Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹3.4 L
Closing Date
22 Oct 2026, 4:00 pm2d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
SE ICC MAHOBA
OFFICE OF THE SE ICC BAZARIYA MAHOBA
Construction of Meeting Hall in campus of Birma Inspection House, Mahoba
2026_UPIDC_1196507_1
03/SE/2026-27
Open Tender
Civil Works
Item Rate
270 days
MAHOBA
As per Nit and Tender Document
2 documents required · 2 mandatory
₹4,738
₹3.4 L
15 Oct 2026
15 Oct 2026
22 Oct 2026
15 Oct 2026
22 Oct 2026
15 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation in Mar, Rankar and Kabar mixed soils with lead up to 30m. and initial lift up to 1.5m. Including proper disposal of excavated earth all completion of work as per direction of Engineer-in-charge. | 249.56 | CUM | - | - |
| 2 | Earth work in filling in Mar, Kabar, Ranker and Kanker mixed soil with all lead & lift including manual compaction, dressing & making profile required for proper completion of work as per direction of Engineer-in-charge. | 2,071.2 | CUM | - | - |
| 3 | Providing & Laying Sand including all cost of material, labour, T&P etc. required for proper completion of work as per direction of Engineer-in-charge. | 39.25 | CUM | - | - |
| 4 | Providing and laying 1:4:8 cement concrete including cost of all material, labour and T&P required for proper completion of work as per direction of Engineer-in-charge. | 52.97 | CUM | - | - |
| 5 | Diluting and injecting chemical emulsion for POST-CONSTRUCTIONAL anti-termite treatment (excluding the cost of chemical emulsion) of soil under existing floors using chemical emulsion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1 :2 (1 cement : 2 Coarse sand) to match the existing floor with Chlorpyriphos/Lindane E.C. 20% with 1% concentration. | 261.6 | SQM | - | - |
| 6 | Ist Class Brick work (1:5)CM including cost of all material, labour and T&P etc. required for proper completion of work as per direction of Engineer-in-charge. | 175.46 | CUM | - | - |
| 7 | Ist Class Brick work (1:4)CM including cost of all material, labour and T&P etc. required for proper completion of work as per direction of Engineer-in-charge. (Super Structure) | 12.05 | Cum | - | - |
| 8 | Centering & Shuttering for R.C.C./C.C. work including material, labour and T&P etc. required for proper completion of work as per direction of Engineer-in-charge. | 1,194.64 | Sqm. | - | - |
| 9 | Laying C.C. 1:2:4 with cement 6.10 bag, Sand & 10-20mm stone grite including cost of all materials and labour, T&P etc. required for proper completion of work as per direction of Engineer-in-charge. | 40.67 | CUM | - | - |
| 10 | Providing & Laying M-25 (Design mix) with cement 7.90 bag, Sand & stone grit 10-20mm size including cost of all materials and labour, T&P required for proper completion of work as per direction of Engineer-in-charge. | 230.8 | CUM | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.79 MB
BOQ_2260503.xls
BOQ • 0.42 MB
birmafindtd.pdf
Tender Documents • 8.09 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .