| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹2.9 CrAccepted-Finance | ₹2.9 Cr | L-1 | Accepted-Finance PRICE QUOTED LOW |
| 2 | L-2₹3.2 Cr+₹30.8 L (10.8%)Rejected-Finance 1 1 PUNJABI COLONY VIKASNAGAR | ₹3.2 Cr+₹30.8 L (10.8%) | L-2 | Rejected-Finance PRICE QUOTED HIGH |
| 3 | L-3₹3.3 Cr+₹42.9 L (15.0%)Rejected-Finance K BLOCK 202 AAROGYAM RESIDENTS WALFARE ASSOCIATION OPP CRYSTAL WORLD N H 58 P O PATANJALI YOGPEETH HARIDWAR | ₹3.3 Cr+₹42.9 L (15.0%) | L-3 | Rejected-Finance PRICE QUOTED HIGH |
Tender Value
₹7.9 Cr
EMD Value
₹15.7 L
Closing Date
29 Oct 2020, 6:55 pmClosed
SE IRRIGATION WORKS CIRCLE HARIDWAR
OFFICE OF SUPERINTENDING ENGINEER IRRIGATION WORKS CIRCLE HARIDWAR
Repairing work of MS angle, MS chain, Hook, Tile/Stone, Railing etc of existing ghats in Har-Ki-Pauri area under Mahakumbh Mela-2021 (Ghats from Bhagirathi point to Mayapur regulator)
2020_IRDCE_26834_1
05/SE/2020-21
Open Tender
Civil Works
Item Rate
45 days
DISTRICT HARIDWAR
AS PER STANDARD BIDDING DOCUMENT
3 documents required · 3 mandatory
₹5,900
EXECUTIVE ENGINEER IRRIGATION DIVISION HARIDWAR
₹15.7 L
IRRIGATION WORKS CIRCLE HARIDWAR
10 Feb 2021
16 Oct 2020
30 Oct 2020
16 Oct 2020
29 Oct 2020
17 Oct 2020
17 Oct 2020
Amount
Excavation for Structures Earthwork in excavation for foundation of structures upto 3 m depth as per drawing and technical specification of shoring and bracing, removal of stumps and other deleterious matte.
Excavation in soil with Dozer with lead up to 100m. Making bund
Dewatering form foundation of abutements and wing walls including supply of all material, labour and T&P etc. required for proper completion of the work.
Removal of unsuitable Soil with Disposal removal of unsuitable soil including exacavation, loading & disposal upto 1000m lead but excluding ompaction ground supporting embankment subgrade replacement by suitable soil which shall be paid seprately as per clause 303.5.2 as per Technical specification Clause 302.3.11.
Provinding & laying of empty cement Bags with local sand and soil.
40 mm thick fine dressed stone flooring over 20 mm (average) thick base of cement mortar 1:5 (1 cement : 5 coarse sand), including pointing with cement mortar 1:2 (1 cement : 2 stone dust) with an admixture of pigment to match the shade of stone. Red sand stone
S/Fixing M.S. chain of 10mm dia bar with 30mm dia ring
Supply & Fixing M.S. Angle Iron (100x100x8)mm and 2.50 Long @ 2.50 Mtr. Interval with base plate 8mm thick including all cost of material labour T&P etc complete
Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 (For height upto 5 m) Nominal mix (1:2:4)
Supply & fixing GI pipe 50mm dia i/c all cost of material labour T&P etc complete
Supply & fixing hook 12mm dia bar i/c all cost of material labour T&P etc complete
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202. Cement Concrete
Engaging of tractor Trolly I/C wages of driver and cost of fuel
Engaging of unskilled labour and beldar
Chequerred precast cement concrete tiles 22 mm thick in footpath & courtyard jointed with neat cement slurry mixed with pigment to match the shade of tiles including rubbing and cleaning etc. complete on 20 mm thick bed of cement mortar 1:4 (1 cement: 4 coarse sand). Light shade pigment using white cement
Brick masonry work in cement mortar in substructure complete excepting pointing and plastering, as per drawing and technical specification Clauses 602, 603, 604, In 1:4 Cement mortar 1202 & 1204
Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204
Kota stone slab flooring over 20 mm (average) thick base laid over and jointed with grey cement slurry mixed with pigment to match the shade of the slab, including rubbing and polishing complete with base of cement mortar 1 : 4 (1 cement : 4 coarse sand) : 25 mm thick
Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302 Stone/Boulder
Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 P.C.C grade M 10 Nominal mix 1:3:6
Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete
Marble stone flooring with 18 mm thick marble stone, as per sample of marble approved by Engineer-in-charge, over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with grey cement slurry, including rubbing and polishing complete with : Raj Nagar plain
Scraping Plaster in Lime or Cement Mortar from Brick / Stone Masonry as per Technical Specification Clause 202.
Steel work welded in built up section/framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using steel etc. as required
M/s Construction Gallery
SUSHEEL CONSTRUCTION
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .