Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.4 LAccepted-AOC BANIKHET NAVEEN KUMAR BANIKHET CHAMBA HIMACHAL PRADESH 176303 | CHAMBA | HIMACHAL PRADESH | 176303 | ₹2.4 L Quoted ₹2.5 L | 1 | Accepted-AOC Accept |
| 2 | 2₹2.5 L+₹1,994 (0.79%)Rejected-AOC | ₹2.5 L+₹1,994 (0.79%) | 2 | Rejected-AOC Reject |
| 3 | 3₹2.6 L+₹6,964 (2.76%)Rejected-AOC | ₹2.6 L+₹6,964 (2.76%) | 3 | Rejected-AOC Reject |
| Sl No | Description | Qty | Unit | UDEY KUMAR L2 | Jagdish Chand L3 | Naveen Kumar L1 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundation, trenches etc. in earth work, lift up to 1.50 meters stacking the excavated soil not more than 3 meter clear from the edge of excavation and the rreturning the stacked soil in 15 cm layer, when required into plinth sides of foundation etc. consolidating eache deposit layer by ramming and watering and disposing of all surplus excavated earth as directed with in a lead of 20 meters as per direction and to the entire satisfaction of Engineer- in- charge up to leads and lifts. | 9 | Cum | 652 ₹5,868 | 659 ₹5,931 | 648 ₹5,832 Lowest |
| 2.00Providing and laying cement concrete 1:4:8 (1 cement: 4 sand: 8 graded crushed stone agg. 40mm nominal size) and curing complete excluding cost of form work in foundation and plinth as per direction and to the entire satisfaction of Engineer-in-Charge. | ||||||
| 2.01 | Foundation and plinth in all leads and lifts as per direction and to the entire satisfaction of Engineer-in-charge. | 1.35 | Cum | 6,350 ₹8,572.5 | 6,359 ₹8,584.65 | 6,340 ₹8,559 Lowest |
| 3.00Providing form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm so as to give a fair finish including centring, shuttering strutting and propping etc. with wooden batten and ballies, in all heights of propping and centring below supporting floor to ceiling not exceeding 4 mtrs and removal of the same for insitu-reinforced concrete and plain concrete work in :- | ||||||
| 3.01 | Vertical surfaces such as wall (any thickness) partitions and the like including attached pillasters, buttresses plinth and string courses and the like in all leads and lifts as per direction and to the entire satisfaction of Engineer-in-charge. | 78 | Sqmt | 420 ₹32,760 | 430 ₹33,540 | 415 ₹32,370 Lowest |
| 4.00Providing and laying cement concrete 1:2:4 (1 Cement : 2 Sand :4 graded stone aggregate 20mm nominal size) and curing complete excluding cost of form work and reinforcement for reinforced concrete work in : | ||||||
| 4.01 | Foundation and plinth in all leads and lifts as per direction and to the entire satisfaction of Engineer-in-charge. | 19.5 | Cum | 7,580 ₹1,47,810 | 7,590 ₹1,48,005 | 7,562 ₹1,47,459 Lowest |
| 5.00 | Providing laying of Tor steel reinforcement for RCC work including bending binding and placing in position including wire upto all floor level as per direction and to the entire satisfaction of Engineer-in-Charge. | 390 | Kg | 100 ₹39,000 | 110 ₹42,900 | 97 ₹37,830 Lowest |
| 6.00 | Steel work welded in builtup section, trusses and framed work including cutting, hoisting, fixing in position and applying a priming coat of red lead painting in beam, joists, channels, angles, tees, flats with connection plate or angle cleats as in main and cross beams hip and jack rafters purlins connected to common rafters and the like within all leads and lifts. | 2 | Qtl. | 10,200 ₹20,400 | 10,210 ₹20,420 | 10,183 ₹20,366 Lowest |
Tender Value
₹2.5 L
EMD Value
₹5,050
Closing Date
19 Dec 2025, 5:00 pmClosed
Executive Engineer
JS Division Dharampur Bharari
Restoration of rain damages to LIS Sidhpur II in Sidhpur Tehsil Dharampur Distt. Mandi HP
2025_HPIPH_123152_1
10566-10616 Dated 10-12-2025
Open Tender
Civil Works
Item Rate
90 days
Dharampur
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
Executive Engineer
₹5,050
Yes
8 May 2026
10 Dec 2025
20 Dec 2025
10 Dec 2025
19 Dec 2025
10 Dec 2025
Excavation in foundation, trenches etc. in earth work, lift up to 1.50 meters stacking the excavated soil not more than 3 meter clear from the edge of excavation and the rreturning the stacked soil in 15 cm layer, when required into plinth sides of foundation etc. consolidating eache deposit layer by ramming and watering and disposing of all surplus excavated earth as directed with in a lead of 20 meters as per direction and to the entire satisfaction of Engineer- in- charge up to leads and lifts.
Foundation and plinth in all leads and lifts as per direction and to the entire satisfaction of Engineer-in-charge.
Vertical surfaces such as wall (any thickness) partitions and the like including attached pillasters, buttresses plinth and string courses and the like in all leads and lifts as per direction and to the entire satisfaction of Engineer-in-charge.
Foundation and plinth in all leads and lifts as per direction and to the entire satisfaction of Engineer-in-charge.
Providing laying of Tor steel reinforcement for RCC work including bending binding and placing in position including wire upto all floor level as per direction and to the entire satisfaction of Engineer-in-Charge.
Steel work welded in builtup section, trusses and framed work including cutting, hoisting, fixing in position and applying a priming coat of red lead painting in beam, joists, channels, angles, tees, flats with connection plate or angle cleats as in main and cross beams hip and jack rafters purlins connected to common rafters and the like within all leads and lifts.
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.61 MB
Form6.pdf
Tender Documents • 0.81 MB
Form8.pdf
Tender Documents • 1.28 MB
TC.pdf
Tender Documents • 0.14 MB
BOQ_180929.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .