works as described in Sub-Clause 1.1, based on the
priced Bill of Quantities submitted by the Bidder.
13.2 The bidder shall fill in rates and prices and line item total (both in figures and words)
for all items of the Works described in the Bill of Quantities along with total bid price
(Both in figures and words). Items for which no rate or price is entered by the bidder
will not be paid for by the Bill of Quantities.
13.3 All duties, taxes, and other levies except GST payable by the contractor under the
contract, or for any other cause shall be included in the rates, prices and total Bid Price
submitted by the Bidder. (GST will be paid extra)
13.5 The rates and prices quoted by the bidder are subject to adjustment during the
performance of the Contract in accordance with the provisions of Clause 47 of the
Condition of Contract (Irrespective of the time limit and Bid Amount)
14. Currencies of Bid and Payment
14.1 The unit rates and the prices quoted by the bidder shall be entirely in Indian Rupees.
All payments shall be made in Indian Rupees.
15. Bid Validity
15.1 Bids shall remain valid for a period of not less than 120 days after the deadline date
forbid submission specified in Clause
15.2 In exceptional circumstances, prior to expiry of the original time limit, the Employer
may request that the bidders may extend the period of validity for a specified period. A
bidder may refuse the request without forfeiting his bid security. A bidder agreeing to
the request will not be required or permitted to modify his bid, but will be required to
extend the validity of his security for a period of the extension, and in compliance with
Clause 16 in all respects.
16. Bid Security
16.1. The Bidder shall furnish, as part of his Bid, a Bid security in the amount as shown in
column 4 of the table of IFB for this particular work. This Bid security shall be in favor
of Employer as named in Appendix and may be in one of the following forms;
a. Bank Guarantee from any scheduled Indian bank, in the format given in Volume
III. (Bank Guarantee is applicable only for Bid Estimated Amount of
Crore and above) and Bank Guarantee of Schedule and Private Banks shall be
considered as per GoG Finance Department’s Circular No. FD/MSM/e
file/4/2024/2859/D.M.O Date: 01/05/2025 or as per their latest amendment.
b. Fixed Deposit Receipt issued by any Scheduled Indian Bank or a foreign Bank
approved by the Reserve Bank of India.
A Valid Bid Security / EMD Exemption Certificate issued by (1) Road & Building
Department or (2) Narmada Water Resources, Water Supply and Kalpsar
Department of Govt of Gujarat. Exemption Certificate is applicable only
when Registration Certificate of Appropriate Class and Category of
Approved Contractors is required as eligible criteria of bidder.
16.2. Bank guarantees (and other instruments having fixed validity) issued as surety for
the bid shall be valid for 45 days beyond the validity of the bid i.e. total validity of
16.3. Any bid not accompanied by an acceptable Bid Security and not secured as indicated
in Sub-Clauses 16.1 and 16.2 above shall be rejected by the Employer as
16.4. The Bid Security of unsuccessful bidders will be returned within 28 days of the end of
the bid validity period specified in Sub-Clause
16.5 The Bid Security of the successful bidder will be discharged when the bidder has signed
the Agreement and furnished the required Performance Security.
16.6. The bid Security may be forfeited
(a) If the Bidder withdraws the bid after Bid opening during the period of Bid
(b) If the Bidder does not accept the correction of the Bid Price, if any or
(c) In the case of a successful Bidders, if the Bidder fails the specified time limit to
(i)Sign the Agreement; or
(ii) Furnish the requirement Performance Security.
(d) If found necessary, the bidder will be intimated for negotiation, He will be
intimated maximum three times within the validity period for negotiation, If
contractor does not respond in time, his Bid Security (EMD) will be forfeited
and his tender will be rejected. Punitive action will be taken on such
contractors. (As per GoG R&B Dept’s Gr. No. S/22/2017/6369/D,
17. Alternative Proposals by Bidders.
17.1. Bidders shall submit offers that fully comply with the requirements of the bidding
documents, including the conditions of contract (including mobilization advance or
time for completion), basic technical design as indicated in the drawing and
specifications. Conditional offers or alternative offers will not be considered further in
the process of tender evaluation.
18. Format and Signing of Bid
18.1. The Bidder shall prepare documents comprising the bid as described in Clause 12 of
these Instructions to bidder as the “Preliminary Stage“and “Financial Bid” in separate
parts to be uploaded.
D. SUBMISSION OF BIDS
20. Deadline for Submission of the Bids
20.1. Complete Bids must be received online by the Employer at the tender website specified
above not later than the date indicated in appendix.
20.2. The Employer may extend the deadline for submission of bids by issuing an
amendment in accordance with Clause 10, in which case all right and obligation of the
Employer and the bidders previously subject to the original deadline will then be
subject to the new deadline.
22. Modification and Withdrawal of Bids
22.1. Bidders may modify or withdraw their bids online before the deadline
prescribed in Clause 20 or pursuant to Clause
22.3. No bid shall be modified or withdrawn after the deadline for submission of Bid.
22.4. Withdrawal or modification of a bid between the deadline for submission of
bids and the expiration of the original period of bid validity specified in Clause
15.1 above or as extended pursuant to Clause 15.2 may result in the forfeiture
of the Bid security pursuant to Clause
E.BID OPENING AND EVALUATION
23. Bid Opening
23.1 The Employer will open all the Bids received including modifications made pursuant to
Clause 22, in the presence of the Bidders or their representatives who choose to attend
at time, date and the place specified in Appendix in the manner specified in Clauses
and 23.3, In the event of the specified date of Bid opening being declared a holiday for
the Employer, the Bids will be opened at the appointed time and location on the next
23.3. The “Preliminary stage” shall be opened. The amount, form and validity of the bid
security furnished with each bid will be announced. If the bid security furnished does
not conform to the amount and validity period as specified in the invitation for bid (ref.
Column 4 and paragraph 3), and has not been furnished in the form specified in Clause
16, the Financial bid will not be opened.
23.4. (i) Deleted.
23.6 At the time of opening of “Financial Bid”, the names of the bidders were found
responsive in accordance with Clause 23.3 will be announced. The bids of only these
bidders will be opened. The responsive Bidders’ names, the Bid prices, the total
amount of each bid, any discount and such other details as the Employer may consider
appropriate, will be announced by the Employer at the opening.
23.7 At the time of opening of “Financial Bid”, the names of the bidders were found
responsive in accordance with Clause 23.3 will be announced. The bids of only these
bidders will be opened. The responsive Bidders’ names, the Bid prices, the total
amount of each bid, any discount, and such other details as the Employer may
consider appropriate, will be announced by the Employer at the opening.
23.8 In case bids are invited for more than one package, the order for opening of the
“Financial Bid” shall be in order of Estimated amount of Bids from highest to lowest.
23.9 The Employer shall prepare minutes of the Bid opening, including the information
disclosed to those present in accordance with Sub-Clause 23.6.
24.1 Information relating to the examination, clarification, evaluation, and comparison of
Bids and recommendations for the award of a contract shall not be disclosed to
Bidders or any other persons not officially concerned with such process until the
award to the successful Bidder has been announced. Any effort by Bidder to influence
the Employer’s processing of Bids or award decisions may result in the rejection of his
25. Clarification of Financial Bids
25.1. To assist in the examination, evaluation, and comparison of Bids, the Employer may, at
his discretion, ask any Bidder for clarification of his Bid, including breakdowns of unit
rates. The request for clarification and the response shall be in writing or by e- mail,
but no change in the price or substances of the Bid shall be sought, offered, or
permitted except as required to confirm the correction of arithmetic errors discovered
by the Employer in the evaluation of the Bids.
25.2 Subject to sub-clause 25.1, no Bidder shall contact the Employer on any matter relating
to his Bid opening to the contract is awarded. If the Bidder wishes to bring additional
information to the notice of the Employer, it should do so in writing.
25.3. Any effort by the Bidder to influence the Employer in the Employer's bid evaluation, bid
comparison or contract award decision may result in the rejection of the Bidders’ bid.
26. Examinations of Bids and Determination of Responsiveness
26.1 During the detail evaluation of "Preliminary stage", the Employer will determine
whether each Bid (a) meets the eligibility criteria defined in Clause 3 and 4; (b) has
been properly signed; (c) is accompanied by the required securities and; (d) is
substantially responsive to the requirements of the Bidding document. During the
detailed evaluation of the “Financial Bid”, the responsiveness of the bids will be further
determined with respect to the remaining bid conditions, i.e., priced bill of quantities,
technical specifications, and drawings.
26.2 A substantially responsive “Financial Bid” is one which confirms all the terms,
conditions and specifications of bidding documents, without material deviation or
reservation. A material deviation or reservation is one (a) which affects in any
substantial way the scope, quality, or performance of the Works; (b) which limits in
any substantial way, inconsistent with the Bidding documents, the Employer’s rights or
the Bidder’s obligations under the Contract; or (c) whose rectification would affect
unfairly the competitive position of other Bidders presenting substantially responsive
26.3 If a “Financial Bid” is not substantially responsive, it will be rejected by the Employer,
and may not subsequently be made responsive by correction or withdrawal of the non-
conforming deviation or reservation.
29. Evaluation and Comparison of Financial Bids
29.1. The Employer will evaluate and compare only the Bids determined to be substantially
responsive in accordance with Sub-Clause 26.2.
29.3. The Employer reserves the right to accept or reject any variation or deviation. Variation
and deviations and other factors, which are in excess of the requirements of the
Bidding documents or otherwise result in unsolicited benefits for the Employer, shall
not be taken in to account in Bid evaluation.
29.4. The estimated effect of the price adjustment conditions under Clause 47 of the
Conditions of Contact, during the period of implementation of the Contract, will not be
taken in to account in Bid evaluation.
29.5. If the Bid of the successful Bidder is seriously unbalanced in relation to the Engineer’s
estimate of the cost of work to be performed under the contract the Employer may
require the Bidder to produce detailed consistency of those prices with the
construction methods and schedule proposed. After evaluation of the price analyses,
the Employer may require that the amount of the performance security set forth in
Clause 34 be increased at the expense of the successful /bidder to a level sufficient to
protect the Employer against financial loss in the event of default of the successful
Bidder under the Contract.
29.6. A bid which contains several items in the bill of Quantities which are unrealistically
priced low and which cannot be substantiated satisfactorily by the bidder may be
rejected as non-responsive.
F.AWARD OF CONTRACT
31. Award Criteria
31.1. Subject to Clause 32, the Employer will award the contract to the Bidder whose Bid has
been determined.
(i) to be substantially responsive to the Bidding documents and who has offered
the lowest evaluated Bid Price; and
(ii) to be within the available bid capacity adjusted to account for his bid price
which is the lowest evaluation in any of the packages opened earlier than the
one consideration.
In no case, the contract shall be awarded to any bidder whose available bid
capacity is less than the evaluated bid price, even if the said bid is the lowest
evaluated bid. The contract will in such cases be awarded to the next lowest bidder
at his evaluation bid price.
32. Employer’s Right to Accept any Bid and to Reject any or all Bids
32.1. Notwithstanding Clause 31, the Employer reserves the right to accept or reject any Bid,
and to cancel the Bidding process and reject all Bids, at any time prior to the award of
contract, without thereby incurring any liability to the affected bidder or Bidder or any
obligation to inform the affected Bidder or Bidders of the grounds for the Employer’s
33. Notification of Award and Signing of Agreement
33.1. The Bidder whose Bid has been accepted will be notified of the award by the Employer
prior to expiration of the Bid validity period by cable, telex or facsimile confirmed by
registered letter. This letter (hereinafter and in the condition of contract called the
“Letter of Acceptance”) will state the sum that the Employer will pay the Contractor in
consideration of the execution, completion, and maintenance of the Works by the
Contractor as prescribed by the Contract (hereinafter and in the Contract called the
“Contract Price”).
33.2 The notification of award will constitute the formation of the contract, subject only to
the furnishing of a performance security in accordance with the provisions of Clause.
33.3. The Agreement will incorporate all agreements between the Employer and the
successful Bidder. It will be signed by the Employer and to the successful Bidder,
within 28 days following the notification of award along with the Letter of Acceptance.
Within 21 days of receipt, the successful Bidder will sign the Agreement and deliver it
to the Employer.
33.4. Upon the furnishing by the successful Bidder of the Performance Security, the Employer
will promptly notify the other Bidders that their Bids have been unsuccessful.
34. Performance Security
34.1. (A) Within 10 (Ten) days of receipt of Letter of Acceptance, the successful Bidder shall
furnish to the Employer an irrevocable and unconditional guarantee from a Bank
in the form set forth in Section 8 (the “Performance Security”) for an amount equal
to 5% (five percent) of its Contract Price. In case of bids mentioned below, the
successful Bidder, along with the Performance Security,
shall also furnish to the Authority an irrevocable and unconditional guarantee
from a Bank in the same form given at Section 8 towards an Additional
Performance Security (The “Additional Performance Security”) for an amount
calculated as under:
(a) If the Contract Price offered by the Selected Bidder is lower than 10% but
upto 20% of the Estimated Project Cost, then the Additional Performance
Security shall be calculated @ 20% of the difference in the (i) Estimated
Project Cost (as mentioned in Bid Document) - Minus 10% of the Estimated
Project Cost and (ii) Contract Price offered by the selected Bidder.
(b) If the Contract Price offered by the Selected Bidder is lower than 20% of the
Estimated Project Cost, then the Additional Performance Security shall be
calculated @ 30% of the difference in the (i) Estimated Project Cost (as
mentioned in Bid Document) - Minus 10% of the Estimated Project Cost
and (ii) Contract Price offered by the selected Bidder.
(c) This Additional Performance Security shall be treated as part of the
Performance Security.
(B) The Performance Security shall be valid beyond 60(sixty) days of the Defects
Liability Period and the Additional Performance Security shall be valid beyond
28 (twenty-eight) days of Project Completion Date.
34.2. If the performance security is provided by the successful Bidder in the form of a Bank
Guarantee, it shall be issued either (a) at the Bidder’s option, by a
Nationalized/Scheduled Indian bank or (b) by a foreign bank located in India and
acceptable to the Employer. As per GoG Finance Department’s Circular No.
FD/MSM/efile/4/2024/2859/D.M.O Date: 01/05/2025 or as per their latest
34.3. Failure of the successful Bidder to comply with the requirement of Sub-Clause
shall constitute sufficient grounds for cancellation of the award and forfeiture of the
35 Advance Payment and Security
35.1 The Employer will provide an Advance payment on the Contract Price as stipulated in
the Conditions of Contract, subject to maximum amount, as stated in the Contract
37. Corrupt of Fraudulent Practices
37.1 The Employer will reject a proposal if it determines that the Bidder recommended for
award has engaged in corrupt or fraudulent practices in completing for the contract in
question and will declare the firm ineligible, either indefinitely or for a stated period
of time, to be awarded a contract with National Highways Authority of India/ State
PWD and any other agencies, if it at any time determines that the firm has engaged in
corrupt or fraudulent practices in completing for the contractor, or in execution.
37.2 Furthermore, Bidders shall be aware of the provision stated in Sub- Clause 59.2 of the
Conditions of Contract.
APPENDIX TO ITB
Clause Reference
With respect to
1. The Name of the Employer is Executive Engineer, N.P. Canal Division No. 9, Sanand
2. The last five years.
3. Deleted [Cl.4.5.3 (a)]
4. Value of Work is Rs. Rs.
6. The cost of electric work is Rs.
7. The cost of water supply / sanitary works is Nil
8. Deleted [Cl.4.5.6 ]
9. Price level of the financial year 2020-21 to 2024-2025 [Cl. 4.5.2]
10. The pre-bid meeting will take place at …………. [Cl. 9.2.1]
12. Address of the Employer: Executive Engineer, N. P. Canal Dn. No. 9, Sanand, Narmada
Vasahat, Behind Sanand Police station Sanand-382110, Email.:
14. The bid should be submitted latest by [Cl. 20.1 & 20.2]
As stated on online NIT
15. The bid will be opened at …………………………… [Cl. 23.1 ]
As stated on online NIT
16. The Bank Draft in favor of Executive Engineer, N.P. Canal Division No.9, Sanand
18. Escalation factors (for the cost of works [Cl.4.5.2] executed and financial figure to
a common base value) for works completed
Year Financial Year Multiplying factor
Financial Multiplying
Base year of inviting tender
LIST OF KEY PLANT & EQUIPMENT TO BE DEPLOYED ON CONTRACT WORK
[Reference CL. 4.5.5]
The contractors shall also give a list of machineries in his possession and which they
propose to use on the work.
Sr. Plant or Location Age of Make Capacity Approximate Remark
No. Machinery Machinery Value
List of Key Personnel to be deployed on Contract Work
(Reference Cl. 4.5.4)
Employment of a qualified site Engineer by the Contractor.
The Contractor shall employ full-time technically qualified staff during the execution of this
work as under: -
1. Two graduate Civil Engineers and three diploma Civil Engineers when cost of the work
to be executed is more than Rs.50 lakhs.
2. One graduate & two Diploma, Civil Engineers when the cost of the work to be executed is
more than Rs.15 lakhs but less than Rs.50 lakhs.
3. Minimum one Diploma Civil Engineer when the cost of work is less than Rs.15 lakhs but
more than Rs.5 lakhs.
4. Minimum two Diploma Civil Engineers for the work when the cost of work to be
executed is less than Rs. 5 lakhs. The Engineer so employed for the Government work
must have sufficient experience to handle the work independently. Such an Engineer
shall have to stay at the site of work and he shall not be entrusted with other duty except
In case the contractor or partner of the contractor firm is a Civil Graduate Engineer,
Employment of a separate Engineer will not be necessary provided that the Engineer
partner himself attends the execution of the work on the site.
Within 15 days of issue of work-order the Contractor will have to furnish to the Deputy
Executive Engineer-in-charge of the work the Name, Qualifications, copy of marksheet,
Colour Photograph and the appointment order issued such engineers engaged for this
contract work. If 15 days after issue of work order such designated Site Engineers do not
resume or do not remain present on site of work, the recovery at the rate of Rs.15,000-
00 per month per Engineer will be made from the bills/deposit/dues of the contractor.
Such recovery shall be non-refundable.
QUALIFICATION INFORMATION
QUALIFICATION INFORMATION
The information to be filled in by the Bidder in the following pages will be used for the
purpose of post qualification as provided for in Clause 4 of the Instruction to Bidders. This
information will not be incorporated in the Contract.
1.For Individual Bidders
1.1 Constitution or legal status of Bidder
Place of registration
Principal place of business
Power of attorney of signatory of Bid
1.2 Total value of Civil engineering constructions 2020 to
Works performed in the last five years (in Rs.
1.4 Information on Bid Capacity (works for which bids have been submitted and works
which are yet to be completed) as on the date of this bid.
(A) Existing commitments and on-going works:
Description Place & Contract Name & Address Value Contract Stipulated Value of Anticipated
of works State No. of (Rs. Cr) Period of Works* of
Employer Completio remaining completion
*Attach certificate (s) from the Engineer(s) in-charge
** Immediately preceding the financial year in which bids are received.
1.5 Availability of key items of Contractors Equipment for carrying out the works (Ref.
Clause 4.5.5). The Bidder should list all the information requested below.
Item of Requirement Availability Proposals Remarks
Equipment NO Capacity Owned/ Nos/. Age/ (from
Leased to be Capacity Conditions whom to be
procured purchased
1.6 Qualifications and experience of key personnel required for administration and
execution of the contract. Attach biographical data. Refer also to Sub Clause 9.1 of
the Conditions of Contract.
Position Name Qualification Experience
Project Manager
1.7 Proposed sub-contract and firms involved
Sections of the Value of Sub- Experience in
works Contractor similar work
Attach copies of certificates on possession of valid license for executing water
supply/ sanitary work/ building electrification works.
1.10 Name, address, and telephone, telex, and fax numbers of the Bidders bankers who
may provide references if contacted by the Employer.
1.11 Information on Litigation history in which the Bidder is involved.
Other Party (ies) Employer Cause of Dispute Amount Remarks
Involved showing
1.12. Statement of compliance under the requirements of Sub Clause 3.2 of the
instruction to Bidders. (Name of Consultant engaged for project preparations is *
1.13 Proposed work method and schedule. The Bidder should attach descriptions,
drawings and charts as necessary to comply with the requirements of the Bidding
documents. (Refer ITB Clause 4.1)
3. Additional Requirements
3.1 Bidders should provide any additional information required to fulfill the
requirements of Clause 4 of the Instructions to the Bidders, if applicable.
* Fill the name of Consultant
1. I, the undersigned, do hereby certify that all the statements made in the
required attachments are true and correct.
2. The undersigned also hereby certifies that neither our firm M/s.
have not abandoned any work of
Government of Gujarat/Government of India/any Board or Corporation under
Government of Gujarat/Government of India nor any contract awarded to us
for such works have been rescinded, during last five years prior to the date of
3. The undersigned hereby authorize(s) and request (s) any bank, person, firm
or corporation to furnish pertinent information deemed necessary and
requested by the Department to verify this statement or regarding any (our)
competence and general reputation.
4. The Undersigned understands and agrees that further qualifying information
may be requested, and agrees to furnish any such information at the request
of the Department/ Project implementing agency.
(Signed by an Authorized Officer of the Firm)
Title of Officer
SAMPLE FORMAT FOR ANNUAL TURNOVER CERTIFICATE
(REGARDING TOTAL VALUE OF CIVIL ENGINEERING CONSTRUCTION
WORKS PERFORMED IN THE LAST FIVE YEARS)
(CLAUSE 4.5.3 (a) OF ITB & Clause 1.2 of Q.1)
This is to certify that we have verified Books of Account of M/s.
as Civil Construction Firm and achieved the following Gross Annual Turnover from Construction
Activity for Last five financial years is as under:
Civil Engineering
Other Business Add GST Turnover
Sr.No. Financial Year Construction works
Turnover (in Rs) Value (in Rs) including GST
Turnover (in Rs)
We have verified the above facts and figures from the Audited Books of the Firm or the Audited
Balance sheet and other relevant authentic records of the firm, for the last five financial years
and certify the same as True.
(Signature & stamp of the Chartered Accountant)
In above Form, the details given in above form is given in any other format but containing a, b &
c in same wording then the format shall be considered for evaluation.
If any tender is to be opened between 1st April and 30th September, then their provisional
certificate of previous financial year shall be considered for evaluation.
CONDITIONS OF CONTRACT
Conditions of Contract
Table of Contents
A General Page D. Cost Control
1 Definitions 34 37 Bill of Quantities
2 Interpretation 35 38 Changes in the Quantities
3 Language and Law 36 39 Variations
4 Engineer’s Decisions 36 40 Payments for Variations
5 Delegations 36 41 Cash Flow Forecasts
6 Communications 36 42 Payment Certificates
7 Sub-Contractors 36 43 Payments
8 Other Contractors 37 44 Compensations Events
9 Personnel 37 45 Tax
10 Employer’s & Contractor Risk 37 46 Currencies
11 Employers Risks 37 47 Price Adjustment
12 Contractor’s Risk 37 48 Retention
13 Insurance 38 49 Liquidated damages
14 Site Investigations Reports 38 50 Bonus
15 Queries about the Contract 38 51 Advance Payment
16 Contractors to Construct the 38 52 Securities
17 The Works to be Completed By 38 53 Deleted
The Intended Completion Date
18 Approval by the Engineer 39 54 Cost of Repair
20 Discoveries 39 E. Finishing the Contract
21 Possession of the Site 39 55 Completion
22 Access to the Site 39 56 Taking Over
23 Instructions 39 57 Final Account
24 Disputes 40 58 Operating and Maintenance
25 Procedure for Disputes
26 Deleted 40 59 Terminations
60 Payment upon Terminations
B. Time Control 61 Property
27 Programme 41 62 Release from Performance
28 Extensions of the Intended
completion date
29 Deleted 41 F. Special Conditions of
30 Delays Ordered by The 42 63 Labour
Engineer 64 Compliance with labour
31 Management Meetings 42 65 Arbitration
32 Early Warning
C. Quality Control
33 Identifying Defects
35 Correction of Defects
36 Uncorrected Defects
CONDITIONS OF CONTRACT
1.1 Terms which are defined in the Contract Data are not also defined in the Conditions
of Contract but keep their defined meaning.
Bill of Quantities means the priced and completed Bill of Quantities
forming part of the Bid
Compensation Events are those defined in Clause 44 hereunder
The Completion Date is the date of completion of the Works as certified
by the Engineer in accordance with Sub Clause
The Contract is the contract between the Employer and Contractor to
execute, complete and maintain the Works till the completion of Defects
Liability Period. It consists of the documents listed in Clause 2.3 below.
The Contract data defines the documents and other information which
comprise the Contract.
The Contractor is a person or corporate body whose Bid to carry out the
Work has been accepted by the Employer.
The Contractor’s Bid is the completed Bidding document submitted by
the Contractor to the Employer and includes Technical and Financial Bids.
The Contract Price is the price stated in the Letter of Acceptance and
thereafter as adjusted in accordance with the provisions of the Contract.
Days are calendar days: months are calendar months.
The Defects Liability Period is the period named in the Contract Data
and calculated from the Completion Date.
The Employer is the party who will employ the Contractor to carry out
The Engineer is the person named in the Contract Data (or any other
competent person appointed and notified to the contractor to act in
replacement of the Engineer) who is responsible for supervising the Contractor,
administering the Contract, certifying payments due to the Contractor, issuing
and valuing Variations to the Contract, awarding extensions of time, and valuing
the Compensations Events.
While dealing with the financial approval and items like extra items, quantity
variations and other such proposals involving the finance where the terms
should mean the Competent Authority under the organization having
competency to deal with and approve such cases.
Equipment is Contractor’s machinery and vehicles brought temporarily to
the site to construct the Works.
The Initial Contract Price is the Contract Price listed in the Employer’s
Letter of Acceptance.
The Intended Completion Date is the date on which it is intended that
the Contractor shall complete the Works. The Intended Completion Date is
specified in the Contract Data. The Intended Completion Date may be revised only
by the Engineer by issuing an extension of time.
Materials are all supplies, including consumables, used by the contractor
for incorporation in the works.
Plant is any integral part of the work which is to have mechanical,
electrical, electronic or chemical or biological functions.
The Site is the area defined as such in the Contract Data.
Site Investigation Reports are those which were included in the Bidding
documents and are factual interpretive reports about the surface and subsurface
conditions at the site.
Specifications means the Specifications of the works included in the
Contract and any modification or addition made or approved by the Engineer.
The Start Date is given in the Contract Data. It is the date when the
Contractor shall commence execution of the works. It does not necessarily
coincide with any of the Site Possession Dates.
A Subcontractor is a person or corporate body who has a Contract with
the Contractor to carry out a part of the work in the Contract which includes
work on the Site.
Temporary Works are works designed, constructed, installed, and
removed by the Contractor which are needed for construction or installation of
A Variation is an instruction given by the Engineer, which varies the
The Works are what the Contract requires the Contractor to construct,
install, and turn over to the Employer, as defined in the Contract Data.
2. Interpretation
2.1 In interpreting these Conditions of Contract, singular also means plural,
male also means female or neuter and the other way around. Heading have
no significance. Words have their normal meaning under the language of
the Contract unless specifically defined. The Engineer will provide
instructions clarifying queries about Conditions of Contract.
2.2 If sectional completion is specified in the Contract Data, references in the
Conditions of Contract to the Works, the Completion date, and Intended
Completion Date apply to any Section of the Works (other than references
to the Completion Date and Intended Completion date for the whole
2.3 The documents forming the Contract shall be interpreted in the following
order of priority
(2) Letter of Acceptance, notice to proceed with works (3)
Contractor’s Bid
(4) Contract Data
(5) Conditions of Contract including Conditions of Contract
(6) Specifications
(8) Bills of quantities and
(9) Any other document listed in the Contract Data as forming part of
3. Language and Law
3.1 The language of the Contract and the law governing the Contract are stated
in the Contract Data.
4. Engineers Decisions
4.1 Except where otherwise specifically stated, the Engineer will decide
contractual matters between the Employer and the Contractor in the role
representing the Employer. The Engineer shall obtain approval of
Competent Authority if needed as per Delegation of Powers of SSNNL.
5.1 The Engineer may delegate any of his duties and responsibilities to other
people after notifying the Contractor and may cancel any delegation after
notifying the Contractor.
6.0 Communications
6.1 Communications between parties which are referred to in the conditions
are effective only when in writing. A notice shall be effective only when it
is delivered (in terms of Indian Contract Act).
7.0 Sub-Contracting
7.1 The Contractor may subcontract any portion of work, up to a limit specified
in contract data, with the approval of the engineer but may not assign the
Contract without the approval of the Employer in writing. Subcontracting
shall not alter the Contractor’s obligations. Sub-contracting of supply or
specific items of work is not allowed.
7.2 The sub-contractor must be registered in appropriate class and category for
the part of work to be subcontracted.
8.0 Other Contractors
8.1 The Contractor shall cooperate and share the Site with other contractors,
public authorities, utilities and the Employer between the dates given in
the Schedule of other Contractor. The Contractors shall as refer to in the
Contract Data, also provide facilities and services for them as described in
the Schedule. The employer may modify the schedule of other contractors
and shall notify the contractor of any such modifications.
9.1 The Contractor shall employ the key personnel named in the Schedule of
Key Personnel as referred to in the Contract Data to carry out the
functions stated in the Schedule or other personnel approved by the
Engineer. The Engineer will approve any proposed replacement of key
personnel only if their qualifications, abilities, and relevant experience are
substantially equal to or better than those of the personnel listed in the
9.2 If the engineer asks the Contractor to remove a person who is a member of
the Contractor Staff or his work force stating the reasons the Contractor
shall ensure that the person leaves the Site within seven days and has no
further connection with the work in the Contract.
10.0 Employer’s and Contractors Risks
10.1 The Employer carries the risk which these Contract states are Employer’s
risks, and the Contractor carries the risks which these Contracts states are
Contractors risk.
11.0 Employer’s Risks
11.1 The employer is responsible for the excepted risks which are (a) in so far
as they directly affect the execution of the Works, the risks of war,
hostilities, invasion, act of foreign enemies, rebellion, revolution,
insurrection or military or usurped power, civil war, riot commotion or
disorder (unless restricted to the Contractor’s employees), and
contamination from any nuclear fuel or nuclear waste or radioactive toxic
12.0 Contractor’s Risks
12.1 All risks of loss of or damages to physical property and of personal injury
and death which arise during and in consequence of the performance of
the Contract other than the excepted risks are the responsibility of the
13.1 The Contractor shall provide, in the joint names of the Employer and the
Contractor, insurance cover from the Start date to the end of the Defects
Liability Period, in the amounts and deductibles stated in the Contract data
for the following events which are due to the Contractor’s risks:
(a) Loss of or damage to the works, Plant and materials,
(b) Loss of or damage to Equipment
(c) Loss of or damages of property (expect the Works, Plant, Materials and
Equipment) in connection with the Contract; and
(d)Personal injury or death.
13.2 Policies and certificates for insurance shall be delivered by the Contractor
to the Engineer for the Engineer’s approval before the Start Date. All such
insurance shall provide for compensation to be payable in the types and
proportions of currencies required to rectify the loss or damage incurred.
13.3 If the Contractor does not provide any of the policies and certificates
required, the Employer may affect the insurance which the Contractor
should have provided and recover the premiums the Employer has paid
from payments otherwise due to the Contractor or, if no payment is due,
the payment of the premiums shall be a debt due.
13.4 Alterations to the terms of an insurance shall not be made without the
approval of the Engineer.
13.5 Both parties shall comply with any conditions of the insurance policies.
14.0 Site Investigation Report
14.1 The Contractor in preparing the Bid shall rely on any site Investigation
reports referred to in the Contract Data, supplemented by any information
available to the Bidder.
15.0 Queries about the Contract data
15.1 The engineer will clarify queries on the Contract Data
16.0 Contractor to Construct the Works
16.1 The Contractor shall construct and install the works in accordance with the
specification and Drawings.
17.0 The Works to be completed by the Intended Completion Date
17.1 The Contractor may commence execution of the Works on the Start Date
and shall carry out the Works in accordance with the programme
submitted by the Contractor, as updated with the approval of the
Engineer, and complete them by the Intended Completion date
18.0 Approval by the Engineer
18.1 The Contractor shall submit Specifications and Drawings showing the
proposed Temporary works to the Engineer, who is to approve them if
they comply with the Specifications and drawings.
18.2 The Contractor shall be responsible for design of temporary works.
18.3 The Engineer’s approval shall not alter the contractor responsibility for
design of the Temporary works.
18.4 The Contractor shall obtain approval of third parties to the design of the
Temporary works where required.
18.5 All Drawings prepared by the Contractors for the execution of the
temporary or permanent work are subject to prior approval by the
Engineer before their use.
19.1 The Contractor shall be responsible for the safety of all activities on the Site.
20.0 Discoveries
20.1 Anything of historical or other interest or of significant value unexpectedly
discovered on the site is the property of the Employer. The contractor is to
notify the engineer of such discoveries and carry out the Engineer’s
instructions for dealing with them.
21.0 Possession of the Site
21.1 The Employer shall give possession of all parts of the site to the Contractor.
If possession of a part is not given by the date stated in the Contract Data
the Employer is deemed to have delayed the start of the relevant activities
and this will be a Compensation Event.
21.2 If within 25% of the time limit of the project, 80% of possession of the site
is not handed over to the Contractor, then contractor/ Employer may fore-
close the contract. Contractor/Employer has to foreclose the work within
30 days after lapse of 25%-time limit and after 30 days foreclosure option
will be closed.
22.0 Access to the Site
22.1 The Contractor shall allow the Engineer and any person authorized by the
Engineer access to the Site, to any place where work in connection with
the Contract is being carried out or is intended to be carried out and to any
place where materials or plants are being manufactured/ fabricated/
assembled for the works.
23.0 Instructions
23.1 The Contractor shall carry out all instructions of the Engineer pertaining to
works which comply with the applicable laws where the site is located.
23.2 The Contractor shall permit the Employer to inspect the Contractor’s
accounts and records relating to the performance of the Contractor and to
have them audited by auditors appointed by the Employer, if so required
by the Employer.
24.1 If the Contractor is of the view that a decision taken by the Engineer was
either outside the authority given to the Engineer by the Contract or that
the decision was wrongly taken, the decision shall be referred to
Competent Authority of SSNNL within 14 days of the notification of the
Engineer's decision. If the issue is not resolved, any party can refer the
matter for conciliation within 15 days from the decision given by such
Competent Authority.
(a) For the work up to Rs.100 Cr., if any of the parties is not satisfied
with the decision of the Competent Authority, both the parties have
to refer to the Director(CAD/CIVIL/CANAL), SSNNL concern for the
conciliation process.
(b) For the work more than Rs.100 Cr., if any of the parties is not
satisfied with the decision of the Competent Authority, both the
parties have to refer to the MD,SSNNL for the conciliation process.
If the dispute is not resolved through the conciliation process, he may
refer the dispute to Gujarat Public Works Contract Dispute Arbitration
Tribunal. If the Contractor fails to refer a claim / dispute to the Higher
Authority within 14 days of the notification of the Engineer's decision, the
Contractor shall not be entitled to any additional payment/claim if he
doesn’t follow the above sequence in stipulated time and he should not
25.0 Procedure for Disputers
25.1 The arbitration shall be conducted in accordance with the arbitration
procedure stated in the Special Conditions of Contract.
B. TIME CONTROL
27.1 Within the time stated in the Contract Data the Contractor shall submit to
the Engineer for approval a Programme showing the general methods,
arrangements orders, and timing for all the activities in the works along
with monthly cash flow forecast.
27.2 An update of the Programme shall be a programme showing the actual
progress achieved on each activity and the effect of the progress achieved
on the timing of the remaining work including any changes to the
sequence of the activities.
27.3 The Contractor shall submit to the Engineer, for approval an updated
programme at intervals no longer than the period stated in the Contract
data. If the Contractor does not submit an updated programme within this
period, the Engineer may withhold the amount stated in the Contract data
from the next payment after the date on which the overdue programme
has been submitted.
27.4 The Engineer’s approval of the programme shall not alter the Contractor’s
obligations. The Contractor may revise the programme and submit it to
the Engineer again at any time. A revised programme is to show the effect
of Variations and Compensations events.
28.0 Extension of the Intended Completion Date
28.1 The Engineer shall extend the Intended Completion Date if a compensation
Event occurs or a Variation is issued which makes it impossible for
completion to be achieved by the Intended Completion Date without the
Contractor taking steps to accelerate the remaining work and which would
cause the Contractor to incur additional cost.
28.2 The Engineer shall decide whether and by how much to extend the
Intended Completion Date within 35 days of the Contractor asking the
Engineer for a decision upon the effect of a compensation event or
Variation and submitting full supporting information. If the Contractor has
failed to give early warning of a delay or has failed to cooperate in dealing
with a delay, the delay by this failure shall not be considered in assessing
the new Intended Completion Date.
28.3 The Engineer shall within 14 days of receiving full justification from the
contractor for extension of Intended Completion Date refer to the
Employer his decision. The employer shall in not more than 21 days
communicate to the engineer the acceptance or otherwise of the
Engineer’s decision. If the employer fails to give his acceptance, the
Engineer shall not grant the extension and the contractor may refer the
matter under Clause
30.0 Delays Ordered by the Engineer
30.1 The Engineer may instruct the Contractor to delay the start or progress of
any activity within the works.
31.0 Management Meetings
31.1 Either the Engineer or the Contractor may require the other to attend a
management meeting. The business of a management meeting shall be to
review the plans for remaining work and to deal with matters raised in
accordance with the early warning procedure.
31.2 The Engineer shall record the business of management meetings and is to
provide copies of his record to those attending the meeting and to the
Employer. The responsibility of the parties for actions to be taken is to be
decided by the Engineer either at the management meeting or after the
management meeting and stated in writing to all who attended the
32.0 Early Warning
32.1 The Contractor is to warn the Engineer at the earliest opportunity of
specific likely future events or circumstances that may adversely affect the
quality of the work, increase the Contract price or delay the execution of
works. The Engineer may require the contractor to provide an estimate of
the expected effect of the future event or circumstance on the contract
price and completion date. The estimate is to be provided by the
Contractor as soon as reasonably possible.
32.2 The Contractor shall cooperate with the Engineer in making and
considering proposals for how the effect of such an event or circumstance
can be avoided or reduced by anyone involved in the work and in carrying
out any resulting instruction of the Engineer.
C.QUALITY CONTROL
# 33. Identifying Defects/ Defect liability period
33.1: Defect liability period :
The contractor shall be responsible to make good and remedy at his own
expense any defect which may develop or may be noticed before the
period mentioned hereunder from the certified date of completion. The
Engineer in charge shall give the contractor a notice in writing about the
defects and the contractor shall make good the same within 15 days of
receipt of the notice. In the case of failure on the part of the contractor, the
Engineer- in-charge may rectify or remove or re-execute the work at the
risk & cost of the contractor. The Engineer-in-charge shall be entitled to
appropriate the whole or any part of the amount of security deposit
towards the expenses, if any, Incurred by him in rectification, removal or
re-execution. The Defects Liability period shall be as under….
(a) For all works costing up to Rs. 50,000 (amount put to tender), the period
shall be 3 Months from the certified date of completion.
(b) For all works costing more than Rs. 50,000 and up to Rs. 1 crore (amount
put tender), the period shall be 12 (Twelve) months from the certified date
of completion or one monsoon, whichever is later.
(c) For major projects costing more than Rs. 1 crore, the period shall be
Months from the certified date of completion which should include three
(d) For original building works the defect liability period will be 4 years or
elapse of 4 monsoon period following date of possession of building taken
over by user agency following the certified date of completion, whichever
For the purpose of deciding the monsoon period, the 30th September shall
be treated as the last date.
Modified vide R & B D Circular No. PAC-11-102008-2076-N dated
PRCH/102013(2976) 2759-N, Dated 27/05/2013 and Circular No.TNC/
10/ 2016/ Clause 17A (Correction/(1)C Dated 12/05/2016]
33.2 Free maintenance guarantee period for works
of Road/Bridge construction
(a) For resurfacing work of road free maintenance guarantee period one year
from the date of completion.
(b) In case of widening of the road/strengthening of the road/bridge, the
contractor shall have to give four years free maintenance guarantee from
the certified date of completion. During this period the contractor shall
visit the site every three months along with the concerned Section Officer
/ Deputy Executive Engineer and will examine the work already carried
out in this contract like road work, jungle cutting, side shoulders, side
gutter, road furniture, patta etc. and will prepare Km. wise inspection
report duly signed by all concerned and any defect observed shall be done
within 15 days by the contractor at his risk and cost as per the direction of
Engineer in charge. The contractor needs to do videography of these visits
and require to submit at the time of release of FMG. If the B.T. surface
during the maintenance period of 4 years is worn out then agency shall
have to provide renewal coating as per tender item as directed by the
Engineer-in- charge. The amount equivalent to 5% of each running bill
shall be withheld and will be released after the free maintenance
guarantee period (i.e. 4 years) is over.
However, this amount shall be released against fixed deposit or bank
guarantee pledged in the name of Executive Engineer after completion
certificate of work is issued.
32.2.1The flakiness and elongation index (combined) for coarse aggregates under
no circumstances shall exceed the allowable limit set forth in the relevant
clause for the material in question.
32.2.22% of the amount eligible for the payment of bituminous items shall be
withheld till the miscellaneous items like earthwork in embankment /
cutting for side shoulders, side gutters, kilometer / indicator / guard
stones, sign boards etc. are completed in all respect by the contractor.
After completion of the miscellaneous items, the above said 2% withheld
amount shall be released.
32.2.3Videography for the surface under Maintenance Guarantee is to be done as
per Govt. letter No.: SSR/10/2015-16/26/C, Dtd. 26/11/15 for the work
costing more than Rs. 5.00Crore.
32.2.4Setting up of adequate laboratory & deployment of quality engineers.
The contractor shall have to set up the laboratory with adequate
equipment. Till the setting up of adequate laboratory is completed &
reported of this to the engineer (subject to due verification by engineer’s
representative) by contractor in writing, Rs.2,00,000/- shall be withheld.
The qualified quality Engineer shall be deployed exclusively for this
contract by the contractors. If quality Engineer is not deployed by
contractor within one month after the date of work order, the amount
equivalent to Rs.20,000 per month shall be recovered till the actual
deployment of quality engineer. The amount so recovered towards the
deployment of quality engineers shall not be refunded.
32.2.5Asphalt work will have to be cross checked as per G.R. No.:
RGN/60/2006/35/C, dtd.31/05/07 before final bill is paid.
32.2.6Maintenance during Construction Period
During the Construction Period, the Contractor shall maintain, at his own
risk and cost, the existing lane(s) of the road so that the traffic worthiness
and safety thereof are at no time materially inferior as compared to their
condition 10 (ten) days prior to the date of the Agreement, and shall
undertake the necessary repair and maintenance works for this purpose;
provided that the Contractor may, at his cost, interrupt and divert the flow
of traffic if such interruption and diversion is necessary for the efficient
progress of works and conforms to Good Industry Practice; provided
further that such interruption and diversion shall be undertaken by the
Contractor only with the prior written approval of the Executive Engineer
which approval shall not be unreasonably withheld. For the avoidance of
doubt, it is agreed that the Contractor shall at all times be responsible for
ensuring safe operation of the road.
33.3 The Engineer shall check the Contractor’s work and notify the Contractor of
any defects that are found. Such checking shall not affect the Contractor’s
responsibilities the Engineer may instruct the Contractor to search for a
Defect and to uncover and test any work that the Engineer considers may
33.4 Free maintenance guarantee period for works of construction of
Canals (including UGPL). Canal Structures, Canal Roads. Hydro
Electrical & Mechanical works, Solar, Building works and
Maintenance & Operations.
(a) For the work of Canals(including UGPL), Canal Structures, Canal
Roads, Hydro Electrical & Mechanical works, Solar, Building works
and Maintenance & Operations free maintenance guarantee period
one year from the date of completion
(b) During this period the contractor shall visit the site every three
months along with the concerned Section Officer/ Deputy Executive
Engineer and will examine the work already carried out in this
contract and attend all defects such as filling rain cuts in banks.
Jungle cutting, side gutter and all other defects in all structures and
its components etc. and will prepare reach wise inspection report
duly signed by all concerned and any defect observed shall be done
within 15 days by the contractor at his risk and cost as per the
direction of Engineer in charge. The contractor needs to do
videography of these visits and require to submit at the time of
release of Performance Bond/Performance Security related to Free
Maintenance Guarantee. The amount equivalent to 5% of each
running bill shall be withheld and will be released after the free
maintenance guarantee period (i.e. 4 years) is over.
However, this amount shall be released against fixed deposit or bank
guarantee pledged in the name of Executive Engineer after
completion certificate of work is issued,
(1) The materials used for the works during construction shalt be as per
Indian standards/Technical Specifications of the respective item and
all the test as per respective Indian Standards/ Technical
Specifications of the respective item shall be conducted and ensured
that the test results shall be meet the criteria specified in the relevant
clause/specifications for the maternal in question.
(2) 2% of the amount shall be withheld till the miscellaneous items like
WBM road, testing of canals, side gutters, km stones, canal data
board, marble data plates, gauge plates, gate work etc. and in case of
UGPL, works, trial run, other ancillary work viz, strainer, ladder,
pump, well-cover, performance test trial run of Hydro Mechanical
and Electrical works etc. are completed in all respect by the
contractor. After completion of the miscellaneous items, the above
said 2% withheld amount shall be released.
(3) Videography for the works under Maintenance Guarantee is to be
done as per Govt. letter No.: SSR/10/2015-16/26/C, Dtd 26/11/15 for
the work costing more than estimated cost of Rs. 5.00 Crore
(4) Setting up of adequate laboratory & deployment of quality engineers.
The contractor shall have to set up the laboratory with adequate
equipment. Till the setting up of adequate laboratory is completed &
reported of this to the engineer (subject to due verification by
engineer's representative) by contractor in writing Rs 2,00,000/- shall
be withheld. The qualified quality Engineer shall be deployed
exclusively for this contract by the contractors. If quality Engineer is
not deployed by contractor within one month after the date of work
order, the amount equivalent to Rs 20,000 per month shall be
recovered till the actual deployment of quality engineer. The amount
so recovered towards the deployment of quality engineers shall not be
(5) For finalizing the work, the work carried-out shall be randomly
checked by core test for the canal lining works and density tests for
embankment works will have performed randomly as per SSNNL G.R.
No. મુ.ઇ./ગુિન/ નમદા/ ગુ.િન. / પીબી-૨/ ૬૮/ ૨૦૧૧તા. ૦૨/૦૬/૨૦૧૧before final
(6)Maintenance during Construction Period
During the Construction Period, the Contractor shall maintain; at his
own risk and cost; works for safety are at no time materially inferior
as compared to their condition 10 (ten) days prior to the date of the
Agreement, and shall undertake the necessary repair and
maintenance works for this purpose, provided that the Contractor
may at his cost is necessary for the efficient progress of works and
conforms to Good Industry Practice; provided further that such
interruption and diversion shall be undertaken by the Contractor
only with the prior written approval of the Executive Engineer which
approval shall not be unreasonably withheld. For the avoidance of
doubt, it is agreed that the Contractor shall at all times be
responsible for ensuring safe operation of the work.
34.1 If the engineer instructs the Contractor to carry out a test not specified in
the Specification to check whether any work has a Defect and the test
shows that it does, the Contractor shall pay for the test and any samples. If
there is no defect the test shall be a Compensation Event.
34.2 For Confirmatory tests of the testing done by the agencies 1% of the
amount of work done should be deducted from R.A. Bill of the contractor
for testing the quality of material workmanship, irrespective of actual
34.3 Agency has to establish testing laboratory on site for the various test to be
carried out in the work for this purpose agency shall construct a pukka
laboratory building with all facility on site at location specified by the
engineer in charge.
35. Correction of defects
35.1The engineer shall give notice to the Contractor of any defects before the end
of the defects Liability Period, which begins at Completion and is defined
in the contract data. The Defects Liability Period shall be extended for as
long as Defects remain to be corrected.
35.2Every time notice of a Defect is given, the Contractor shall correct the notified
defect within the length of time specified by the Engineer’s notice.
36. Uncorrected Defects
36.1If the Contractor has not corrected a defect within the time specified in the
Engineer’s notice, the Engineer will assess the cost of having the Defect
corrected, and the Contractor will pay this amount.
D. COST CONTROL
37. Bill of Quantities
37.1 The bill of Quantities shall contain items for the constructions, installation,
testing and commissioning work to be done by the Contractor.
37.2 The bill of Quantities is used to calculate the Contract price. The Contractor
is paid for the quantity of the work done at the rate in the Bill of Quantities
38. Change in the Quantities
38.1 The Engineer shall have power to make any alterations in or addition to the
original specifications , drawings, designs and instructions that may
appear to him to be necessary or advisable during the progress of the
work and the contractor shall be bound to carry out the work in
accordance with any instruction in this connection which may be given to
him in writing signed by the Engineer and such alteration shall not
invalidate the contract and any additional work which the contractor may
be directed to do in the manner above specified as part of the work shall
be carried out by the contractor on the same conditions in all respects on
which he agreed to do the main work and at the same rate as are specified
in the tender for the main work.
Except that when the quantity of any item exceeds the quantity as in the
tender by more than 130%, the contractor will be paid for the quantity in
excess of 130%, at the rate entered in the SOR of the year during which the
excess in quantity is first executed.
39.1 All Variations shall be included in updated programmes produced by the
40. Payments for Variations
40.1 If the additional or altered work includes any class of work for which no
rate is specified in this contract, then such class of work shall be carried
(i) At the rate derived from the item within the contract which is comparable
to the one involving additional or altered class of work; where there are
more than one comparable items, the item of the contract which is nearest
in comparison with regard to class or classes of the work involved shall be
selected and the decision of the Superintending Engineer as to the nearest
comparable item shall be final and binding on the contractor.
(ii) If the rate cannot be derived in accordance with (i) above, such class of
works shall be carried out at the rate entered in the Schedule of Rates of
for the year in which the tender was received, increased or decreased by
the percentage by which the tender amount is more or less as compared to
the amount arrived at the rates in the “Schedule of Rates” of the Division in
the year in which the tender was received. If the Schedule of rates of the
Division does not contain all the items, the percentage increase or
decrease of the tender shall be calculated considering such items which
were included in the “Scheduled Rates” of the division for the year and for
materials consumed on such item the rate to be charged would be the
basic rate taken into account for fixing the rate in S.O.R. referred to above.
(iii) If it is not possible to arrive at the rate from (i) and (ii) above, such class of
work shall be carried out at the rate decided by the competent authorities
on the basis of detailed rate analysis after hearing the contractor before a
Committee of two Superintending Engineers stationed at the same place or
the nearest place.
40.2 If the additional or altered work, for which no rate is entered in the
“Schedule of Rates” of the Division is ordered to be carried out before the
rate is agreed upon, then the contractor shall within seven days of the date
of receipt by him of the order to carry out the work, inform the Engineer-
in-charge of the rate, which it is his intention to charge for such class of
work and if the Engineer in charge does not agree to this rates, he shall by
notice in writing be at liberty to cancel his order to carry out such class of
work and arrange to carry it out in such manner as he may consider it
advisable, provided always that if the contractor shall commence work or
incur any expenditure in regard thereof before the rates shall have been
determined as lastly herein before mentioned, then in such cases he shall
only be entitled to be paid in respect of the work carried out or
expenditure incurred by him prior to the date of the determination of the
rate as aforesaid according to such rate or rates as shall be fixed by the
Engineer-in-charge after obtaining approval of the Competent
Authority if needed as per delegation of Powers of SSNNL. In the event
of the dispute, the decision of the Competent Authority of SSNNL shall
Where, however, the work is to be executed according to the
designs, drawings and specifications recommended by the contractor and
accepted by the competent authority, the alternation above referred to
shall be within the scope of such designs, drawings and specifications
appended to the tenders.
The time limit for the completion of the work shall be extended in
the proportion that the increase in the cost occasioned by alterations bears
to the cost of the original work and the certificate of the Engineer-in-
charge as to such proportion shall be final and conclusive.
41. Cash Flow Forecasts
41.1 When the programme is updated, the contractor is to provide the engineer
with an updated cash flow forecast.
42. Payment certificates.
42.1 The Contractor shall submit to the Engineer monthly statements of the
estimated value of the work completed less the cumulative amount
certified previously.
42.2 The Engineer shall check the Contractor’s monthly statement within
days and certify the amount to be paid to the Contractor after taking in to
account any credit or debit for the month in question in respect of
materials for the works in the relevant amounts and under conditions set
forth in sub-clause 32.3 of the Contract Data (secured Advance).
42.3 The value of work executed shall be determined by the Engineer.
42.4 The value of work executed shall comprise the value of the quantities of
the items in the Bill of Quantities completed.
42.5 The value of work executed shall include the valuation of variations and
compensation events.
42.6 The Engineer may exclude any item certified in a previous certificate or
reduce the proportion of any item previously certified in any certificate in
the light of later information
43.1 Payments shall be adjusted for deductions for advance payments, retention,
other recoveries in terms of the contract and taxes at source, as applicable
under the law. The Employer shall pay the Contractor the amounts
certified by the Engineer within 28 days of the date of each certificate.
43.2 Payment of GST (prevailing rates) on the amount payable under the
contract to the Contractor will be made by the Employer. Hence, it is the
responsibility of the contractor to pay the GST to the concerned Authority.
43.3Items of the works for which no rate or price has been entered in will not be
paid by the Employer and shall be deemed covered by other rates and
prices in the Contract.
44. Compensation events
44.1 The following are compensation Events unless they are caused by the
(a) The Employer does not give access to a part of the Site by the site
Possession date stated in Contract data to the Contractor
44.2 In case of compensation event occurs and it prevents the work being
completed beyond the Intended Completion Date then Authority will
approve EOT with eligible contractual price escalation.
45.1 The rates quoted by the Contractor must be inclusive of all taxes prevailing
on due date of bid submission except GST. However, any subsequent
changes in the tax structure by Government after due date of bid
submission will be compensated (+/-) on availability or submission of
actual documentation. Contractor will have to intimate Engineer regarding
changes occurred in the tax structure after bid submission. If the
contractor fails to provide such information and if any financial obligation
may arise due to change in tax structure, same will be recovered from the
45.2 GST will be paid separately on the bills. Hence, it is the responsibility of the
contractor to pay the GST to the concerned Authority.
46. Currencies.
46.1 All payment shall be made in Indian Rupees.
47. Price Adjustment
47.1 Contract price shall be adjusted for increase or decrease in rates and price
of labour, materials, fuels and lubricants in accordance with the following
principles and procedures and as per formula given in the contract data:
(a) The price adjustment shall apply for the work done from the start date
given in the contract data up to end of the initial intended completion
date or extensions granted by the Engineer and shall not apply to the
work carried out beyond the stipulated time for reasons attributable to
the contractor.
(b) The price adjustment shall be determined during each month from the
formula given in the contract data.
(c) Following expressions and meanings during to the work done during
R = Total value of work done during the month. It would include the
amount of secured advance granted, if any, during the month less the
amount of secured advance recovered, if any during the month. It will
exclude value for works executed under variations for which price
adjustment will be worked separately based on the terms mutually
47.2 To the extent that full compensation for any rise or fall in costs to the
contractor is not covered by the provisions of this or other clause in the
contract, the unit rates and prices included in the contract shall be deemed
to include amounts to cover the contingency of such other rise or fall in
48.1 The Employer shall retain from each payment due to Contractor the
proportion stated in the Contract Data until Completion of the whole of the
48.2 On Completion of the whole of the Works half the total amount retained is
48.2 On Completion of the whole of the Works half the total amount retained is
repaid to the Contractor and half when the Defects Liability Period has
passed and the Engineer has certified that all Defects notified by the
Engineer to the Contractor before the end of this period have been
48.3 On completion of the whole works, the contractor may substitute retention
money with an “on demand” Bank guarantee.
In case, Contractor requests for refund of the Retention Money
deducted by the Employer under the provision of this clause, Employer
shall consider the said request of the Contractor provided that the refund
hereunder shall be made in tranches of not less than 1% (One Percent) of
the Contract Price and Contractor furnishes an irrevocable and
unconditional Bank guarantee for an equal amount substantially in the
format of Bank Guarantee for Performance Guarantee enclosed with SBD
and valid up to 60 day beyond the scheduled / extended Defects Liability
Period. On completion of the whole works, the contractor has however an
option to submit a fresh irrevocable and unconditional Bank Guarantee for
an amount equal to 5% of the total value of work executed substantially in
the format of Bank Guarantee for Performance Guarantee enclosed with
SBD and valid up to 60 days beyond the Defect Liability Period and yet
refund the Retention Money Bank Guarantee submitted for refund of
Retention Money.
49. Liquidated Damages
49.1 The Contractor shall pay liquidated damages to the Employer at the rate
per day stated in the Contract Data for each day that the Completion Date
is later than the Intended Completion Date (for the whole works or the
milestone as stated in the contract data). The total amount of liquidated
milestone as stated in the contract data). The total amount of liquidated
damages shall not exceed the amount defined in the Contract Data. The
Employer may deduct liquidated damages from payment due to the
Contractor. Payment of liquidated damages does not affect the
Contractor’s liabilities.
49.2 If the Intended Completion Date is extended after liquidated damages have
been paid, the Engineer shall correct any overpayment of liquidated
damages by the Contractor by adjusting the next payment certificate. The
Contractor shall not be entitled for any interest on the over payment
calculated from the date of payment to the date of repayment.
49.3 If the contractor fails to comply with the time for completion as stipulated
in the tender, then the contractor shall pay to the employer the relevant
sum stated in the Contract Data as Liquidated damages for such default
and not as penalty for everyday or part of day which shall elapse between
relevant time for completion and the date stated in the taking over
certificate of the whole of the works on the relevant section, subject to the
limit stated in the contract data.
The employer may, without prejudice to any other method of
recovery deduct the amount of such damages from any monies due or to
become due to the contractor. The payment or deduction of such damages
shall not relieve the contractor from his obligation to complete the works
on from any other of his obligations and liabilities under the contract.
49.4 If, before the Time for Completion of the whole of the Works or, if
applicable any Section, a Taking Over Certificate has been issued for any
part of the Works or of a Section, the liquidated damages for delay in
completion of the remainder of the Works or of that Section shall, for any
period of delay after the date stated in such Taking-Over-Certificate, and in
the absence of alternative provisions in the Contract, be reduced in the
proportion which the value of the part so certified bears to the value of the
whole of the Works or Section, as applicable. The provisions of this Sub-
clause shall only apply to the rate of liquidated damages and shall not
affect the limit thereof.
50.1 If the contractor achieves completion of the whole of the works prior to the
intended Completion Date prescribed in Contract Data the Employer shall
pay to the contractor a sum stated in Contract Data as bonus for every
completed month but subjected to maximum amount as stated in
Contract Data; which shall elapse between the date of completion of all
items of works as stipulated in the contract, including variations ordered
by the Engineer and the time prescribed in Clause
50.2 Bonus shall be paid only to works amounting to above INR 5 crore with
time limit of the works is equal or more than 6 months. The bonus would
be paid as under
% of Time Saved % of Initial Contract Price
entitled for Bonus
Less than 10% 0%
51. Advance Payment.
51.1 The Employer shall make advance payment (not to be paid less than two
installments except in special circumstances for which the reason to be
Recorded in writing) to the Contractor of the amounts stated in the
Contract Date by the date stated in the Contract Date, against provision by
the Contactor of an Unconditional Bank Guarantee in a form and by a bank
acceptable to the Employer in amounts and currencies equal to be at least
110% of the advance payment. The guarantee shall remain effective until
advance payment has been repaid, but the amount of the guarantee shall
be progressively reduced by the amounts repaid by the Contractor. The
Mobilization advance would be deemed as interest bearing advance at an
interest rate of 10 % to be compounded, quarterly.
51.2 The Contractor is to use the advance payment only to pay for Equipment,
plant and Mobilization expenses required specifically for execution of the
Works. The Contractor shall demonstrate that advance payment has been
used in this way by supplying copies of invoices or other documents to the
51.3 The advance payment shall be repaid by deduction proportionate amount
from payments otherwise due to the Contractor, following the schedule of
completed percentages of the Works on a payment basis. No account shall
be taken of the advance payment or its repayment in assessing valuations
of work done, variations, price adjustments, Compensation Events, or
Liquidated damages.
52.1 The performance Security (including additional security for unbalanced
bids) shall be provided to the Employer no later than the date specified in
the Letter of Acceptance and shall be issued in an amount and form and by
a bank or surety acceptable to the Employer, and denominated in Indian
Rupees. The performance Security shall be valid until a date 60 days from
the date of expiry of Defects Liability Period and the additional security for
unbalanced bids shall be valid until a date 28 days from the date of issue of
the certificate of completion.
54. Cost of Repairs.
54.1 Loss or damage to the Works or Materials to be incorporated in the Works
between the Start date and the end of Defects Correction periods shall be
remedied by the Contractor at the Contractor’s cost if the loss or damages
arises from the Contractor’s acts or omissions.
E.FINISHING THE CONTRACT
55.1 The Contractor shall request the Engineer to issue a Certificate of
Completion of the works and the Engineer will do so upon deciding that
the work is completed.
56. Taking Over
56.1 The Employer shall take over the Site and the Works within seven days of
the Engineer issuing a certificate of Completion.
57. Final Account
57.1 The Contractor shall supply to the Engineer a detailed final account of the
total amount that the Contractor considers payable as full and final
total amount that the Contractor considers payable as full and final
settlement of all claims under the Contract for items before the end of the
Defects Liability Period. The Engineer shall issue a Defect Liability
Certificate and certify any final payment that is due to the Contractor
within 56 days of receiving the Contractor's account if it is correct and
complete. If it is not, the Engineer shall issue within 56 days a schedule
that states the scope of the corrections or additions that are necessary. If
the Final Account is still unsatisfactory after it has been resubmitted, the
Engineer shall decide on the amount payable to the Contractor and issue a
payment certificate, within 56 days of receiving the Contractor’s revised
57.2 If reversal in characteristic of tender (L1 becoming L2) on account of
excesses and savings in final account is observed, the Engineer/Employer
shall be at liberty to restrict the final payment of BOQ items to the lowest
amount evaluated of the bids considering the final quantities and the rates
quoted including the rebates if any. Payment of variation items shall
however be made at the rates approved by the Employer, within 90 days
from the physical completion of work.
58. Operating and Maintenance Manuals
58.1 If “as built” drawings and/or operating and maintenance manuals are
required, the Contractor shall supply them by the dates stated in the
58.2 If the Contractor does not supply the Drawings and/or manuals by the
dates stated in the Contract data, or they do not receive the Engineer’s
approval, the Engineer shall withhold the amount stated in the Contract
Data from payments due to the Contractor.
59. Termination
59.1 The Employer or the Contractor may terminate the Contract if the other
party causes a fundamental breach of the Contract.
59.2 Fundamental breaches of Contract include, but shall not be limited to the
1. The contractor stops work for 28 days when no stoppage of work is
shown on the current programme and the stoppage has not been
authorized by the Engineer
2. The Engineer instructs the Contractor to delay the progress of the
Works and the instructions is not withdrawn within 28 days;
3. The Employer or the Contractor is made bankrupt or goes into
liquidation other than for a reconstructions or amalgamation
4. A payment certified by the Engineer is not paid by the Employer to the
Contractor within 56 days of the date of the Engineer’s certificate
5. The Engineer gives Notice that failure to correct a particular Defect is a
fundamental breach of Contract and the Contractor fails to correct it
within a reasonable period of time determined by the Engineer;
6. The Contractor does not maintain a security which is required;
7. The Contractor has delayed the completion of works by the number of
days for which the maximum amount of liquidated damages can be
paid as defined in the Contract data; and
8. If the Contractor, in the judgment of the Employer has engaged in
corrupt or fraudulent practices in competing for or in executing the
For the purpose of this paragraph: “corrupt practice” means the
offering, giving, receiving or soliciting of anything of value to influence the
action of a public official in the procurement process or in contract
execution. “Fraudulent practice” means a misrepresentation of facts in
order to influence a procurement process or the execution of a contract to
the detriment of the borrower, and includes collusive practice among
Bidders (prior to or after bid submission) designed to establish bid prices
at artificial non-competitive levels and to deprive the Borrower of the
benefits of free and open competition.
59.3 When either party to the Contract gives notice of a breach of contract to
the Engineer for a cause other than those listed under Sub Clause
above, the Engineer shall decide whether the breach is fundamental or not.
59.4 Notwithstanding the above, the employer may terminate the Contract for
60. Payment upon Termination
60.1 If the Contract is terminated because of a fundamental breach of Contract
by the Contractor, the Engineer shall issue a Certificate for the value of the
work done less advance payments received up to the date of the issue of
the certificate, less other recoveries due in terms of the contract, less taxes
due to deducted at source as per applicable law and less the percentage to
apply to the work not completed as indicated in the Contract data.
Additional Liquidated Damages shall not apply. If the total amount due to
Additional Liquidated Damages shall not apply. If the total amount due to
the Employer exceeds any payment due to the Contractor the difference
shall be a debt payable to the Employer.
60.2 If the Contract is terminated at the Employer’s convenience or because of a
fundamental breach of Contract by the Employer, the Engineer shall issue
a certificate for the value of the work done, the cost of balance material
brought by the contractor and available at site, the reasonable cost of
removal of equipment, repatriation of the Contractor’s personnel
employed solely on the works, and the Contractor’s cost of protecting and
securing the Works and less advance payment received up to the date of
the certificate, less other recoveries due in terms of the contract and less
taxes due to deducted at source as per applicable law.
61.1 All materials on the Site, Plant Equipment’s, Temporary Works and Works
are deemed to be property of the Employer, if the Contract is terminated
because of a Contractor’s default.
62. Release from Performance
62.1 If the Contract is frustrated by the outbreak of war of by any other event
entirely outside the control of either the Employer or the Contractor the
Engineer shall certify that the Contract has been frustrated. The
Contractor shall make the Site safe and stop work as quickly as possible
after receiving this certificate and shall be paid for all work carried out
before receiving it and for any work carried out afterwards to which
commitment was made.
F. SPECIAL CONDITIONS OF CONTRACT
The Contractor shall, unless otherwise provided in the Contract,
make his own arrangements for the engagement of all staff and labour,
local or other, and for their payment of housing, feeding and transport.
The Contractor shall, if required by the Engineer, deliver to the
Engineer a return in detail, in such form and at such intervals as the
Engineer may prescribe, showing the staff and the numbers of the several
classes of labour from time to time employed by the Contractor on the site
and such other information as the Engineer may require.
64. COMPLIANCE WITH LABOUR REGULATIONS
During continuance of the contact, the Contractor and his sub-
contractor shall abide at all times by all existing labour enactments and
rules made thereunder, regulations, notification and bye laws of the State
or central Government or local authority and any other labour law
(including rules), regulations, bye laws that may be passed or notifications
that may be issued under any labour law in future either by the State or
the Central Government or the local authority. Salient features of some of
the major labour laws that are applicable to the construction industry are
given below. The Contractor shall keep the Employer indemnified in case
any action is taken against the Employer by the competent authority on
account of contravention of any of the provisions of any Act or rules made
thereunder, regulations or notifications including amendments. If the
Employer is caused to pay or reimburse, such amounts as may be
necessary to cause or observe, or for observance of the provisions
stipulated in the notifications/bye laws/Acts/Rules/regulations including
amendments, if any, on the part of the Contractor, the Engineer/employer
shall have the right to deduct any money due to the
Contractor including his amount of performance security. The
Employer/Engineer shall also have the right to recover from the
Contractor any sum required or estimated to be required for making good
the loss or damage suffered by the Employer.
The employees of the Contractor and the Sub-Contractor in no case shall
be treated as the employees of the Employer at any point to time.
SALIENT FEATURES OF SOME MAJOR LABOUR AND OTHER LAWS APPLICABLE
TO ESTABLISHMENTS ENGAGED IN BUILDING AND OTHER CONSTRUCTIONS
A) Workmen Compensation Act 1923:- The Act provides for compensation in
case of injury by accident arising out of and during the course of
B) Payment of Gratuity Act. 1972:- Gratuity is payable to an employee under
the Act on satisfaction of certain conditions on separation if an employee has
completed 5 years service or more on death, the rate of 15 days wages for
every completed year of service. The Act is applicable to all establishments
employing 10 or more employees.
C) Employees P.F. and Miscellaneous Provision Act 1952:-The Act Provides
for monthly contributions by the employer plus workers @ 10% or 8.33%
The benefits payable under the Act are :
1. Pension or family pension on retirement or death, as the case may be.
2. Deposit linked insurance on the death in harness of the worker.
3. Payment of P.F. accumulation on retirement/death etc.
D) Maternity Benefit Act 1951 :- The Act provides for leave and some other
benefits to women employees in case of confinement or miscarriage etc.
E) Contract Labour (Regulation & Abolition) Act 1970: The Act provides for
certain welfare measures to be provided by the Contractor to contract labour
and in case the Contractor fails to provide, the same are required to be
provided, by the Principal Employer by Law. The principal Employer is
required to take Certificate of Registration and the Contractor is required to
take license from the designated Officer. The Act is applicable to the
establishments or Contractor of Principal Employer, if they employ 20 or
more contract labour.
F) Minimum Wages Act 1948 :-The Employer is supposed to pay not less than
the Minimum Wages fixed by appropriate Government as per provisions of
the Act, if the employment is a scheduled employment. Construction of
Building, Roads, Runways are scheduled employment.
G) Payments of wages Act 1936:-It lays down as to by what date the wages are
to be paid, when it will be paid and what deductions can be made from the
wages of the workers.
H) Equal remunerations Act 1979 :- The Act provides for payment of equal
wages for work of equal nature to Male and Female workers and for not
making discrimination against female employees in the matter of transfer,
training and promotions etc.
I) Payments of Bonus Act 1965:- The Act is applicable to all establishments
employing 20 or more employees. The Act provides for payments of annual
bonus subject to a minimum of 8.33% of wages and maximum of 20 % of
wages to employees drawing Rs. 3500/- per month or less. The bonus to be
paid to employees getting Rs, 2500/- per month or above Rs. 3500/- per
month shall be worked out by taking wages as Rs. 2500/- per month only.
The Act does not apply to certain establishments. The newly set-up
establishments are exempted for five years in certain circumstances. Some of
the State Governments have reduced the employment size from 20 to 10 for
the purpose of applicability of this Act.
J) Industrial Disputes Act 1947 :- The Act lays down the machinery and
procedure for resolutions of Industrial disputes, in what situations a strike or
lock-out becomes illegal and what are the requirements for laying off or
retrenching the employees or closing down the establishment.
K) Industrial employment (standing Orders) Act 1946 :- It is applicable to all
establishments employing 100 or more workmen (employment size reduced
by some of the State and Central Government to 50). The Act provides for
laying down rules governing the conditions of employment by the Employer
on matters provided in the Act and get the same certified by the designated
L) Trade Unions Act 1926:-The Act lays the procedure for registration of trade
unions of workmen and employers. The Trade Unions registered under the
Act have given certain immunities from civil and criminal liabilities.
M) Child Labour (Prohibition & Regulation Act 1986 :-The Act prohibits
employment of children below 14 years of age in certain occupations and
process and provides for regulation of employment of children in all other
occupations and processes. Employment of Child labour is prohibited in
Building and Construction Industry.
N) Inter – State Migrant workmen’s (Regulation of Employment
&Conditions of service) Act 1979:-The Act is applicable to an
establishment which employs 5 or more inter-state migrant workmen
through an intermediary (who has recruited workmen in one state for
employment in the establishment situated in another state).The inter-state
migrant workmen, is an establishment to which this Act becomes applicable,
are required to be provided certain facilities such as housing, medical aid,
traveling expenses from home upto the establishment and back, etc.
O) The Building and Other Construction workers (Regulation of
employment and Conditions of Service) Act 1996 and the Cess Act of
1996:-All the establishments who carry on any building or other
constructions work and employ 10 or more workers are covered under this
All such establishments are required to pay cess at the rate not exceeding 2%
of the cost of construction as may be modified by the government. The
Employer of the establishment is required to provide safety measures at the
Building or construction work and other welfare measures, such as canteens,
First Aid facilities, Ambulance, Housing accommodations for workers near
the workplace etc. The Employer to whom the Act applies has to obtain a
registration certificate from the Registering Officers appointed by the
P) Factories Act 1948 :-The Act lays down the procedure for approval of plans
before setting up a factory, health and safety provisions, welfare provisions,
working hours, annual earned leave and rendering information regarding
accidents or dangerous occurrences to designated authorities. It is applicable
to premises employing 10 persons or more with aid of power or 20 or more
persons without the aid of power engaged in the manufacturing process.
Q) Royalty charges-The contractor shall pay the royalty to the competent
authority as per rule. The royalty charges paid shall be borne by the
contractor and shall not be reimbursed by the Employer.
R) Following Pollution control Acts and amendments made thereof
from time to time shall be applicable.
1. Water (Preservation and control of Pollution) Act,
2. Air (Prevention and Control of Pollution Act
3. Environmental (Protection) Act
The contractor must commit to adopting Environmental
management plan for best energy use, waste management, the
reduction of pollution as in EMS (Environmental Management
system)ISO-14001-
65. ARBITRATION (GCC Clause 24)
The procedure for arbitration will be as follows: -
24.1If the Contractor is of the view that a decision taken by the Engineer was
either outside the authority given to the Engineer by the Contract or that
the decision was wrongly taken, the decision shall be referred to
COMPETENT AUTHORITY OF SSNNL within 14 days of the notification of
the Engineer's decision. If the issue is not resolved, any party can refer the
matter for conciliation within 15 days from the decision given by such
Competent Authority.
(a) For the work up to Rs.100 Cr., if any of the parties is not satisfied with
the decision of the COMPETENT AUTHORITY, both the parties have to
refer to the Director (CAD/CIVIL/CANAL), SSNNL concerned for the
conciliation process.
(b) For the work more than Rs.100 Cr., if any of the parties is not satisfied
with the decision of the COMPETENT AUTHORITY, both parties have
to refer to the MD,SSNNL, Government of Gujarat for the conciliation
If the dispute is not resolved through the conciliation process,
contractor may refer the dispute to Gujarat Public Works Contract
Dispute Arbitration Tribunal. If the Contractor fails to refer a claim /
dispute to the Higher Authority within 14 days of the notification of the
Engineer's decision, the Contractor shall not be entitled to any
additional payment/claim if he doesn’t follow the above sequence in
stipulated time.
However, during such period, he would not stop the work in any case.
Clause Reference With respect
Item marked “N/A” do not apply to this Contract.
1. The Employers is Name: Executive Engineer, N.P. Canal Division No. 9, Sanand
Address: Narmada Vasahat, Behind Sanand Police station Sanand-382110
Name of authorized Representative (will be intimated later)
2. The Engineer is Executive Engineer, N.P. Canal Division No. 9, Sanand
Name of Authorized Representative: Executive Engineer, N.P. Canal Division No.
3. The Defects Liability Period is 03 month from the date of completion.
4. The Start Date shall be 1st days for the date of issue of the Notice to proceed with the
5. The Intended Completion Date for the whole of the works is 03 Months after start
of work with the following milestones:
Milestone dates: [CL.2.2& 49.1]
Physical works to be completed Period from the start date
Milestone 1 i.e. 20 % 30 days.
Milestone 2 i.e. 70 % 60 days.
Milestone 3 i.e. 100% 90 days.
6. The Site is located at Ambaliyara,Meda adraj
7. The name and identification number of the Contract is: [CL.1.1]
8. The works consist of Rs. 7,34,487.20 with items as per B.O.Q. The works shall, inter
alia, include the following, as Specified or as directed: [CL.1.1]
Site clearance; setting – out and layout; widening of existing
carriageway and strengthening including camber corrections;
construction of new road/ Parallel service road; bituminous
pavements remodeling/construction of Junctions, intersections, bus
bays, lay-bays; supplying and placing of drainage Channels, flumes,
guard posts and guard other related items; construction/extension
of cross drainage works, bridge, approaches and other related
stones; protective works for roads/bridge; all aspects of quality
assurance of various components of the works; rectification of The
defects in the completed works during the Defects Liability Period;
submission of “As- built’’ drawings and any other related
documents; and other item of work as may be required to be carried
out for completing the work in accordance with the drawings and
the provisions of the contract and to ensure safety.
(B) Bridge Works
Site clearance; setting out, provision of foundations, piers abutments and
bearing; prestressed/reinforced cement concrete
superstructure; wearing coat, hand railings, expansion joints,
approach slabs, drainages spouts/ downtake pipes, arrangements for fixing
light posts, water
mains, utilities etc; provision of suitably designed protective works;
providing wing/return walls; provision of road markings, road signs etc.;
all aspects of quality assurance; clearing the site and handing over the
works on completion; rectification of the defects during the Defects
Liability Period and submission of “As-built” drawings and other related
documents; and other items of work as may be required to be carried out
for completing the works in accordance with the drawings and the
provisions of the contract and to Insure safety
(C) Other Items [CL.1.1]
Any Other Items as required to fulfill all contractual obligations as per the Bid
10. The following documents also form part of the Contract: [CL.2.3(9)]
As per clause 2-3
11. The law which applies to the Contract is the law of Union of India [CL.3.1]
12. The language of the Contract documents is English [CL.3.1]
13. Limit of subcontracting 25% of the Initial Contract Price [CL.7.1]
14. The Schedule of Other Contractors [CL.8]
15. The Schedule of Key Personnel As per Annex – II to Section I [CL.9]
16. The minimum insurance cover for physical property, injury and death is Rs. 5 lakhs
per occurrence with the number of occurrences limited to four. After each
occurrence, the contractor will pay an additional premium necessary to make
insurance valid for four occurrences always.
17. Site Investigation report [CL.14]
18. The Site Possession dates shall be …………………….. [CL.21]
19. The period for submission of programme for approval of the engineer [CL. 27.1]
shall be 21 days from the issue of Letter of Acceptance.
20. The period between program updates will be 15 days. [CL.27.3]
21. The amount to be withheld for late submission of an updated [CL. 27.3]
programme shall be Rs 0.50 lakhs
22. The following events shall also be Compensation Events [CL. 44]
Substantially adverse ground conditions encountered during the course of
execution of work not provided for in the bidding document.
(i) Removal of underground utilities detected subsequently
(ii) Significant changes in classification of soil requiring additional
mobilization by the contractor, e.g. ordinary soil to rock excavation,
(iii) Removal of unsuitable material like marsh, debris dumps, etc. not
caused by the contractor.
(iv) Artesian conditions
(v) Seepage, erosion landslide
(vi) River training requiring protection of permanent work
(vii) Presence of historical, archaeological or religious structures,
monuments interfering with the works
(viii) Restriction of access to ground imposed by civil, judicial, or military
23. The currency of the Contract is Indian Rupees [CL. 46]
24. The formula (e) for adjustment of prices are as under: [CL.47]
•If any of the commodities like Cement, Steel or Bitumen are not
found applicable in a work, the weight component of that
commodities {i.e. ‘Cement’ (Pc), ‘Steel’ (Ps) or ‘Bitumen' (Pb) as
indicated in SBD for the purpose of Price Adjustment} shall be
clubbed with the weight component of ‘Other Material’ (Pm),
such that the gross % weight of the components shall remain as
R = value of work as defined in Clause 47.1 of Conditions of Contract
Adjustment for labour component
(i) Price adjustment for increase or decrease in the cost due to labour
shall be paid in accordance with the following formula:
VL = Increase or decrease in the cost of work during the
month under consideration due to changes in rates
for local labour
L0 = The consumer price index for industrial workers for the
State on 28 days preceding the scheduled date of
opening of technical Bids as published by Labour
Bureau, Ministry of Labour, Government of India
Li = The consumer price index for industrial workers for the
State for the month under consideration as published
by the Labour Bureau, Ministry of Labour,
Pl = Percentage of labor component of the work.
Adjustment for cement component.
(ii) Prices adjustment for increase or decrease in the cost of cement
procured by the contractor
Vc= Increase or decrease in the cost of work during the
month under consideration due to changes in
rates for cement.
C0 = The all India wholesale price index for Ordinary
Portland Cement on 28 days preceding the
scheduled date of opening of technical bid as
published by the Office of the Economic Adviser,
Department for Promotion of Industry and
Internal Trade, Ministry of Commerce & Industry.
Ci= The all India average wholesale price index for Ordinary
Portland Cement for the month under consideration
as published by Office of the Economic Adviser,
Department for Promotion of Industry and Internal
Trade, Ministry of Commerce & Industry.
Pc = Percentage of cement component of the work
Adjustment for steel component
(iii) Price adjustment for increase or decrease in the cost of steel procured by the
contractor shall be paid in accordance with the following formula
Vs= Increase or decrease in the cost of work during the month under
consideration due to changes in the rates for steel
So= The all India wholesale price index for steel (Mild Steel - Long Products
Rebars) on 28 days preceding the date of opening of Bids as published by the
Office of the Economic Adviser, Department for Promotion of Industry
and Internal Trade, Ministry of Commerce & Industry.
Si= The all India average wholesale price index for steel (Mild Steel - Long
Products Rebars) for the month under consideration as published by
Office of the Economic Adviser, Department for Promotion of Industry
and Internal Trade, Ministry of Commerce & Industry.
Ps = Percentage of steel component of the work
Note : For the application of this clause, the index of Mild Steel- Long
products Rebarshas been chosen to represent the steel group.
Adjustments of bitumen component
(iv) Price adjustment for increase in the cost of bitumen shall be paid in accordance
with the following formula
Vb= Increase or decrease in the cost of work during the month
under consideration due to changes in rates for bitumen.
Bo = The official retail price of bitumen at the IOC depot at the
nearest centre on the day 28 days prior to the scheduled date of
opening of technical bid.
Bi = The official retail price of bitumen of IOC depot at the nearest
centre for the 15th day of the month under consideration.
Pb= Percentage of bitumen component of the work
Adjustment of POL (fuel and lubricant) component
(v) Price adjustment for increase or decrease in cost of POL (fuel and lubricant) shall
be paid in accordance with the following formula
Vf= Increase or decrease in the cost of work during the month
under consideration due to changes in rates for fuel and lubricants.
Fo= The official retail price of High Speed Diesel (HSD) at the
existing consumer pumps of IOC at the nearest centre on the day
prior to the date of opening of Bids.
Fi = The official retail price of HSD at the existing consumer pumps
of IOC at the nearest centre for the 15th day of the month of the
under consideration.
Pf = Percentage of fuel and lubricants component of the work
Note: For the application of this clause, the price of High-Speed diesel Oil
has been chosen to represent the fuel and lubricants group.
Adjustment for Construction Machinery
(vi) Price adjustment for increase or decrease in the cost of plant and Machinery
spare procured by the Contractor shall be paid in accordance with the following
Vp= Increase or decrease in the cost of work during the month under
consideration due to changes in rates for plant and machinery spares
P0 = The all India wholesale price index for manufacturer of
machinery for mining, quarrying and Construction for the
month under consideration as published Office of the Economic
Adviser, Department for Promotion of Industry and Internal
Trade, Ministry of Commerce & Industry.
Pi = The all India average wholesale price index for manufacturer
of machinery for mining, quarrying and Construction for the
month under consideration as published Office of the Economic
Adviser, Department for Promotion of Industry and Internal
Trade, Ministry of Commerce & Industry.
Pp= Percentage of plant and machinery spares component of the work.
Note: For the application of this clause, index of Heavy Machinery and parts
has been chosen to represent the Plant and Machinery Spares group
Adjustment of other materials Component
(vii) Price adjustment for increase or decrease in cost of local materials other than
cement, steel, bitumen and POL procured by the contractor shall be paid in
accordance with the following formula
Vm= Increase or decrease in the cost of work during the month
under consideration due to change in rates for local materials other
than cement, steel, bitumen and POL.
M0 = The All Indian wholesale price index (all commodities) on
days preceding the scheduled date of opening of technical Bids, as
published by the Office of the Economic Adviser, Department for
Promotion of Industry and Internal Trade, Ministry of
Commerce & Industry.
Mi= The All India wholesale price index (all commodities) for the
month under consideration as published by the Office of the
Economic Adviser, Department for Promotion of Industry and
Internal Trade, Ministry of Commerce & Industry.
Pm = Percentage of local material components (other than cement,
steel, bitumen and POL) of the work.
The following percentage will govern the price adjustment for the
entire contract:
1. Labour-Pl 4.54.%
2. Cement – Pc 1.79. %
3. Steel - Ps 1.90 %
4. Bitumen – Pb 0.00%
6. Plant & Machinery Spares Pp 23.63. %
7. Other Materials –Pm 68.14 %
25. The proportion of payments retained (retention money) shall be 6% {CL.
48} from each bill subject to a maximum of 5% of final contract price.
26. Amount of Liquidated damages for delay in completion of works
For Whole of work {CL.49}
(1/2000)thof the Initial
contract price, rounded off to the
nearest Thousand, per day. For
sectional Completion (wherever
specified In item 6 of Contract data)
(1/2000)thof initial contract price
for 5 km Section, rounded off to the
nearest thousand per day.
27. Maximum limit of liquidated damages For delay in completion work
10percent of the Initial {CL.
49}Contract Price rounded off to
the nearest thousand
28. Amount of Bonus for early completion Amount of bonus for early
Completion of work shall be
given as per CL.50 of Section-3
29. Maximum limit of bonus for early 5 percent of the Contract {CL. 50}
Completion of work Price
30. The amount of the advance payment are: {CL. 51 & 52}
Nature of Advances Amount (Rs.) Conditions to Be fulfilled
i Mobilization 10% of the contract On submission of unconditional
Price Bank Guarantee. (to be drawn
before the end of 20% of the
contract period). The
contractor may furnish four
bank guarantees of 2.5 % of
each valid for the full period.
ii. Equipment 90% for new and 50% of After equipment is brought to
depreciated value for old site(provided the Engineer is
equipment. Total amount
equipment. Total amount
satisfied That the equipment is
will be subject to a maximum
required for performance of the
of 5%of the Contract Price
contract)and on submission of
unconditional Bank Guarantee for
Amount of advance
iii Secured Deleted
(The advance payment will be paid to the Contractor no later than 28 days after
fulfillment of the above conditions).
31. Repayment of advance payment for mobilization and equipment {CL.
The advance loan shall be repaid with percentage deduction from the interim
payments certified by the Engineer under the Contract. Deduction shall
commence in the next Interim Payment Certificate following that in which the
total of all such payments to the Contractor has reached not less than
percent of the Contract Price or 6 (six) months from the date of payment of
first installment of advance, whichever period concludes earlier, and shall be
made at the rate of 20 percent (collectively for both Mobilization Advance
and Equipment Advance)of the amounts of all Interim Payment Certificate
until such time as the loan has been repaid, always provided that the loan
shall be completely repaid prior to the expiry of the original time for
completion pursuant to Clause 17 and
33. The securities shall be for the following minimum amounts equivalent {CL.
52} As a percentage of the Contract Price:
Performance Security for 5 percent of contract price plus Rs. …………….. (to be
decided after evaluation of the bid) as additional security in terms of ITB
The standard form of Performance security acceptable to the Employer shall
be an unconditional Bank Guarantee of the type as presented in Section 8 of
the Bidding Documents.
34. The Schedule of Operating and maintenance Manuals…..N/A. {CL.
35. The date by which “as– built” drawings (in scale as directed) in 2 sets {CL.
are required within 28 days of the issue of certificate of completion of the
whole or section of the work, as the case may be.
36. The amount to be withheld for failing to supply “as built” drawings {CL. 58}
by the Date required is Rs................... Lakhs.
37. The following events shall also be fundamentals breach of contract: {CL.59.2}
“The Contractor has contravened Sub- clause 7.1 and Clause 9 of GCC”
38. The percentage to apply the value of the work not completed representing
{Cl 60} the Employer’s additional cost for completing the Works shall be
TECHNICAL SPECIFICATION
Name of work : Realignment of DOL-1 Sub minor off-taking from kanjari Distributary at
ch.1600 m in ONGC area.
1.0 DESCRIPTION OF ITEM
Clearing the canal land width including removing the trees up to 0.50 M. girth, bushes
shrubs etc. including depositing the materials outside the canal land width as directed
1.1 PREPARARION OF SITE:
Clearing the Site
The contractor shall clear the entire area required for setting out. All tree stumps,
roots, brushwood, rubbish of all kinds, loose stones and all other objectionable
materials shall be removed by the contractor. All buried irrigation pipe line, kundi
& other structure shall removed by contractor. The ownership of all the usable
material, so removed from clearing site and/or excavation shall rest with the
SSNNL. Useful material shall stack as directed Cutting of all trees up to 0.50 m
girth shall be covered in this item. The contractor shall have to remove all the
stumps and roots of trees for which no additional payment shall be made. The
roots of trees shall be grubbed to a depth of 30 cm. below the ground. The
contractor shall dispose off all such materials out side the canal land width as
directed by the Engineer-In-Charge.
Before excavation and embankment works commence, the area between toe of
embankment in case of banking and cutting edge for excavation in case of full
cutting shall be stripped for a depth of about 0.10m of the surface soil including
vegetation, overlying grass, organic material, brushes, roots and the perishable or
unsuitable material and disposing off these as directed within a lead of 200m and
all lifts. Similar operations shall be done in the borrow areas. The stripping shall
generally be done for a depth of about 0.10m . But where organic material and
other unsuitable soli exist below 0.30m depth, the stripping shall extend to the
required depth and as directed by Engineer-in-charge to remove all the
Measurement and Payment (Item No.1):
Payment will be made for clearing the site in hectare as per rate quoted under item 1 of
Bill of quantity. No payment will be made for complying the requirements of this
paragraph for borrow area, hauling road and all cost shall be deemed to have been
included in rates quoted in relevant items of Bill of quantity.
2. 1 S CO PE OF WORK
1) The section covers specifications for item nos. 2,3 &7, All the work shall be executed as
per the specifications laid down in standard specifications published by Public Works
Department and as per the relevant provision of I.S. Code as applicable. In addition to
above, item wise specifications given elsewhere with this tender document shall be
2) Pipe diameters mentioned in the item are outer diameter of UPVC Pipe. The designs of sub-
minors are carried out considering UPVC pipes of Class-2 (work pressure 4kg/cm )
having following outer and inner diameters as per IS-4985:2000.
Sr. No. Nominal Outside Average Min Max
diameter Thickness Thickness
3) The relevant specifications for different types of pipe material shall be followed in
handling and laying of pipes. Manufacturing and factory testing and supplying at site of
work of different diameters of different types pipes for different tests confirming to
relevant I.S. or its latest revision.
4) The pipes manufactured at factory are to be carried to the site of work either directly
or stacked suitably along the road or elsewhere near the site. Extreme care shall be
taken while handling the pipes, damage during the transit and handling shall be at
Contractor’s account and shall not be payable. Damage pipes shall be rejected outright.
The discretion of the Engineer- in-charge in this behalf shall be final and binding on
the Contractor. The payment of the entry tax, octroi tax and all other taxes shall be the
responsibility of the Contractor
5) Spigot and socket dimensions including rubber ring groove shall conform to
latest revision of IS
6) All pipes shall be thoroughly inspected before laying, damaged pipe, if any shall not be
used & shall be removed from the site immediately.
7) For lowering, laying and jointing of the pipe, the provision of relevant I.S. shall be strictly
followed. Laying shall not be started till the bedding is approved by Engineer-in-
charge or his subordinate.
8) The clearing of site, excavation of pipe trench is included in the item. The specification
mentioned at sub-section -1 & 3 of of this volume.
9) The pipes shall be laid on earth which shall be bedded evenly and firmly as far as up to
the haunches of the pipe as to safely transmit the load expected from the back fill
through the pipe to the bed. This shall be done either by excavating the bottom of the
trenches to fit the curve of the pipe or by compacting the earth under round curve of the
pipe to form an even bed. Necessary provision shall be made for joints wherever
10) Pipe shall be lowered in trenches very carefully and if required it shall be lowered with
mechanical appliances such as crane, chain pulley block with tripped arrangements, etc.
11) The pipes shall be laid true to line and alignment with specified grades. Laying of pipes
shall preferably proceed upgrade of slopes.
12) The trenches shall be kept free of water till the jointing material is properly set.
13) Whenever there are chances of rain water entering into trenches, care shall be taken to
prevent pipe line from floating during the construction.
14) Jacking for pipe line should be done properly as per the instruction of the Engineer-in-
15) Before jacks are removed the side should be filled with well rammed earth to prevent all
chances of subsequent movement where more pipes are jacked later on.
16) If the laid pipe goes in zigzag in position due to excess of jacking the pipes have
to be removed and re-laid by the Contractor with no extra cost.
17) The Contractor shall remove all the silt and debris if found in the pipe line.
18) The Contractor shall have to make good any leakage at his cost and satisfactory test
shall have to be given after the same. The pipe line once laid and jointed but
damaged subsequently during the monsoon or due to any other reasons shall have
to be rectified by the Contractor. at his cost. The testing of the laid pipe line should
be in accordance with relevant I.S. or it’s Latest version and amendments thereto.
19) After pipe laying is completed and inspected thoroughly and tested, the pipe trenches
shall be filled with excavated stuff only. The work of back filling of trenches to its
natural ground is covered under this item. No separate payment will be made for
back filling. The back filling of excavated stuff or soil shall include back filling trenches
in layers not exceeding 15cm with watering and compacting the fill with suitable
compacting devices as directed by the Engineer-in-charge.
20) Due care shall be taken to protect existing structures, sewer line, telephone /
electricity cables, electric line, gas pipe line, irrigation pipe line etc. In the event of
damage to these utility service structures/ cables/pipe lines during the course of
execution shall have to be repaired / remedied by the Contractor. at his own cost &
21) At a n y p u b l i c h i g h w a y s , r o a d c r o s s i n g s o r a t s u c h o t h e r crossings, the
water carrying pipes shall be laid in the RCC NP3 class casing pipes. As per Item No.
. Payment of Item No. will be paid separately into respective item.
2.2 DESCRIPTION OF IT EM No. 2,3 and
Item no.-2 Providing and supplying in standard length ISI mark rigid un- plasticized PVC
pipes suitable for potable water with ringfit, joint including cost of rings as per
IS specification No.4985/2000 including all local and central taxes.
Transportation, freight charges, octroi, inspection charges, loading, unloading,
conveyance to the site of work and including cost of jointing materials etc
Item no.-3 Lowering, laying, jointing and testing un-plasticized PVC pipes & specials of
following class and diameter including labour, hydraulic testing etc. complete
but including cost of cement solvent
Item no.7 Providing and supplying at site of work including freight, loading, unloading,
stacking, and insurance and all taxes etc complete.
(i) Made from I.S.I. approved UPVC material (Work Pressure 4 Kg/cm2)
A) Tee (Preferably Moulded)
(i) size (110 x 110 mm) (vi) size (250 x 250 mm)
(ii) size (160 x 160 mm) (vii) size (280 x 280 mm)
(iii) size (180 x 180 mm) (viii) size (315 x 315 mm)
(iv) size (200 x 200 mm) (ix) size (355 x 355 mm)
(v) size (225 x 225 mm) (x) size (400 x 400 mm)
B) Elbo (Preferably Moulded)
(i) size (110 x 110 mm) (vi) size (250 x 250 mm)
(ii) size (160 x 160 mm) (vii) size (280 x 280 mm)
(iii) size (180 x 180 mm) (viii) size (315 x 315 mm)
(iv) size (200 x 200 mm) (ix) size (355 x 355 mm)
(v) size (225 x 225 mm) (x) size (400 x 400 mm)
II) Made from I.S.I. approved UPVC material (Work pressure 4 kg/cm2)
A) Reducer (Moulded/ Fabricated)
(i) size 110 x 63 mm xi) size 250x225 mm
ii) size 160 x 110 mm xii) size 280x250 mm
iii) size 180 x 110 mm xiii) size 315x280 mm
iv) size 200 x 110 mm xiv) size 355x315 mm
v) size 225 x 110 mm xv) size 400x355 mm
vi) size 250 x 110 mm xvi) size 225x160 mm
vii) size 180x160 mm xvii) size 250x160 mm
viii) size 200x160 mm xviii) size 280x160 mm
ix) size 200x180 mm xix) size 315x160 mm
x) size 225x200 mm xx) size 355x160mm
B) Tee (Moulded/ Fabricated)
(i) size 180x160 mm ix) size 200 x 180mm
ii) size 200x160 mm x) size 225x200 mm
iii) size 225x 160 mm xi) size 250x225 mm
iv) size 250 x 160 mm xii) size 280x250 mm
v) size 280 x 160 mm xiii) size 315x280 mm
vi) size 315 x 160 mm xiv) size 355x315 mm
vii) size 355 x 160 mm xv) size 400x355 mm
viii) size 400 x 160 mm
C) U.P.V.C. Bend (0 to 179 degree)
i)160 mm dia. (UPVC ) vi)280 mm dia. (UPVC)
ii)180 mm dia. (UPVC ) vii)315 mm dia. (UPVC)
iii)200 mm dia. (UPVC) vii)355 mm dia. (UPVC)
iv)225 mm dia. (UPVC) ix) 400 mm dia. (UPVC)
v)250 mm dia. (UPVC)
D) U.P.V.C. Couplers 10 kg/cm2(moulded) 200 MM
2.3 U PV C (un-plasticized polyvinyl chloride) PIPE LINE
2.3.1 The specification covers the work of providing and laying all diameter
UPVC Pipe line including testing and back filling the trenches etc.
2.3.2 General Specifications and requirements:
(1) Raw material:-
Raw material used to manufacture UPVC Pipes shall be virgin compound
(polyvinyl chloride resin) conforming to IS:4985-2000 and its testing shall
conform to IS:4669-1968.The bulk density of the UPVC compound shall be
to 0.53. The density of UPVC pipe shall be 1.40 to 1.46 g / cm3.
(2) Temperature variation: -
All the pipes to be manufactured, supplied and erected shall be resistant to
whether conditions like sun, dust, rain, wind etc as per the environmental
c o n d i t i o n s u n d e r the project a rea of SSNNL, Gandhinagar of State Gujarat.
They shall also be subject to carry and convey raw water under variable
temperature conditions ranging from 4 to 45 deg. Centigrade.
Each pipe shall be indelibly marked in English language at an interval of 1m by
heat embossing. The marking shall show the following.
1. Manufactures name or trade mark.
2. Grade of raw material
3. Class of pipe & pressure rating.
4. Outside diameter
5. Lot/batch No. of manufacturer.
6. ISI certification mark.
7. Name of Department / Project under which work is to be executed:
8. Any other important matter that the manufacturer or purchaser deems
fit to be inscribed.
(4) Material and workmanship
(a) General requirements of material and workmanship shall mean any material
or article either raw material or additives or finished are required to be
used in the manufacturing process of pipes.
(b) The material used for manufacturing of pipes should not constitute any
toxic hazards, should not support micro biological growth and should not
give rise to unpleasant test or odour, discolorations of water. The
Contractor shall have to produce a certificate fulfilling these effects from
the pipe manufacturer. Pipe manufacturer shall obtain certificate to
this effect from the manufacturer of raw material. Also a certification
from raw material manufacturer that the raw material meets the poly
vinyl chloride confirming to ISO4435-1991 &, IS:4985-2000 and its latest
revision amendments.
(c) The material from which the pipes are made shall consists substantially of
poly vinyl Chloride confirming to IS :10151-1982 to which may be added
only those additives that are absolutely needed to facilitate the manufacture
of the polymer and the production of sound durable pipe of good surface
finish, mechanical strength and opacity. All other quality parameters like
density, MFR, Carbon black contents and anti-oxidant used for
manufacturing of pipes shall be strictly as per IS :12235-2004 and its latest
revision/ amendments.
2.4 Technical Specification
2.4.1 Manufacture of UPVC pipes.
The General requirement relating to the manufacture of UPVC pipes shall be
confirming to IS: 4985 - 2000 and its latest revision /amendments.
(a) The dimension, material composition, tests etc shall be as per IS:12235 -
2004 and its latest revision/ amendments.
(b) UPVC pipes shall be marked with ISI certification mark.
(c) The pipe dimensions and tolerances shall be as per latest revisions and
amendments of IS 12235 -2004. (Part1)& IS
The following tests as per IS: 12235-2004 and it’s latest revision/amendments
will be carried out by the agency in the presence of representative of
S.S.N.N.L./PMC/TPI. Laboratory tests to be carried out at manufacturing unit of
pipes by CIPET/GIRDA/RITES and if required additional tests shall be
conducted as suggested by EIC after supply of pipes at site such random sample
of pipes collected from site shall be tested in CIPET/GIRDA/ RITES/SSNNL
Laboratory. The testing charges shall be borne by the Contractor
a. Dimensions (Inside and outside diameter, Wall thickness and Length of
pipe) as per Clause No. 7.0 of IS:4985-2000
b. Visual appearance as per Clause No. 10.1 of IS :4985-2000
c. Hydraulic Characteristics as per Clause No. 11.1 of IS:4985-2000
d. Reversion test as per Clause No. 10.4 of IS:4985-2000 e. Density
test as per Clause No. 10.6 of IS:4985-2000
f. Sulphate Ash Content 11% Max. as per Clause no. 10.7 of IS :4985-2000
g. Internal hydrostatic pressure in accordance with IS: 12235- 2004 (part-8),
pipe shall not burst during the prescribed test duration.
h. The PVC pipe shall not contain vinyl chloride monomer (VCM) exceeding
ppm when determined by means of gas phase chromatography using the
headspace method according to IS: 10151-1982.
i. The wall of the plain pipe shall not transmit more than 0.2% of visible
light falling on them when tested in accordance with IS:12235-2004 (part -
Sampling and Criteria for Conformity
The sampling procedure and the criteria for conformity shall be as per Annex D
of IS :4985 - 2000.The scale of sampling for visual and dimensional requirement
shall be as per Table No.13 of IS:4985 - 2000 or as directed by Engineer - In -
Charge. The sampling shall be made on random basis, from a lot
manufactured. The samples required for testing shall be taken as directed by
Engineer - In - Charge or his representative/PMC/TPI. When subjected to
internal hydrostatic pressure test in accordance with the procedure given in
IS:12235-2004 (Part 8) the pipe shall not fail during the prescribed test
duration. The temperatures and duration of test shall conform to the
requirements given in the table mentioned below. The tests shall be carried
out not earlier than 24 h after the pipes have been manufactured.
Requirements of Pipes for Internal Hydrostatic Pressure Test
Test Test Duration (Min.
Test Test Pressure
Temp. holding time)
Quality Test 60 1000 1.16xPN(MPa)
Acceptance 27 1 4.19xPN(MPa)
The pipes under test shall show no signs of localized swelling, seepage cracking,
leakage or weeping and shall not burst during the prescribed test period.
During execution if required the sampling of pipes shall be made from the
procured, tested and delivered lot of pipes at site randomly. The same shall
be tested for the tests mentioned in Para no. 2.4.2 above. The Contractor shall
have to borne all the cost of testing in such a case over and above the cost of
regular testing.
The type test shall be carried out as per IS:12235 - 2004 and its latest revision/
amendments. The type tests are intended to prove the suitability and
performance of a new composition, a new technique or a new size of a pipe.
Such tests, therefore, need be applied only when a change is made in Polymer
composition or method of manufacture, or when a new size of pipe is to be
introduced. Engineer- In-Charge or his representative/PMC/TPI may call for the
fresh samples for the type tests if required.
2.6 Laying of Pipes.
Excavation of pipe trench shall be carried out in accordance with
designed longitudinal section of sub minor.
2.6.1 Underground Installation of UPVC Pipe:
Generally, the width of the trench should be minimum dimension
compatible with safe working and the satisfactory laying, jointing and
bedding of pipe as per drawing or as directed by Engineer-In-Charge. The
depth of the trench will be @ 1.0m from ground level plus diameter of pipe or
as mentioned in the drawing or as directed by Engineer-In-Charge.
As excavation proceeds, all unstable trench walls need to be supported as per
requirement is mandatory for trenches of 1.00 m or deeper. The cost for this
is incorporated in the relevant item of excavation of pipe line and no extra
payment shall be made / entertained for this activity. Bed of the trench shall
be well dressed and shall be free from clods. If any stones or other objectionable
solid material met with during excavation of trench at bottom, it should be
removed and if required the bed should be leveled with selected soil
available from the excavation of the trench.
Preparation for pipe laying.
Pipes shall be joined to form a single long length above ground prior to staking
into the trench as per site situation or as directed by Engineer - In - Charge. To
prevent scratches on surface of pipe / damage to pipe of the road surface,
pipe rollers should be used.
Before commencing of pipe laying into the trench a check should be made for
deep cuts, scratches or other damages in the pipe and the fusion joint system
is sufficiently cooled.
The pipes shall be laid in proper line and level as per drawing or as directed
by Engineer - In - Charge. Gradual changes in direction of polyethylene can be
accommodated by pipe deflection but every effort should be made to keep the
pipe as central as possible within the trench to enable correct side fill
compaction. Similar care should be taken when any distortion of the coiled
pipe has occurred.
2.7 Jointing of pipes: (1) Preparing Joints.
The pipes shall be jointed by flush joint as instructed by the Engineer-In-Charge.
Caulking space shall be as per relevant IS code according to the diameter of the
pipes. The next pipe shall then to be pressed against the first so that the recess
the end of first pipe and that of the second properly fills with Synthetic ring and
both pipe shall have pressed against each other properly. The joints shall be
smooth finished. The Contractor shall have to make sufficient room for making
the joints leak proof at the bottom of joint by excavating the earth as per
requirement. But due care shall be required during the backfilling in that
portion. No extra payment shall be made for making sufficient room for the
jointing of pipes at bottom of joint.
2.8 Connections through walls of wells:
Pipe may have to go through Concrete walls of wells. In such a case, the pipe
should have a puddle flange welded around the pipe to ensure a leak proof
joint between the pipe and the masonary well wall. The cost of connection is
included in this item.
2.9 TESTING OF PIPE LINE
2.9.1 Inspection and test after erection
In addition to the progressive supervision and inspection by the Engineer in
charge or his representative/PMC/TPI, the Contractor shall offer for inspection
to Engineer-in-Charge or his representative/PMC/TPI, the complete erected or
its parts on which tests are to be carried out.
After such inspection by Engineer-in-charge or his representative/PMC/TPI,
t he Contractor shall have to carry out the testing for leakage/seepage from
pipe line /structures in the presence of Engineer-In-Charge or his
representative/PMC/TPI. All the structures shall be observed, checked and
tested for leakage and constructional defects.
(1) The length of pipeline to be tested shall be the length between well to
well or as directed by Engineer - In - Charge. Generally for sub-minor
the testing shall be carried out for full length at a time, if length of sub-
minor is less than 1.0 km and for more length of sub-minor the testing
shall be carried out in two stages as directed / decided by Engineer - In -
Charge. The Contractor shall have to make all the arrangement of water for
testing, labours, supervisory staff, etc. for the period of testing. The
necessary arrangement for plugging of opening in the wells (end well of
reach under testing) shall be made by the Contractor at his cost. After
testing Contractor shall have to remove the plugging at his cost, but care
should be taken that no damage will occur to the work executed. If any
damage will occur to any parts of work executed the same shall be
required to be repaired by the Contractor at his cost to the satisfaction of
Engineer - In - Charge.
(2) Backfilling of pipeline trenches can be done before the testing of pipe
(a) Initial Filling: The water shall be filled in the portion under testing
up to predetermined level and shall be continuously maintained at
predetermined level at predetermined locations(wells) for 48 hours.
The purpose of initial filling shall be to provide sufficient time/water
for absorption in the masonary structures (wells).
(b) Observation/Checking/Testing for Leakage:
The level of water surface shall be measured after 48 hours of initial
filling and thereafter at an interval of 24 hours for at-least 5(Five) days.
During the testing the joints of pipe line shall be observed and checked,
if any leakage found, the pipe shall be emptied out by the Contractor at
his cost and shall be rectified at his cost. The testing procedure shall be
repeated, till the rectification of the damages/defects/leakages is of the
acceptable engineering standard.
During the testing after initial filling the level of water surface in the
wells under consideration shall be measured. The difference in the
levels of the water surface after duration of 24 hours shall not be
more than 50 mm for a length up-to 1.0 Km. For more/less length the
tolerance limit of difference shall be arrived proportionately.
Work of UGPL sub-minors shall be inspected by PMC/Third Party
and payments shall be done after getting approval of PMC/Third
Party. Modalities of PMC/Third Party Inspection shall be
separately decided and given by SSNNL.
2.10 Rejection of the system or system components
If any leakage found during testing of pipe line, Contractor will have to
attend immediately and rectify at his cost within 5 (Five) days. If Contractor
fails to rectify the defect the entire length of pipe line between two adjacent
wells shall be rejected and not accepted. The payment shall not be made for
the rejected work. The difference in water level during testing shall be within
the tolerance limit as specified above, otherwise the work shall not be
accepted and paid. If any intermediate payment made to the Contractor
for portion under rejection, the same shall be recovered from the
outstanding dues of the Contractor
2.11 MONSOON DAMAGES
Damages due to rain or flood to UGPL and / or in foundation of structure
shall have to be made good by the Contractor till the work is finally
handed over to the SSNNL.
The responsibility of de-silting and making good the damages due to
rain or flood rests with the Contractor, throughout
the defect liability period of work and not only limited to earthwork. No extra
cost is payable for such operations to protect the work done during the
construction and the Contractor shall therefore have to take all necessary
precautions to protect the work done during the construction period. The
provision made in this Para shall be applicable to all the components of
the work under this contract up to defect liability period of the entire work.
The Contractor shall take all precautionary measures well prior to onset of
monsoon to prevent entry of flood water in UGPL and structures on it
from drains, nallas, river and other area. However, any damage done to
the work or silting or slush caused shall have to be attended by the
Contractor without any extra cost to SSNNL and no time limit sanction shall
be enter for the work.
During monsoon, the Contractor shall make available the machinery such as
pumps, excavators, dozers, rollers etc. and skilled and unskilled manpower
to attend the emergency conditions of flood inundation.
The cost for such operations shall not be paid separately and deemed to
be included in the rates quoted in respective Items of Schedule-B. The
Contractor shall take all necessary precautions to prevent the entry of
rain/flood water during monsoon in the pipe line and structures on it.
UPVC Tee (Preferably Moulded) & UPVC Bend (Preferably Moulded) under
4.14(a) &4.14(b) shall be as per IS:4985-2000 and UPVC Reducer (Moulded or
Fabricated), UPVC Tee (Moulded Fabricated) & UPVC 0-179 degree Bend
(Moulded or Fabricated) shall be from IS:4985-2000 conforming UPVC
material and shall be as per test pressure of 4 kg/cm2.
Rate shall be including loading, unloading, carting, insurance and labour charge
for installation, etc. complete.
All the Tee, Elbow, Bend and Reducer shall be true in line & level as per IS
code. The joint shall be water tight & no leakage shall be noticed during
Measurement and Payment (Item No 2,3 & 7)
Measurement and payment for Item Nos. 2 and 3 shall be made on the basis of actual
executed length in running metres (RM), whereas Item Nos. 7(a) to 7(d) shall be
measured and paid on a Nos. basis, in accordance with the Schedule of Quantities
(BOQ) and as certified by the Engineer-in-Charge.
Excavation for foundation in all sorts of soil including yellow sandy gravelly soils ,soft &
hard murrum etc. in dry condition including depositing the excavated stuff in uniform
layers in banks or as and where directed etc. complete for lead up to 500m and all lift.
Including dewatering.
3.1 SCOPE OF WORK
(a) The excavation for foundation of canal structures shall be done for all types of soil,
murrum etc. It shall be done according to the dimension and size shown on the
drawings. The foundation levels and size shown on the plans accompanying the tenders
are tentative and actual levels shall be decided by the Engineer-In-Charge on the basis of
construction stage drawing and actual site conditions revealed after opening of the
foundation. The Construction stage drawing will be provided stagewise and work shall
be carried out as directed by Engineer-In-Charge.
(b) The pay line quantities will be to the dimensions shown on the drawings. If the payline is
not shown on the drawing or there is discrepancy in drawing and Para 1.10.4, the
contents of Para 1.10.4 will govern. However the excavation shall be judged safe and all
loose material shall be removed prior to back filling and compaction. (c) The work to
be done under these specifications shall consists of de-silting/slush clearance of the
canal (UGPL sub-minor) trench excavated portion and structures partly or fully
constructed in whatever quantity and wherever required.
(c ) The recommended side slopes for pay lines are considered as quite safe and no shoring
and strutting is necessary. However, if necessity arises, the Contractor shall have to
provide shoring and strutting and the rate for excavation will be treated as inclusive of
such arrangements
(d) Wherever ground water met with during excavation for structures, dewatering shall be
resorted by the Contractor. The slush clearance and dewatering after monsoon for all
structures under this contract shall be resorted by the Contractor without any extra cost.
The rate for the excavation for structure i.e. (item No. S-1) includes the cost towards
dewatering and slush clearance. No extra claim for dewatering and slush clearance will be
entertained. “The provision made in this para shall be applicable to all the components of
works under this contract till completion of entire work”. (b) Below water table
3.2 APPLICABLE PUBLICATIONS
3.2.1 Indian Standards-
1 IS:1498-1970 Classification and
identification of soils for
general engineering
purposes (first revision)
(Amendments No.1 and 2)
2 IS:2720-1983 Methods of test for soils
(Part-I to X and Part-
3 IS:3764-1966 Safety code for excavation
(Amendment No. 1)
4 IS:4701-1982 Code of practice of
earthwork on canals
5 IS:7293-1974 Safety code for working
with construction
6 IS:1888 - 1982 Method of load test on
soils (Second revision)
7 IS: 5529 -1985 Test in overburden
(Part-I) (First Revision)
3.2.2 Other Publications:
1. USBR Earth manual (Second edition
1974-Reprinted 1985)
2 Central water commission Safety Manual
Note : 1) Generally the Bureau of Indian Standard Code will be followed for all
Items of works. Wherever this Code does not exist, the reference will be
taken to other technical specifications directed by Engineer-In-Charge.
2) Latest version of I. S. shall only be used.
3.3 CLASSIFICATION OF EXCAVATION
Except or otherwise provided in these specifications, excavation of
structure/Canal trenches shall be carried out as per excavation line
shown in the drawing or as directed by Engineer-In-Charge. Excavation
in all sorts of soil includes the dry, wet & slushy condition. Contractor
must assume all responsibility for deductions and conclusion as to the nature
of the materials to be excavated and the difficulties of making and maintaining
the required excavation.
3.3.1 Classification of the soil
Excavation for foundation in overburden, soil and murrum includes all excavation
to be done in strata other than soft and hard rock which covers excavation in all
kinds of soil such as brown soil, reddish soil, black soil, clay, sand, gravel and
murrum or mixtures of any of these soils. It shall also include removal of
boulders/ pebbles up to 0.028 m (1 cubic foot) in size and which are embedded
in soil and can be removed by pick bar and shovel without blasting.
3.3.2 Conveyance and disposal of excavated materials
(a) The usable excavated material available from the canal (UGPL sub-minor)
excavation shall be used in back filling. If such usable material is in excess of the
requirement of back filling, the same shall be deposited in the spoils as and where
directed by the Engineer-In-Charge.
(b) All suitable materials removed from excavation and in excess of the requirement
of canal (UGPL sub-minor) trench back filling shall be used in the construction of
approaches to the road bridges and backfill around structures up to 1 km. lead for
which no extra payment will be made. The remaining material from
excavation shall be used to be deposited in low areas to eliminate tripped
drainage or otherwise stacked in spoil banks in regular shape with suitable
slopes or spread in other approved locations as directed by the Engineer-In-
Charge, within a lead of 1 Km. Spoil banks shall not be constructed continuous. A
gap of 10 m shall be provided at 150 m interval. The maximum height of spoil
bank shall be restricted to 3.0 m with side slope 1.5:1.
(c) When the excavated material is required to be used for adjacent spoil bank, the
lead involved shall be measured along the center line of canal (UGPL sub-
minor) considering 15 m block as a unit and when the excavated material is
required to be used for other than approach road and spoil banks, the lead
involved shall be measured from the block of 15 m to the place of dumping as a
straight-line distance, i.e. shortest possible distance.
3.3.3 Dewatering in excavation
Surface or sub-soil water met with during canal (UGPL sub- minor) trench a n d
s t r u c t u r e excavation shall be diverted to nearby drain/ nalla by cutting
an open channel from trench. When the drain/ nalla bed is higher than the sub-
soil water level met with, the bailing out by suitable means of pumping shall be
resorted to for dewatering sub-soil water below the drain/ nalla bed level. In
case where topography of area is such that surface water is not possible to be
drained off by excavating the channel, the bailing out by suitable means of
pumping shall be resorted to and no separate payment shall be made for the
dewatering. No distinction shall be made as to whether the material being
excavated is dry, moist wet or slushy. The Contractor shall have to excavate the
canal (UGPL sub-minor) and structure in under water level conditions also i.e.
under wet/slushy condition after providing sufficient arrangement of dewatering.
The material excavated under water level condition which requires
intermediate stacking for drying shall have to rehandle. No extra payment for
efforts for drying out of soil, re-handling of dry soil, etc. shall be given. The
Contractor shall have to excavate the wet and saturated soils met with above
subsoil water level. (including capillary fringe) No payment for extra efforts for
excavation under this condition shall be made.
3.4 EXCAVATION FOR STRUCTURES:
(a) The excavation for foundation of structures shall be done for all types of soil,
murrum etc. It shall be done according to the dimension and size shown on the
drawings. The foundation levels and size shown on the plans accompanying the
tenders are tentative and actual levels shall be decided by the Engineer-In-
Charge o n the basis of construction stage drawing and actual site conditions
revealed after opening of the foundation. The construction stage drawing will be
provided stage wise and work shall be carried out as directed by Engineer-In-
(b) The excavation shall be judged safe and all loose material shall be removed prior
to back filling and compaction.
(c) The recommended side slopes are considered as quite safe and no shoring and
strutting is necessary. However, if necessity arises, the Contractor shall have to
provide shoring and strutting without any extra cost.
(d) The slush clearance and dewatering after monsoon for all structures under this
contract shall be resorted by the Contractor without any extra cost. The
excavation for structure & Pipe includes the cost towards dewatering and slush
clearance after monsoon. No extra claim for dewatering and slush clearance
will be entertained. The provision made in this Para shall be applicable to all the
components of works under this contract till completion of entire works.
3.4.2 Over Excavation
(a) Over excavation shall not be done beyond the defined pay line. Any such over
excavation in width shall have to be filled back with suitable soil and properly
compacted. Whereas over excavation in depth shall have to be filled with
directed by the Engineer-In-Charge. No extra claim for such over excavation,
filling and compaction of concrete/soil shall be entertained.
(b) The usable material obtained from the excavation for structures shall be
utilized for backfill and bridge approaches. Unusable material shall be disposed
off as directed by the Engineer-In-Charge.
All precautions shall be taken so that failure of slope does not occur but if any slip
occurs on account of nature of soil or due to failure of slopes in the opinion of the
Engineer-In-Charge, the extra excavation involved, shall be properly restored to
restore stability. In such a case no payment for necessary excavation and back-
filling will be made for this extra work under relevant items.
(a) The pipeline trenches shall be excavated as shown in the drawing. It is
expected that the sides of the trenches shall be vertical. However, the
contractor is advised to visit and assess the site conditions. No extra
payment shall be made, even if, the sides of the pipeline trenches are to
be kept with appropriate stable slopes.
(b) However, for the valve chambers, the slopes for the excavation shall be
considered as Pay line Slope for the Excavation for the Structures.
Sr. No. Strata of Excavation Slope for pay line
1 Soil, S.M, H.M. 1:1
2 Soft Rock 0.50 :
3 Hard Rock 0.25 :
(c) In case of UGPL total width of trench shall be as per the detailed given
in respective drawings. Extra excavation shall be done where
compaction is specified by pneumatic tampers at designed foundation
level shown on the drawings or the actual foundation level approved
and provided during excavation in case of structure pay line shall be
considered from actual foundation level, with slopes as per designed
foundation level or actual foundation level, whichever is lower.
However no extra payment shall be paid for the over excavation made
for the pipe line trench width as indicated in the respective drawings.
(d) Over excavation performed by the contractor for any purpose or
reasons, except for additional excavation as stated herein above or as
may be directed by the Engineer-In-Charge shall be rectified at the cost
of the contractor. Filling and compactions for such over excavation shall
also be done at the cost of the contractor.
(e) Lead specified for excavation shall be measured from the block of
m. of the foundation to the place of dumping as a straight line distance
i.e. the crow fly distance.
Measurement & Payment (Item -4)
(f) All items of excavation shall be measured and paid on cubic meter basis.
The quantity of excavation shall be computed from the L x B x D which
shall be taken as 3 m. grid points or closer interval in the foundation
area, at every change in strata like soil, soft rock etc. L x B x D shall be
taken and recorded. No payment shall be entertained for any excavation
beyond pay line. The rate shall include providing all the materials, tools,
plants and labour required for excavation.
(g) No extra rate shall be payable for excavation below design depth shown
on the drawings. No claim for extra rate shall be entertained for any
excavation that may be required to be done for widening or deepening
the foundations consequent upon lowering foundation below the level
shown on the drawings. The works so done will be paid at the tendered
rates of the item.
(h) The regradation for tail channel and approach for structures and
diversion of drains/nalls shall be according to the dimension and / or as
instructed by the Engineer-In-Charge.
(i) The rate of excavation includes the excavation processes, prescribed
lead and lifts, disposal of excavated stuff as stipulated in the
specifications, providing all tools, plant, machinery, labour and material,
preparation and maintenance of haul roads, transport of excavated
material to temporary stockpiles, rehandling of excavated material
temporarily deposited in stockpiles to disposal areas or the points of
final use, disposal of excavated waste materials, maintaining excavated
slopes and trenches including dewatering, if any etc. The cost of sorting
and stacking the useful excavated material above high flood levels will
not be paid extra and shall be deemed to have been included in the unit
rate of completed items of excavation.
(j) The rate also includes cost of all incidental operations required for
carrying out the work in accordance with the specifications.
(k) The measurement of item 4 shall be taken in cubic meter basis and
payment shall be made for the unit rate quoted in Bill of quantity.
Backfilling the foundation trenches around the structures etc with selected
excavated stuff including watering, ramming, compacting etc. complete. (By
(a) The type of material used for back-fill and the manner of depositing the
material shall be subject to approval of Engineer-In-Charge. As far as
practicable back fill material shall be obtained from the excavation for
structure or from adjacent canal excavation, or from excavation of other
ancillary works.
(b) Materials for the purpose shall be of approved quality. Any material which is
found inferior shall be rejected and the contractor shall remove such rejected
material from the site at his own cost. The material shall be collected on the
canal site approved by Engineer-In-Charge. The material shall be granular i.e.
sand and gravel in proportion 1:1. The material shall got approved from the
Engineer-In- Charge prior to collection, it shall be free from all rubbish, dust
and any organic materials as well as clods of black cotton soils.
(c) Backfill material shall contain no stones larger than 7.5 cm. size.
(d) The backfill material shall be placed to the line and grades as shown on
drawing or as prescribed in its paragraph or as directed by the Engineer-In-
(e) Backfill shall not be placed against retaining walls until the retaining wall is
cured adequately and is strong enough to take lateral pressure of the backfill.
Trimming of the sides of excavation against which the backfill is to be laid shall
be delayed until immediately prior to backfilling and any excessive drying of
the surface shall be conditioned properly and made adequately moist to avoid
potential desiccation of the rock or partly compacted/consolidated materials.
(f) The backfill material shall be placed carefully and spread in uniform layers of
not more than 15 cm thickness. The backfill shall be brought up as uniformly as
practicable on both sides of walls and all sides of structures to prevent unequal
loading. The backfill material shall be placed at about the same elevation on
both sides of the pipe portions of the structures and culverts and difference in
elevation shall not exceed 15 cm. at any time. The contractor shall be
responsible for providing adequate earth cover above pipe to prevent damage
due to loads of construction equipments.
(g) If a haul is built over a pipe, all backfill around and over the pipe shall be placed
to uniform surface and no humps or depressions shall be permitted at the pipe
(h) Backfill placement and compaction around structures shall be restricted until
the structure is complete.
(i) Backfill placement and compaction above the lining key shall be done as per
drawings on completion of lining key.
(j) Compaction around the structure and over the lining key shall be done by
pneumatic rammers in thin layers.
(k) In cases, the barrels of canal syphon, drainage syphon, super passage,
foundations of cross regulator and other structures are proposed on the
natural ground or its approaches are proposed on the compacted backfill made
up ground the soil of natural ground and the embankment on which the barrel
syphon, foundations and other components of structure rests shall be prepared
as per canal embankment. There after the actual barrel or other concrete
masonry structure work shall be started as per instructions of the Engineer-In-
Charge. The embankment work shall be carried out with all precautions
necessary from safety requirement and as per the method specified in the
normal embankment technique.
Compaction of Backfilling :
When compacting the soil against steep rock, abutment walls of masonry or concrete
structures, the construction surface of embankment shall be sloped away from the
rock or masonry or concrete structure leaving a minimum distance of 0.6 metre and
at an inclination of 3:1. Rollers shall not be used close to structures as structural
damage is very likely more particularly when structures have not been fully cured.
The size and weight of equipment will depend on nature of material, the height and
load assumed in design of structure. The backfill close to the structure up to the
rolled layer shall be compacted in suitable uniform layers, using, pneumatic/hand
tampers as appropriate for dry density of at least 90% of Standard Proctor. The
moisture content of the earth fill placed against the rock or the structure shall be on
higher side on OMC by about 2% or so, to allow it to be compacted in to all
irregularities of the rock, profused watering shall be done to pervious materials
(sand) before compaction as per instruction of the Engineer-In-Charge. Compaction
at junction of earthwork and backfill around the structure shall be carried out with
special care without claiming any extra cost.
Measurement & Payment (Item 5)
(a) All items of excavation shall be measured and paid on cubic meter basis. The
quantity of excavation shall be computed from the L x B x D which shall be
taken as 3 m. grid points or closer interval in the foundation area, at every
change in strata like soil, soft rock etc. L x B x D shall be taken and recorded. No
payment shall be entertained for any excavation beyond pay line. The rate shall
include providing all the materials, tools, plants and labour required for
(b) No extra rate shall be payable for excavation below design depth shown on the
drawings. No claim for extra rate shall be entertained for any excavation that
may be required to be done for widening or deepening the foundations
consequent upon lowering foundation below the level shown on the drawings.
The works so done will be paid at the tendered rates of the item.
(c) The regradation for tail channel and approach for structures and diversion of
drains/nalls shall be according to the dimension and / or as instructed by the
Engineer-In-Charge.
(d) The rate of excavation includes the excavation processes, prescribed lead and
lifts, disposal of excavated stuff as stipulated in the specifications, providing all
tools, plant, machinery, labour and material, preparation and maintenance of
haul roads, transport of excavated material to temporary stockpiles, rehandling
of excavated material temporarily deposited in stockpiles to disposal areas or
the points of final use, di6sposal of excavated waste materials, maintaining
excavated slopes and trenches including dewatering, if any etc. The cost of
sorting and stacking the useful excavated material above high flood levels will
not be paid extra and shall be deemed to have been included in the unit rate of
completed items of excavation.
(e) The rate also includes cost of all incidental operations required for carrying out
the work in accordance with the specifications.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
TENDER DOCUMENT.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .