Executive Engineer Shedhi Irrigation Division Nadiad
Construction of Box Type VRB In Place of Damaged Pipe VRB at Ch.2650 mt. of Porda to Saiyat tank Drain.
348787
06 of 2026-27
Open
Civil Works - Others
Works
Nadiad
13 documents required · 10 mandatory · 3 optional
₹900
Executive Engineer Shedhi Irrigation Division Nadiad
₹20,000
24 Sept 2026
24 Sept 2026
24 Sept 2026
9 Oct 2026
24 Sept 2026
Bill Of Quantities
Name of work :- Construction Of Box Type VRB In Place Of Damaged Pipe Vrb at Ch: 2650 mt. of Porda to Saiyat tank Drain
Quantity Unit Item Rate Per Amount
Dewatering the foundation trenches during excavation, laying
200.00 hp-hr foundation concrete,masonry etc. till completion and diversion of 52.50 hp-hr
surface and subsurface water etc. complete as directed.
Dismentalling the existing R.C.C. pipes including sorting out and
Meter stacking the useful material of the following diameter including 866.40 Meter
refilling the trenches etc. complete as directed. NP 2 Pipes. FOR
Dismentalling the existing R.C.C. pipes including sorting out and
stacking the useful material of the following diameter including
5.00 Meter 1270.70 Meter
refilling the trenches etc. complete as directed. NP 2 Pipes. FOR
Excavation for foundation in all sorts of soil including yellow sandy
gravelly soils, soft & hard murrum etc. in dry condition including
depositing the excavated stuff in uniform layers in banks or as and
where directed etc. complete for lead upto 500 m and all lift. (BY
Including dewatering.
Providing & Laying in position "NOMINAL MIX" cement concrete
using cement, sand and crushed aggregate by mass and machine
mix for C.C./R.C.C work incl. necessary formworks centering,
32.00 Cum scaffolding, compaction by vibrator, curing as directed with all lead 3346.00 Cum
& lift etc complete Without Dewatering and excluding cost of steel
reinforcement.(A)For Foundation Concrete/General purpose
(a) C.C Nominal Mix M-10 and MSA-40 mm
Providing & Laying in position "DESIGN MIX" cement concrete
using cement sand and crushed aggregate for C.C./ R.C.C work by
"FLORI" including necessary formwork, centering, scaffolding,
compaction by vibrator, curing as directed with all lead & lift etc
60.00 Cum complete without dewatering and excluding the cost of steel 4190.00 Cum
(A) For Footing of column / Abutment / Pier / Bottom slab of barrel
/ Plinth course / Coping/Approach Slab etc.
(a) Concrete grade M-15 and MSA-20 mm
(B) For Pier and Abutments / Wing wall / Head wall / Return wall /
127.00 Cum Dowel Wall etc. 4344.00 Cum
(h) Concrete grade M-15 and MSA-40 mm
(E) For Column / Beam / Solid Slab of Road Bridge / Barrel / Cutoff
43.00 Cum wall etc. 5642.00 Cum
(q) Concrete grade M-25 and MSA - 20 mm
(A) For Footing of column / Abutment / Pier / Bottom slab of barrel
28.00 Cum / Plinth course / Coping / Approach Slab etc. 4651.00 Cum
(e) Concrete grade M-25 and MSA-20 mm
(D) For Kerb / Wearing coat.
(n) Concrete grade M-25 and MSA -10 to 20mm
(F) For Perapet wall of Road Bridge / Structure .
2.00 Cum 8023.00 Cum
(t) Concrete grade M-25 and MSA -10 to 20 mm
Providing & Placing in position reinforcement bars including
cutting, bending, welding joints where necessary, hooking etc. 7194.00 Qtl
complete as per drawing for all lead and lifts.
Providing and fixing in position pre-moulded asphalt or bitumen
cork board of approved quality and specifications as per design and
5.00 Sqmt 1286.50 Sqmt
20 mm thickness
Providing and fixing 110 mm diameter P.V.C..Pipe (6 kgf / sqcm)
3.00 Meter 369.20 Meter
Water spout with necessary iron gratting as per design
Providing and laying in position 110 mm dia (6 kgf/sqcm) P.V.C.
18.00 Meter Pipe for weep holes with non corroding jali in abutments, wing 262.50 Meter
walls, retaining walls etc. complete.
Quantity Unit Item Rate Per Amount
Providing and fixing in position P.V.C. heavy duty water stops in
barrels, troughs and wing walls with 25 mm wide expansion joint
as shown in drawing including filling the joints with asphalt pad or
15.00 Meter 587.70 Meter
bitumen cork board of approved quality. (Asphalt pad or bitumen
cork board will be paid seperatly)
(a)225 mm WIDE P.V.C. WATER STOP
Providing and filling the polysulphide joint sealent of the approved
10.00 Meter make in the expansion and contraction joints in the c.c. lining 181.20 Meter
including clearing the joints with air water jet.
Providing temporary all weather and fair weather diversion
suitable for traffic during the construction period of the bridge
including providing necessary drains and all safty measures
including red lamps/ signals at night for traffic etc. comp.
Providing Drone Videography before, on going and after 4000.00 Job
construction of work as per instruction of engineer in-charge.
(Rupees Nineteen Lacs Fifty Five Thousand One Hundred Ninety six and Thirty Paisa Only/-)
I / We am / are willing to carry out the work at………………..% above / below precent.
(Should be written in figure and words) of the estimate reates mentioned above.
Amount of my / our tender works out as under.
Estimated amount put Estimated amout put
to tender rs……………. to tender Rs……………..
Deduct …………..% Add………………%
below Rs………… Above Rs……………
Net Rs……………….. Total Rs…………….
In words…………………………….. In words…………………………………
The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-In-Charge for
which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.: PRC-10/2017 Cement
Consumption/16/C Date:11/05/2017 as stated in S.O.R. therefore in R.C.C. items where there is a change as per actual mix design
4 the cost of difference of cement consumption have been deducted from the rate of original item at the rate of input rate mentioned
in all the tender.
Notes 1 - All work shall be carried out as per Public Works Department Handbook and specifications of Division or as directed by supervisory staff.
Notes 2 - The persons of firm submitting the tender should see that the all the columns in the schedule should be filled in inkand total of entries in last
column should be struck by the contractor under his signature.
Notes 3 - Rates quoted include clearing of site (prior commencement of work and at its close ) in all respects and hold good for work under all conditions,
site, moisture, weather etc.
Note 4 - The meaning of abbreviationss used in units are as under. Hact - Hactare MT - Metric Tonne Rmt = Running metre
Note 5 - Basic Rate for Cement Difference Calculation of Mix Design will be Rs. 5483.37/M.T. (Rate as per CGWRD SOR 2023-24)
Signature of agency Tender Clerk Deputy Executive Engineer
Shedhi Irrigation Division Drainage Sub Division
Executive Engineer Divisional Accoutant
Shedhi irrigation Division Shedhi Irrigation Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
01. SBD Porda to Saiyat Tank Drain.pdf
02. Schedule B.pdf
03. Itemwise Specification.pdf
04. Work and Site Conditions.pdf
05. SPECIFICATIONS FOR MATERIALS.pdf
06. Drawing Saiyat.pdf
Tender Notice No.06 of 2026-27.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .