| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.6 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹32.0 L+₹61,292.77 (1.96%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹32.8 L+₹1.5 L (4.76%)Rejected-AOC | L3 | Rejected-AOC L3 |
Tender Value
₹27.8 L
EMD Value
₹50,000
Closing Date
30 Jan 2020, 5:00 pmClosed
Executive Engineer
Executive Engineer, PWD NH Division, Kollam
FDR 19-20 Urgent patch work to NH 744 Between 20/000 and 40/000
2020_PWD_336285_1
PWD/2019-2020/348/NHDNKLM
Open Tender
Civil Works - Highways
Item Rate
60 days
kollam
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
online
₹50,000
Yes
11 Jun 2020
16 Jan 2020
3 Feb 2020
16 Jan 2020
30 Jan 2020
16 Jan 2020
Amount
Patch work
3.15 : Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with in all lifts and lead upto 1000 metres by Mechanical Means <br>Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with in all lifts and lead upto 1000 metres by Mechanical Means
4.12 : Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
5.1.a : Providing and applying primer coat with bitumen emulsion ( SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means.Providing and applying primer coat with bitumen emulsion ( SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means.
5.2.a : Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
5.3.2.a : Providing and laying bituminous macadam with 80-100 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous binder (VG 30), transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction.<br> For Grading II - (19 mm nominal size)<br>Providing and laying bituminous macadam with 80-100 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous binder (VG 30), transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction.For Grading II - (19 mm nominal size)
10.5.1b : Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504, compacting trimming and finishing the surface to from a smooth continuous surface, all as per clause 3004. 2 Filling Port holes and Patch Repairs with Bituminous concrete <br> For grading II- 13 mm (Nominal size) MaterialRemoval of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504, compacting trimming and finishing the surface to from a smooth continuous surface, all as per clause 3004. 2 Filling Port holes and Patch Repairs with Bituminous concrete For grading II- 13 mm (Nominal size) Material
5.6.2.a.1 : Providing and laying bituminous concrete with 80-100 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder( NRMB) @ 5.4 per cent of mix and filler with Anti stripping additive (Zycosoil) material 1.0 kg per 1 tonne of bitumen, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects<br> Grading - II (13.2 mm Nominal Size)Providing and laying bituminous concrete with 80-100 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder( NRMB) @ 5.4 per cent of mix and filler with Anti stripping additive material 1.0 kg per 1 tonne of bitumen, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respectsGrading - II (13.2 mm Nominal Size)
10.2 : Maintenance of Earthen Shoulder (filling with fresh soil) Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment.Maintenance of Earthen Shoulder (filling with fresh soil) Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment.
P Vijayabalan
Sudheer Sukumaran
Bidder Name
Sudheer Sukumaran
S.SETHUDURAI
P Vijayabalan
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_469280.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .