Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | H7₹3.1 L−₹78,493.20 (20.4%)Accepted-AOC VILLAGE GUHAR MAJHWAR P O UPPER BHAMBLA TEHSIL BALDWARA DISTT MANDI H P | MANDI | HIMACHAL PRADESH | 175001 | H7 | Accepted-AOC Lowest One | |
| 2 | H1₹3.8 LRejected-AOC | H1 | Rejected-AOC Not Lowest One | |
| 3 | H2₹3.4 L−₹45,463.75 (11.8%)Rejected-AOC HIMACHAL PRADESH HP | LAHUL AND SPITI | HIMACHAL PRADESH | 175133 | H2 | Rejected-AOC Not Lowest One | |
| 4 | H3₹3.3 L−₹56,829 (14.8%)Rejected-AOC | H3 | Rejected-AOC Not Lowest One | |
| 5 | H4₹3.1 L−₹69,718.90 (18.1%)Rejected-AOC | H4 | Rejected-AOC Not Lowest One |
| Sl No | Description | Qty | Unit | Reena Kumari H4 | Jai Singh Contractor and Suppliers H7 | Asheesh Thakur H3 | Raj Kumari H6 | Ashwani kumar H5 | Vidya Sagar H1 | Rajender Kumar H2 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundation and trenches etc. in earth work in all kinds of soil such as pick work, jumper work, blasting soft or hard rock or by chiselling soft or hard rock where blasting is prohibited in all leads and lifts including trimming / dressing of sides and bed, stacking the excavated soil clear from the edge of excavation and returning the excavated soil after completion of work in 15cm layers when required into plinth, sides of foundation etc. consolidating each deposited layers by ramming and watering and then disposing of all surplus excavated soil as per satisfaction and direction of Engineer-in- charge. | 12.66 | Cum | 360 ₹4,557.6 | 350 ₹4,431 | 310 ₹3,924.6 Lowest | 400 ₹5,064 | 350 ₹4,431 | 370 ₹4,684.2 | 720 ₹9,115.2 |
| 2.00Providing form work with steel plates of 3.15 mm thick welded with angle iron in frames 30x30x5 mm so as to give a fair finish including centring , shuttering, strutting and propping etc. with wooden battens and ballies, height of propping and centering below supporting floor to ceiling not exceeding 4 meters and removal of the same for-in-situ reinforced concrete and plain concrete work in:- | ||||||||||
| 2.01 | Vertical surface such as wall ( any thickness) partion and the like including attached pilaster, butresses, plinth and string courses and the like with in all leads and lifts as per the direction of Engineer-in-Charge. | 51.11 | Sqm | 320 ₹16,355.2 | 300 ₹15,333 Lowest | 360 ₹18,399.6 | 300 ₹15,333 Lowest | 368 ₹18,808.48 | 440 ₹22,488.4 | 380 ₹19,421.8 |
| 3.00 | Providing and laying cement concrete work 1:5:10( 1 cement :5 sand :10 graded stone agg. 40mm nominal size) and curing complete excluding cost of form work in foundation and plinth. | 26.44 | Cum | 6,100 ₹1,61,284 | 5,900 ₹1,55,996 Lowest | 7,150 ₹1,89,046 | 6,200 ₹1,63,928 | 6,799 ₹1,79,765.56 | 8,090 ₹2,13,899.6 | 6,980 ₹1,84,551.2 |
| 4.00 | Boulder filling behind retaining wall as per direction and to the entire satisfaction of Engineer-in-Charge. | 5.15 | Cum | 2,250 ₹11,587.5 | 2,200 ₹11,330 | 2,400 ₹12,360 | 2,100 ₹10,815 Lowest | 2,174 ₹11,196.1 | 2,740 ₹14,111 | 2,375 ₹12,231.25 |
| 5.00 | Providing and laying 40mm thick with cement concrete flooring 1:2:4. | 208 | Sqm | 580 ₹1,20,640 | 570 ₹1,18,560 | 498 ₹1,03,584 | 560 ₹1,16,480 | 469 ₹97,552 Lowest | 620 ₹1,28,960 | 545 ₹1,13,360 |
Tender Value
₹3.9 L
EMD Value
₹7,971
Closing Date
21 Aug 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer JS Division Sarkaghat
Executive Engineer JS Division Sarkaghat
Retaining wall to protect the pump house and Sump well at Badon RD 0 to 11.20
2026_HPIPH_141087_1
5656-5700 dt. 12.08.2026
Open Tender
Civil Works
Item Rate
90 days
Baldwara
Please refer Tender documents.
7 documents required · 7 mandatory
₹350
Executive Engineer JS Division Sarkaghat
₹7,971
30 Oct 2026
12 Aug 2026
22 Aug 2026
12 Aug 2026
21 Aug 2026
12 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation and trenches etc. in earth work in all kinds of soil such as pick work, jumper work, blasting soft or hard rock or by chiselling soft or hard rock where blasting is prohibited in all leads and lifts including trimming / dressing of sides and bed, stacking the excavated soil clear from the edge of excavation and returning the excavated soil after completion of work in 15cm layers when required into plinth, sides of foundation etc. consolidating each deposited layers by ramming and watering and then disposing of all surplus excavated soil as per satisfaction and direction of Engineer-in- charge. | 12.66 | Cum | - | - |
| 2Providing form work with steel plates of 3.15 mm thick welded with angle iron in frames 30x30x5 mm so as to give a fair finish including centring , shuttering, strutting and propping etc. with wooden battens and ballies, height of propping and centering below supporting floor to ceiling not exceeding 4 meters and removal of the same for-in-situ reinforced concrete and plain concrete work in:- | |||||
| 2.01 | Vertical surface such as wall ( any thickness) partion and the like including attached pilaster, butresses, plinth and string courses and the like with in all leads and lifts as per the direction of Engineer-in-Charge. | 51.11 | Sqm | - | - |
| 3 | Providing and laying cement concrete work 1:5:10( 1 cement :5 sand :10 graded stone agg. 40mm nominal size) and curing complete excluding cost of form work in foundation and plinth. | 26.44 | Cum | - | - |
| 4 | Boulder filling behind retaining wall as per direction and to the entire satisfaction of Engineer-in-Charge. | 5.15 | Cum | - | - |
| 5 | Providing and laying 40mm thick with cement concrete flooring 1:2:4. | 208 | Sqm | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.47 MB
BOQ_209418.xls
BOQ • 0.34 MB
form6.pdf
Tender Documents • 0.53 MB
form8.pdf
Tender Documents • 1.49 MB
conditions.pdf
Tender Documents • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .