| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹7.0 LAccepted-AOC | ₹7.0 L Quoted ₹5.9 L | 1 | Accepted-AOC Lowest Bidder |
| 2 | 2₹7.0 L+₹1.0 L (17.6%)Rejected-Finance | ₹7.0 L+₹1.0 L (17.6%) | 2 | Rejected-Finance Higher Bid |
| 3 | 3₹7.3 L+₹1.4 L (23.6%)Rejected-Finance AT BAHARANA PO BAULANGA PS GOP DIST PURI | PURI | ODISHA | 752001 | ₹7.3 L+₹1.4 L (23.6%) | 3 | Rejected-Finance Higher Bid |
Tender Value
₹7.0 L
EMD Value
₹6,960
Closing Date
25 Mar 2026, 5:00 pmClosed
Executive Officer Konark NAC
Office of the Executive Officer Konark NAC
Construction of crematorium centre at sijugoradi in ward No-3
2026_ORULB_127354_1
KNK-3(01)-2025-26
Open Tender
Civil Works - Others
Percentage
90 days
Konark NAC
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,720
₹6,960
Yes
3 Jun 2026
20 Mar 2026
26 Mar 2026
20 Mar 2026
25 Mar 2026
20 Mar 2026
20 Mar 2026 - 25 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation of foundation in ordinary soil including dressing and levelling the bed with cost and conveyance | |||||
| 2Supplying of all materials, labour, T&P for filling in foundation & plinth with sand well watered and rammed including cost and conveyance | |||||
| 3Supplying of all materials, labour, T&P for providing and laying plain cement concrete in C.C (1:3:6) by using 4cm sized bhg metal as leveling coarse in foundation and plinth etc. complete all depth and height including cost, conveyance, royalty, curing and T&P etc. complete as per the direction of Engineer in charge. | |||||
| 4R.C.C work in ground floor of M-25grade with 20mm & down grade crusher broken hard Granite chips including hoisting & laying with cost of all labour, materials with all taxes, lead ,T & P etc all complete . | |||||
| 5Fly ash Brick masonary in foundation and plinth in C.M. (1:6) including all cost etc. complete. | |||||
| 6Centering and shuttering for rcc work including all cost of materials,Labour T&P etc all complete. For column basde,GB | |||||
| 7Centering and shuttering for rcc work including all cost of materials,Labour T&P etc all complete. FOR Column,Beam | |||||
| 8Centering and shuttering for rcc work including all cost of materials,Labour T&P etc all complete for slab | |||||
| 9Supplying, fitting and placing uncoated HYSD bar reinforcement complete as per drawing and technical specification. | |||||
| 10Providing and Laying Factory made Chamfered edge Cement Concrete Paver Bliocks of required strength, thickness & size/shape made by table Vibratory method , to attain superior smoth finish using PU or Equivalent moulds ,Laid in required gray colour and Pattern over 50mm thick Compacted bed of coarse sand , copmacting and proper embedding / laying of interlocking Paver Blocks into the sand bedding layer through vibratory compaction by using plate vibrator, Filling joints with Fine sand and cutting of Paver blocks as per required size/Pattern, finishing and sweeping extra sand in footpath , parks, lawns, drive ways, or light traffic parking and Lanes/Road etc, all complete as Per Manufacturers Specifications and Driection of Engg -In -Charge. 80mmm thick C.C. Paver Blocks of M-30 grade With approved colour design Pattern etc. complete. | |||||
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.30 MB
BOQ_585650.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .