Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.9 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹2.9 L+₹58 (0.02%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance Others-Work restricted to residents of Concerned Panchayat |
Tender Value
₹2.9 L
EMD Value
₹5,800
Closing Date
24 Jul 2026, 6:00 pmClosed
Executive Engineer Rew Baramulla
REW BARAMULLA
Construction of Culvert With Retaning Wall near Shiv Mandir Dhobiwan under ADP(PRI) for year 2026-27, Panchyat Halqa Dobiwan, Block Lalpora()
2026_RDPR_315399_17
e- NIT No. 93/Xen/Rew/Bla/2026-27 Dated 10-07-2026
Open Tender
Civil Works
Percentage
30 days
Baramulla
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Executive Engineer REW Baramulla
₹5,800
27 Jul 2026
10 Jul 2026
25 Jul 2026
10 Jul 2026
24 Jul 2026
10 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mech means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 min width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including d:all kinds of soil | 27.9 | cum | - | - |
| 2 | Dewatering of trenches and diversion of nallah | 2 | no | - | - |
| 3 | Supplying and laying of stone soling hand packed tightly incl ramming watering and filling of interstices incl all carraiges | 1.31 | cum | - | - |
| 4 | Providing and laying in position plain cement concrete 1:4:8 mix ratio M7.5 using 20 mm nominal size agg excluding cost of shuttering i/c curing( all works upto lintel level) | 1.31 | cum | - | - |
| 5 | Providing and laying in position plain cement concrete 1:2:4mix ratio M15 using 20 mm nominal size agg excluding cost of shuttering i/c curing( all works upto lintel level) | 14.75 | cum | - | - |
| 6 | Providing and laying in position specified grade of reinforced cement concrete M-20 grade including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All
works upto plinth level . | 4.8 | cum | - | - |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level (Mild steel and medium tensile steel bars) | 560 | kg | - | - |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for (I) Foundations | 74 | sqm | - | - |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for suspended floor | 14.13 | sqm | - | - |
| 10 | P/F of steel railing over wheel gaurds in structural steel including 2 coats of steel primer | 80 | kg | 1 | ₹79.92 |
stage.html
html • 0.02 MB
finance_1023322.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.14 MB
BOQ_1023322.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .