| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.2 LAccepted-AOC | L1 | Accepted-AOC KSEBL decided to award the work to the single bidder |
Tender Value
₹10.6 L
EMD Value
₹26,400
Closing Date
1 Sept 2022, 10:30 amClosed
Chief Engineer Civil- DS and DRIP
O/o the Chief Engineer, Dam safety organisation, Pallom, Kottayam
DRIP II - SGHEP- Construction of Box culvert in the access road to control shaft of Pamba Dam
2022_KSEB_498529_1
KL KSEB DRIPII//W1/PBA-BC/CE-7/2022-23
Open Tender
Civil Works - Others
Item Rate
270 days
Kochu pamba
Refer tender document
6 documents required · 6 mandatory
₹5,900
₹26,400
Yes
22 Mar 2023
14 Jul 2022
1 Sept 2022
14 Jul 2022
1 Sept 2022
15 Jul 2022
15 Jul 2022 - 17 Aug 2022
Amount
Box culvert
od100731/2022_2023 : Demolishing the existing wooden blocks of bridge by mechanical means including stacking of serviceable items if any and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.
15.17.1 : Dismantling steel work in single sections including dismembering and stacking within 50 metes lead in:R.S. Joists
2.32 : Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.
2.1.1 : Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed:All Kinds of soil
4.1.3 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
5.9.2 : Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
od107598/2022_2023 : Drilling holes for providing anchor /dowel bars varying in depth and diameter in rock or concrete and cleaning the holes, grouting with cement grout (CM 1:2) after fixing anchor/ dowel bars including cost of all materials, labour etc. complete as per specification and drawings,excluding cost of steel reinforcement
5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
od106699/2022_2023 : Reinforced cement concrete work using M30, MSA 20 in walls , slabs etc of box culvert (any thickness), excluding cost of centering, shuttering, finishing and reinforcement :
5.1.2 : Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
60.7.4 : DR PACKING FOR APRONS - Rough stone dry packing for apron with good quality blasted rubble including packing to compactness to lines levels, cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
13.1.1 : 12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
13.43.1 : Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface:Water thinnable cement primer
13.60.1 : Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade:Two or more coats on new work
Bidder Name
M V Balakrishnan
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_716061.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .