Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.3 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹3.4 L+₹9,582.71 (2.91%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | Rejected-Technical | - | Rejected-Technical L3 | |
| 4 | Rejected-Technical | - | Rejected-Technical L4 |
| Sl No | Description | Qty | Unit | AJU K A L3 | POOVATHUMMOOTTIL CONSTRUCTIONS L2 | BIJU MATHEW L4 | HAREESH M P L1 |
|---|---|---|---|---|---|---|---|
| 1.00Toilet construction | |||||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 5.63 | cum | 351.8 ₹1,979.93 | 343.89 ₹1,935.41 | 346.77 ₹1,951.62 | 334.18 ₹1,880.77 Lowest |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 1.19 | cum | 7,758.37 ₹9,216.94 | 7,583.84 ₹9,009.6 | 7,647.31 ₹9,085 | 7,369.65 ₹8,755.14 Lowest |
| 1.00 | OD262875/2025-2026:
DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 3.71 | cum | 3,905.6 ₹14,489.78 | 3,817.75 ₹14,163.85 | 3,849.7 ₹14,282.39 | 3,709.92 ₹13,763.8 Lowest |
| 1.00 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 2.66 | cum | 8,159.93 ₹21,738.05 | 7,976.38 ₹21,249.08 | 8,043.12 ₹21,426.87 | 7,751.1 ₹20,648.93 Lowest |
| 1.00 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.67 | cum | 10,258.01 ₹6,842.09 | 10,027.26 ₹6,688.18 | 10,111.17 ₹6,744.15 | 9,744.07 ₹6,499.29 Lowest |
| 1.01 | 5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 1.76 | cum | 13,146.41 ₹23,150.83 | 12,850.69 ₹22,630.07 | 12,958.22 ₹22,819.43 | 12,487.75 ₹21,990.93 Lowest |
| 1.01 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 14.28 | sqm | 940.09 ₹13,424.49 | 918.95 ₹13,122.61 | 926.64 ₹13,232.42 | 892.99 ₹12,751.9 Lowest |
| 1.01 | 5.9.16.1:Centering and shuttering including strutting, etc. and removal of form for:
Edges of slabs and breaks in floors and wallsUnder 20 cm wide | 13.3 | metre | 223.11 ₹2,967.36 | 218.09 ₹2,900.6 | 735.42 ₹9,781.09 | 211.93 ₹2,818.67 Lowest |
| 1.01 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 8.87 | sqm | 746.09 ₹6,617.82 | 729.31 ₹6,468.98 | 735.42 ₹6,523.18 | 708.72 ₹6,286.35 Lowest |
Tender Value
₹3.6 L
EMD Value
₹8,875
Closing Date
5 Sept 2025, 6:00 pmClosed
Assistant Engineer
AEE Office, Sub Division Koipuram
Annual Plan-Construction of Toilet complex for Govt. UPS Eraviperoor-Proj. No. 127/25- 26, Eraviperoor Division, Eraviperoor GP, Koipuram BP-General Civil Work
2025_LSGD_791180_1
ET02/127/AE/LSGD/KBP/25-26
Open Tender
Civil Works - Buildings
Item Rate
Pullad
Please refer Tender documents.
7 documents required · 7 mandatory
₹785
Yes
₹8,875
Yes
28 Oct 2025
26 Aug 2025
8 Sept 2025
26 Aug 2025
5 Sept 2025
26 Aug 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1304415.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .