Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.8 LAdmitted-Fee/PreQual/Technical/Finance KERALA KL | ₹2.8 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹2.9 L+₹12,500.04 (4.43%)Admitted-Fee/PreQual/Technical/Finance KOLLAM KOLLAM KERALA 673585 | KOZHIKODE | KERALA | 673585 | ₹2.9 L+₹12,500.04 (4.43%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹3.0 L+₹15,274.80 (5.42%)Admitted-Fee/PreQual/Technical/Finance | ₹3.0 L+₹15,274.80 (5.42%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹3.2 L+₹36,247.60 (12.9%)Admitted-Fee/PreQual/Technical/Finance | ₹3.2 L+₹36,247.60 (12.9%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹3.8 L+₹99,136.57 (35.2%)Admitted-Fee/PreQual/Technical/Finance | ₹3.8 L+₹99,136.57 (35.2%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | RITHU M.V L2 | V M FAIZAL L4 | MOIDEENKOYA PP L1 | KAIRALI LABOUR CONTRACT CO-OPERATIVE SOCIETY L5 | Bimal EN L3 | PAYYOLI NARAYANAN SMARAKA PRAVASI LABOUR CONTRACT CO-OPERATIVE SOCIETY LTD. L6 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00ROAD WORK | |||||||||
| 1.00 | 3.15.2:Compacting Original Ground (ii) Compacting original ground supporting subgrade Loosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of Tables 300.1 and 300.2 for subgrade construction as per Technical Specification Clause 303.5.2. | 69.54 | cum | 48.68 ₹3,385.21 | 52.63 ₹3,659.89 | 46.63 ₹3,242.65 | 63.03 ₹4,383.11 | 200 ₹13,908 | 16.81 ₹1,168.97 Lowest |
| 1.00 | 4.1.A.1:Granular Sub-base with Well Graded Material (Table 400.1) (A) By Mix in Place Method Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. (i) For Grading I Material | 23.18 | cum | 2,377.6 ₹55,112.77 | 2,569.33 ₹59,557.07 | 2,276.7 ₹52,773.91 | 3,077.04 ₹71,325.79 | 2,100 ₹48,678 Lowest | 3,277.81 ₹75,979.64 |
| 1.00 | 75.8.1:Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. Max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification
(i) Nominal mix (1:2:4) | 34.77 | cum | 6,787.77 ₹2,36,010.76 | 7,335.04 ₹2,55,039.34 | 6,499.63 ₹2,25,992.14 Lowest | 8,784.48 ₹3,05,436.37 | 6,750 ₹2,34,697.5 | 9,257.84 ₹3,21,895.1 |
Tender Value
₹3.8 L
EMD Value
₹9,529
Closing Date
17 Sept 2026, 1:00 pmClosed
AE, LSGD
AE, LSGD NANMINDA
CIVIL WORKS
2026_LSGD_868878_1
11/AE/NMD
Open Tender
Civil Works - Roads
Item Rate
200 days
NANMINDA
Please refer Tender documents.
7 documents required · 7 mandatory
₹840
Yes
₹9,529
Yes
19 Sept 2026
10 Sept 2026
19 Sept 2026
10 Sept 2026
17 Sept 2026
10 Sept 2026
10 Sept 2026 - 17 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1ROAD WORK | |||||
| 1.001 | 3.15.2:Compacting Original Ground (ii) Compacting original ground supporting subgrade Loosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of Tables 300.1 and 300.2 for subgrade construction as per Technical Specification Clause 303.5.2. | 69.54 | cum | - | - |
| 1.002 | 4.1.A.1:Granular Sub-base with Well Graded Material (Table 400.1) (A) By Mix in Place Method Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. (i) For Grading I Material | 23.18 | cum | - | - |
| 1.003 | 75.8.1:Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. Max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification
(i) Nominal mix (1:2:4) | 34.77 | cum | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
Tendernotice_2.pdf
PDF • 1.75 MB
BOQ_1471685.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .