Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹29.7 LAccepted-AOC CHELAMATTOM VALLAM KARAYIL HOUSE | KANNUR | KERALA | 670511 | ₹29.7 L | 1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | GEORGE JOSEPH L1 |
|---|---|---|---|---|
| 1.00construction of well | ||||
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 534.29 | cum | 257.63 ₹1.4 L |
| 1.00 | 2.7.1:Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.Ordinary rock | 641.15 | cum | 517.87 ₹3.3 L |
| 1.00 | 2.7.2:Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.Hard rock (requiring blasting) | 213.72 | cum | 892.05 ₹1.9 L |
| 1.00 | 2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil | 2,350.88 | cum | 131.02 ₹3.1 L |
| 1.00 | OD87366/2025-2026:Dry rubble masonry with hard stone in foundation and plinth including packing to compactness to lines and levels, cost and conveyance of all material labour charges etc. complete as per approved drawing and relevant technical specifications.(with deptl rubble) | 244.3 | cum | 1,809.83 ₹4.4 L |
| 1.01 | OD87367/2025-2026:Dry rubble masonry with hard stone in foundation and plinth including packing to compactness to lines and levels, cost and conveyance of all material labour charges etc. complete as per approved drawing and relevant technical specifications. | 138.91 | cum | 3,993.46 ₹5.5 L |
| 1.01 | OD87373/2025-2026:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 26.96 | cum | 7,756.26 ₹2.1 L |
| 1.01 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 41.32 | cum | 10,488.77 ₹4.3 L |
| 1.01 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 67.07 | sqm | 762.88 ₹51,166.36 |
Tender Value
₹29.7 L
EMD Value
₹50,000
Closing Date
4 Feb 2026, 10:00 amClosed
EXECUTIVE ENGINEER
LSGD DIVISION, JILLA PANCHAYATH, KOTTAYAM
LAC-ADS- LAC ADS PALA CONSTITUENCY -23425 2024-25 Manthrappara panachippara Drinking water supply scheme well and purchasing of motor in Ward 4 of Ramapuram GP- General Civil Work ( RETENDER)
2026_LSGD_827923_16
21/2025-26/EE/LID and EW
Open Tender
Civil Works - Others
545 days
Kottayam
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
₹50,000
Yes
7 Mar 2026
28 Jan 2026
5 Feb 2026
28 Jan 2026
4 Feb 2026
28 Jan 2026
construction of well
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
2.7.1:Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.Ordinary rock
2.7.2:Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.Hard rock (requiring blasting)
2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil
OD87366/2025-2026:Dry rubble masonry with hard stone in foundation and plinth including packing to compactness to lines and levels, cost and conveyance of all material labour charges etc. complete as per approved drawing and relevant technical specifications.(with deptl rubble)
OD87367/2025-2026:Dry rubble masonry with hard stone in foundation and plinth including packing to compactness to lines and levels, cost and conveyance of all material labour charges etc. complete as per approved drawing and relevant technical specifications.
OD87373/2025-2026:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources)
5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete
OD87384/2025-2026:Supplying and fixing Name board
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1396499.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.22 MB
PRE009.pdf
Tender Documents • 0.25 MB
FOT009.pdf
Tender Documents • 0.25 MB
SBD009.pdf
Tender Documents • 1.78 MB
BOQ_1396499.xls
BOQ • 0.24 MB
EPAY.pdf
Tender Documents • 0.23 MB
IPACT.pdf
Tender Documents • 0.23 MB
AFFI009.pdf
Tender Documents • 0.24 MB
Download all tender documents and submit your bid