Loading…
Loading…
Tender Value
₹68.6 L
EMD Value
₹1.4 L
Closing Date
28 Jul 2026, 5:00 pm2d left
Er. B.C. Negi
Executive Engineer, Kullu Division, HP. PWD, Kullu
(SH- Balance work of C/O RCC R/ wall from Km 0/000 to 009.70 and C/O RCC protection wall from Km 0/327 to 0/353, Protection below the damaged abutment and P/L BC tarring work on damaged portion from 0/000 to 0/100 On Approach road of Bhootnath Brid
2026_PWD_139588_1
PW/KD/TA/2026-27- 5535-42 Dated-187.2026
Open Tender
Civil Works - Roads
Percentage
60 days
Kullu
As refer to bid document
9 documents required · 9 mandatory
₹2,000
₹1.4 L
22 Jul 2026
22 Jul 2026
29 Jul 2026
22 Jul 2026
28 Jul 2026
22 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing, laying,spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug mil),carriage of mixed material by tipper to site ,laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100 KN weight to achieve the desired density including lighting ,barricating and maintenance of diversion etc.as per tables 400.11and 400.12 and technical specification clause 406 within all leads and lift of materials and as per direction of Engineer-in- charge. | 118.73 | Per Cubic metre | 2,392.95 | ₹2,84,114.95 |
| 2 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/ binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading -iii as per Technical Specification Clause 405.By Manual Mean with in all leads and lifts of materials and as per direction of Engineer-in-Charge. | 59.36 | Per Cubic metre | 2,842.05 | ₹1,68,704.09 |
| 3 | Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means , with in all leads and lifts of materials and as per direction of Engineer-in-Charge. | 791.5 | Per square metre | 72.45 | ₹57,344.18 |
| 4 | Providing and applying tack coat with Bitumen emulsion (RS-1) using pressure distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared bituminous surface/ granular cleaned with Hydraulic broom as per Technical Specification Clause 503. within all leads and lift of materials and as per direction of Engineer-in- charge. | 791.5 | Per square metre | 24.75 | ₹19,589.63 |
| 5 | Providing and laying bituminous concrete with 100-120TPH batch type hot mix plant producing an average output of 50 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete within all leads and lift of materials and as per direction of Engineer-in- charge. | 19.79 | Per Cubic metre | 13,500 | ₹2,67,165 |
| 6 | Earth work in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, any dressing removal of stumps and other deleterious material and disposal upto any lead of 50 mtr (Fifty metre) and lift complete including dressing of sides and bottom and backfilling in trenches with excavated material in ordinary soil within all leads and lift of materials and as per direction of Engineer-in-charge. | 510.55 | Per Cubic metre | 445.35 | ₹2,27,373.44 |
| 7 | Steel reinforcement for RCC work including straightening,cutting ,bending,placing in position and binding all complete above plinth level within all leads and lift of materials and as per direction of Engineer-in- charge. | 4,818.86 | Per Kilo -gram | 107.45 | ₹5,17,786.51 |
| 8 | Providing and laying concrete for plain/ reinforced concrete 1:2:4 (One cement : Two sand : Four graded stone) aggregate in open foundations complete as per drawing and technical specification clause 802,803,1202 and 1203. within all leads and lift of materials and as per direction of Engineer-in- charge. | 703.18 | Per Cubic metre | 7,301.7 | ₹51,34,409.41 |
| 9 | Back filling behind abutment, wing wall and return wall complete as per drawing and technical specification clause 1204.3.8 Granular material. within all leads and lift including carriage of materials and as per direction of Engineer-in- charge. | 116.42 | Per Cubic metre | 1,609.95 | ₹1,87,430.38 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.76 MB
sbd.pdf
Tender Documents • 2.40 MB
BOQ_206957.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].