Tender Value
₹34.8 L
EMD Value
₹70,000
Closing Date
26 Sept 2026, 5:00 pm4d left
Superintending Engineer, PR Circle, Kadapa
O/o the Superintending Engineer, PR Circle, Kadapa
Package No.AP04PIVBTM03-L021-Papireddipalli to Papireddipalli Vadde Colony in B Mattam Mandal ofYSR Kadapa District, Rs.55.00 and Mtc., Rs. 3.58 Lakhs
2026_ENCPR_149591_1
NIT No.18/2026-27, Dt.15.09.2026, of the Superintending Engineer, PR Circle, Kadapa (2nd Call)
Open Tender
Civil Works - Roads
Percentage
270 days
B mattam
As per SBD
2 documents required · 2 mandatory
₹0
₹70,000
O/o the Superintending Engineer, PR Circle, Kadapa
19 Sept 2026
19 Sept 2026
29 Sept 2026
19 Sept 2026
26 Sept 2026
19 Sept 2026
19 Sept 2026 - 26 Sept 2026
22 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Papireddipalli to Papireddipalli Vadde Colony in B Mattam Mandal of YSR Kadapa District | |||||
| 1.01 | Road Portion | - | - | - | - |
| 1.02 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201 MORD . including contractors profit & Over head charges, but excluding GST and Seigniorage charges etc., complete. | 1,560 | Sqm | 2.54 | ₹3,962.4 |
| 1.03 | Construction of embankment with approved material obtained from borrow pits with all lifts, transporting to site, spreading, grading to required slope and compacting with vibratory roller 80-100 KN to meet requirement of Tables 300.1 and 300.2 beyond 1000 m as per Technical Specification Clause 301.5 MORD including contractors profit & Over head charges, but excluding GST and Seigniorage charges etc., complete. | 2,036.25 | Cum | 347.35 | ₹7,07,291.44 |
| 1.04 | Construction of granular sub-base by providing well graded material(Table 400.1) with Grading III Material(HBG M/C +Stone dust) CBR Value not less than 20 and PI Value less than 6 spreading in uniform layers with Tractor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with Vibratory Roller to achieve the desired density, complete as per Technical Specification Clause 401 MORD including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete. | 180.4 | Cum | 2,611.43 | ₹4,71,101.97 |
| 1.05 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete | 126.84 | Cum | 3,678.73 | ₹4,66,610.11 |
| - | Construction of Shoulders by providing selected earth having minimum CBR of 10%, MDD not less than 1.85 g/cc with LL & PI not more than 40% and 20 respectively and spreading in uniform layers with tractor grader on prepared surface, and compacted at OMC with vibratory roller 80-100 kN to meet requirement of Table 300.2 with as per Technical Specification Clause 303 & 407 MORD, by using machinery including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete. | 195.52 | Cum | 459.7 | ₹89,880.54 |
| - | Construction of un-reinforced, panneled cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, as per design, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, wedges, steel plates including levelling the formwork etc complete as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation, admixtures as approved, curing of concrete slab for 14-days, using curing compound (where specified) and water and contraction sawn joint groove (using daimond studded nblades) 3 to 5 mm wide and 1/3rd to 1/4th depth of the slab + or - 5mm or .Thecontraction joint shall be cut as soon as the concrete as under goneinitial hardening and as hard enogh to take up the load of joint swaing machine with out causing damage to the slab. The joint ceilling compound shall not be poured bitumen type having flexibility, resistaance to age hardening and durability of the sealant shall be in accordance with BS 5212 (part-2) with all leads and lifts and coat and conveyance of all materials for 100 thickness for forming the panels of 0.75 X 0.75 mts size as per drawing and Technical Specification Clause 1501 including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. | 169.13 | Cum | 8,984.88 | ₹15,19,612.75 |
| 2Sub Work: Construction of Single vent 600 mm dia Pipe Culverts( 1 Nos) @ KM 0/060 | |||||
| - | Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH, including contractors profit & Over head charges, but excluding GST etc., complete- For Foundations | 24.71 | Cum | 125.45 | ₹3,099.87 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.52 MB
BOQ_235826.xls
BOQ • 0.33 MB
SBD18.pdf
Tender Documents • 0.97 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .