Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹80.2 L
EMD Value
₹1.0 L
Closing Date
7 Dec 2026, 5:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
SO(c), MLA
GM OFFICE MAHALAXMI AREA, TIKLIPADA-770076
Providing and Fixing water supplying pipeline from B(W) OCP water filter plant to Sardega Siding, RLS and Installation of RO filter for drinking water under B(W) OCP Mahalaxmi Area
2026_MCL_368989_1
MCL/GM/MLA/C/e-Tender/26-27/15 dt.19/11/2026
Open Tender
Water Supply/ Sanitation Works
Percentage
90 days
GM OFFICE MAHALAXMI AREA, TIKLIPADA-770076
AS PER NIT
5 documents required · 5 mandatory
₹1.0 L
20 Nov 2026
20 Nov 2026
8 Dec 2026
20 Nov 2026
7 Dec 2026
21 Nov 2026
20 Nov 2026 - 1 Dec 2026
120 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and fixing G.I. pipes complete with G.I. fittings including trenching and refilling etc. External work:80 mm dia nominal bore | 4,207.5 | meter | 1,412.45 | ₹59,42,883.38 |
| 2 | Providing and fixing gun metal gate valve with C.I. wheel of approved quality (screwed end) :80 mm nominal bore | 4 | Each | 2,773.3 | ₹11,093.2 |
| 3 | RO Purification System Providing and fixing of 250 LPH RO Plant (fully automatic) water purifier having online TDS maker setting with 1 year warranty on all non-electronic components at site as per instruction of EIC. Scope of work:1.Raw water pump(1.5 HP) -1 no. 2.Dual Media Filter-1 no. 3.Antiscalant Dosing System-1 no. 4.Micron Carriadge Filter-2 nos 5.High Pressure Pump(1.5HP)-1 no. 6.Reverse Osmosis Unit-1 no. 7.2 TON Chiller-01 No8.SS Storage Tank 500 Ltrs. | 1 | each | 3,25,450 | ₹3,25,450 |
| 4 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.:All kinds of soil. | 8.61 | cum | 217 | ₹1,868.37 |
| 5 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 2.04 | cum | 910.15 | ₹1,856.71 |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources). | 2.42 | cum | 4,826.85 | ₹11,680.98 |
| 7 | Brick work with Fly Ash Brick (230x115x75 mm size)bricksof class designation 10 in foundation and plinth in:Cement mortar 1:6 (1 cement: 6 coarse sand) | 4.37 | cum | 5,457.4 | ₹23,848.84 |
| 8 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, ifnishing and reinforcement- All work up to plinth level :1:1.5:3 (1 cement: 1.5 coarse sand (zone-III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 2.72 | cum | 7,009.05 | ₹19,064.62 |
| 9 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15 degree landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 3.39 | cum | 8,464.45 | ₹28,694.49 |
| 10 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement::1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.04 | cum | 8,090.3 | ₹8,413.91 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.90 MB
Tendernotice_2.pdf
PDF • 1.85 MB
Tendernotice_3.pdf
PDF • 0.38 MB
BOQ_381987.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .