| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹212 CrAccepted-AOC 2 ARYA NAGAR NARMADA ROAD JABALPUR 482001 | JABALPUR | JABALPUR | MADHYA PRADESH | 482001 | ₹212 Cr | 1 | Accepted-AOC As per tender conditions |
| 2 | 2₹271.9 CrRejected-AOC D 17 MPAKVN INDUSTRIAL AREA MANDIDEEP RAISEN BHOPAL MADHYA PRADESH 462046 | RAISEN | MADHYA PRADESH | 462046 | ₹271.9 Cr | 2 | Rejected-AOC As per Tender conditions |
| 3 | 3₹301.9 CrRejected-AOC A 20 21 SECTOR 59 NOIDA 201301 U P INDIA | NOIDA | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201301 | ₹301.9 Cr | 3 | Rejected-AOC As per tender conditions |
Tender Value
₹275.4 Cr
EMD Value
₹5.5 Cr
Closing Date
25 May 2019, 5:00 pmClosed
DGM(MU-GV)
Deputy General Manager, MU-GV, UJVN Limited, Ganga Bhawan, Yamuna Colony, Dehradun
Comprehensive Renovation, Modernization and Up-gradation of Chilla Hydroelectric Project, District Pauri (Garhwal) on Turnkey Basis
2019_UJVN_14665_1
01/DGM(MU-GV)/2018-19
Open Tender
Machineries/ Mechanical Engg Items
1620 days
Chilla HEP site
Please refer Tender document
2 documents required · 2 mandatory
₹1.2 L
UJVN Limited, Dehradun
₹5.5 Cr
Dehradun
22 Jan 2020
10 Jan 2019
30 May 2019
10 Jan 2019
25 May 2019
11 Feb 2019
11 Feb 2019
Turbine and Associated Auxiliaries
Design, Engineering, manufacturing and Supply of vertical shaft Kaplan turbine along with all associated auxiliaries ,auxiliary equipment/ systems, for four number of Hydro- generating Units as per specifications, scope & quantities defined in Chapter-2 of PTS(Vol-III:B).
Supply of Specified Spare Parts for S.No. 1.01 above as per specifications, scope & quantities defined in Chapter-2 of PTS(Vol-III:B).
Supply of Specified Special tools & tackles, Mandatory customary tools and testing equipment etc. for S.No. 1.01 above as per specifications, scope & quantities defined in Chapter-2 of PTS(Vol-III:B).
Refurbishment of existing fixed, embedded legacy equipment such as penstock liners, spiral casing, stay ring, draft tube knee liner, intake gates, guides & sill beam, draft tube gates, guides & sill beam etc. of four number hydro-generating units as per specifications & scope defined in Chapter-2 of PTS(Vol-III:B).
Work of dismantling, transportation & storage of existing items of four number turbines of of Hydro generating Units at Employer’s store, site measurements and engineering on existing legacy structures, Turbine model testing in an approved test laboratory, design, erection, testing and commissioning including performance testing, field acceptance test, training of employer’s personnel, handing over of plant to the Employer of four number of vertical shaft Kaplan turbines & all associated components & equipment for four number of Hydro generating Units as per specifications & scope defined in chapter 2 of PTS(Vol-III:B) .
Digital Governing System & associated auxiliaries
Design, Engineering, manufacturing and Supply of digital governing system & associated auxiliaries for four numbers vertical shaft Kaplan turbines & suspended hydro – generating unit & all associated components & equipment , each complete with auxiliaries, accessories as per specifications, scope & quantities defined in Chapter-3 of PTS(Vol-III:B).
Supply of Specified Spare Parts for S.No. 2.01 above as per specifications, scope & quantities defined in Chapter-3 of PTS(Vol-III:B).
Supply of all types of tools & tackles and testing equipments etc. for S.No. 2.01 above as per specifications, scope & quantities defined in Chapter-3 of PTS(Vol-III:B).
Refurbishment of existing fixed, embedded legacy equipment as per specifications & scope defined in Chapter-3 of PTS(Vol-III:B).
Work of dismantling, transportation & storage of existing items of four number turbines of of Hydro generating Units at Employer’s store, site measurements and engineering on existing legacy structures, Turbine model testing in an approved test laboratory, design, erection, testing and commissioning including performance testing, field acceptance test, training of employer’s personnel, handing over of plant to the Employer of four number of vertical shaft Kaplan turbines & all associated components & equipment for four number of Hydro generating Units as per specifications & scope defined in Chapter 3 of PTS(Vol-III:B) .
Generator and Associated System and Auxiliaries
Design, Engineering, manufacturing and Supply of Vertical shaft suspended type AC synchronous alternators/ generators with all associated components & equipment/system such as Static Excitation system, 11KV bus duct system ,Condition monitoring system and any other equipment along with all associated auxiliaries (complete in all respect) for four number of Hydro- generating Units as per specifications, scope & quantities defined in Chapter-4 of PTS(Vol-III:B)
Supply of Specified Spare Parts for S.No. 3.01 above as per specifications, scope & quantities defined in Chapter-4 of PTS(Vol-III:B).
Supply of all types of tools & tackles and testing equipments etc. for S.No. 3.01 above as per specifications, scope & quantities defined in Chapter-4 of PTS(Vol-III:B).
Refurbishment of existing fixed, embedded legacy equipment such as sole plates, foundation bolts, other embedded structures & equipment etc., related to the for four number alternator/ generator taken up for comprehensive RMU and as per specifications & scope defined in Chapter-4 of PTS(Vol-III:B).
Work of dismantling, transportation & storage of existing items at Employer’s store, site measurements and engineering on existing legacy structures, Design ,Erection, testing and commissioning including performance testing, field acceptance test, training of employer’s personnel, handing over of plant to the Employer of for four number vertical shaft suspended type AC synchronous alternators/ generators and all associated system, auxiliaries, components & equipment as per specifications & scope defined in Chapter 4 of PTS(Vol-III:B).
GSU Transformer and Station Transformer
Design, Engineering, Manufacturing and Supply four(4) number of 3-Ø, 50 MVA, 11/(132/√3)kV, Generator Step - Up (GSU) Transformers and one(1) number of 3-Ø, 5MVA, (132/√3)/11kV, ONAN cooled Station Transformer each complete with all associated & necessary items such as bushings, undercarriage, current transformers, cooling arrangements, instrumentation, valves, piping, mounting plates, hardware, fittings, cable trays, marshalling box, marshalling kiosk , condition monitoring system and any other equipment along with all associated auxiliaries (complete in all respect) etc. ,as per specifications, scope & quantities defined in Chapter 5 of PTS(Vol-III:B).
Supply of Specified Spare Parts for S.No. 4.01 above as per specifications, scope & quantities defined in Chapter-5 of PTS(Vol-III:B).
Supply of all types of tools & tackles and testing equipment etc. for S.No. 4.01 above as per specifications, scope & quantities defined in Chapter-5 of PTS(Vol-III:B).
Refurbishment work, replacement of rail tracks, re-fixing after duly levelling, alignment & new clamp replacement, cleaning and grinding etc. for all GSU Transformers from transformer deck to the powerhouse erection bay as per specifications, scope defined in Chapter 5 of PTS(Vol-III:B).
Work of dismantling, transportation & storage of existing items at Employer’s store, site measurements and engineering on existing legacy structures, Design ,Erection, testing and commissioning including performance testing, field acceptance test, training of employer’s personnel, handing over of plant to the Employer of four GSU transformers ,one Station transformer & all associated components & equipment with auxiliaries, accessories as per specifications & scope defined in Chapter 5 of PTS(Vol-III:B).
Dry Type Transformers and Associated Auxiliaries
Design, Engineering, manufacturing and Supply two numbers of 1000kVA, 11/0.415kV enclosed dry type, 3-Ø, Station Auxiliary Transformers (SAT) and four numbers of 500kVA, 11/0.415kV enclosed dry type, 3-Ø, Unit Auxiliary Transformers (UAT) each complete with all necessary items, accessories etc.,as per specifications, scope & quantities defined in Chapter 6 of PTS(Vol-III:B).
Supply of Specified Spare Parts for S.No. 5.01 above as per specifications, scope & quantities defined in Chapter-6 of PTS(Vol-III:B).
Supply of all types of tools & tackles and testing equipment etc. for S.No. 5.01 above as per specifications, scope & quantities defined in Chapter-6 of PTS(Vol-III:B).
Refurbishment of rail tracks, re-fixing after duly leveling, alignment & new clamp replacement, cleaning and grinding etc. from erection bay to the transformer deck and shall include all required work etc., for all Auxiliary Transformers (SATs as well as UATs) at Chilla HEP as per specifications & scope defined in Chapter 6 of PTS(Vol-III:B).
Work related to dismantling, transportation & storage of existing items at Employer’s store, site measurements and engineering on existing legacy structures, Design ,Erection, testing and commissioning including performance testing, field acceptance test, training of employer’s personnel, handing over of plant to the Employer of all dry type transformers and all associated components & equipment with auxiliaries, accessories as per specifications & scope defined in Chapter 6 of PTS(Vol-III:B).
Plant Computerized Control and Monitoring System-SCADA
Design, Engineering, manufacturing and Supply of Plant Computerized Control and Monitoring System-SCADA along with all necessary equipment,System & accessories etc., as per specifications, scope & quantities defined in Chapter-7 of PTS(Vol-III:B).
Supply of Specified Spare Parts for S.No. 6.01 above as per specifications, scope & quantities defined in Chapter-7 of PTS(Vol-III:B).
Supply of all types of tools & tackles and testing equipment etc. for S.No. 6.01 above as per specifications, scope & quantities defined in Chapter-7 of PTS(Vol-III:B).
Work of dismantling, transportation & storage of existing items at Employer’s store, site measurements and engineering on existing legacy structures, Design , refurbishment (if any) Erection, testing and commissioning including performance testing, field acceptance test, training of employer’s personnel, handing over of plant to the Employer of “computerized control and monitoring system (SCADA)” and all associated components & equipment with auxiliaries, accessories as per specifications & Scope defined in Chapter 7 of PTS(Vol-III:B).
Switchyard Equipment and Associated Auxiliaries
Supply of Switchyard equipment and Associated auxiliaries, accessories ,equipment/system as per specifications, scope & quantities defined in Chapter-8 of PTS(Vol-III:B).
Supply of Specified Spare Parts for S.No. 7.01 above as per specifications, scope & quantities defined in Chapter-8 of PTS(Vol-III:B).
Supply of all types of tools & tackles and testing equipment etc. for S.No. 7.01 above as per specifications, scope & quantities defined in Chapter-8 of PTS(Vol-III:B).
Refurbishment as per specifications, scope & quantities as per specifications, scope & quantities defined in Chapter-8 of PTS(Vol-III:B).
Work regarding to dismantling, transportation & storage of existing items at Employer’s store, site measurements and engineering on existing legacy structures, Design ,Erection, testing and commissioning including performance testing, field acceptance test, training of employer’s personnel, handing over of plant to the Employer of “all Switchyard equipment , Associated auxiliaries accessories as per specifications & scope defined in Chapter-8 of PTS(Vol-III:B).
11kV switchgear System
Supply of Specified Spare Parts for S.No. 8.01 above as per specifications, scope & quantities defined in Chapter-9 of PTS(Vol-III:B).
Supply of all types of tools & tackles and testing equipment etc. for S.No. 8.01 above as per specifications, scope & quantities defined in Chapter-9 of PTS(Vol-III:B).
Woks regarding refurbishment, execution of all allied works all 11kV switchgears /equipment including foundation and structure at new 11kV room, 11kV cable route survey and finalization, construction of trenches and pits, trenchless digging, laying of pipes, making, backfilling works at road crossing, installation of underground cable, construction of earthing system, drainage system, Fencing etc. as per requirement as per specifications & scope defined in Chapter 9 of PTS (Vol-III:B)
Work regarding to Erection, testing and commissioning including performance testing, field acceptance test, training of employer’s personnel, handing over of plant to the Employer of 11kV switchgear System and Associated auxiliaries accessories as per specifications & scopedefined in Chapter 9 of PTS (Vol-III:B).
LT Switchgear System
Design, Engineering, manufacturing and Supply of LT Switch gear comprising UABs, SSBs ,Various Secondary Station Switchboards of indoor metal enclosed 415V switchgear type, complete with cubicles, protection, metering, bus bar system, draw out type electrically operated air circuit breakers, fixed MCCBs, instrument transformers, instruments, cabling, wiring, and other accessories for making the system functional. and insulating mat etc., and any other equipment along with all associated auxiliaries (complete in all respect) as per specifications, scope & quantities defined in Chapter 10 of PTS(Vol-III:B)
Supply of Specified Spare Parts for S.No. 9.01 above as per specifications, scope & quantities defined in Chapter-10 of PTS(Vol-III:B).
Supply of all types of tools & tackles and testing equipment etc. for S.No. 9.01 above as per specifications, scope & quantities defined in Chapter-10 of PTS(Vol-III:B).
Refurbishment of existing sytem as per specifications, scope & quantities of LT switchgear System and Associated auxiliaries accessories as per specifications & scope defined in Chapter 10 of PTS(Vol-III:B)
Work regarding to dismantling, transportation & storage of existing items at Employer’s store, site measurements and engineering on existing legacy structures, Design ,Erection, testing and commissioning including performance testing, field acceptance test, training of employer’s personnel, handing over of plant to the Employer of “ LT switchgear System and Associated auxiliaries accessories as per specifications & scope defined in Chapter 10 of PTS(Vol-III:B)
220 V AND 48 V DC SYSTEM
Design, Engineering, manufacturing and Supply of plant 220 V and 48 V auxiliary DC Power supply system complete in all respect ,two numbers of 10-KVA or higher Uninterrupted Power Supply systems , distribution system,battery management System, any other equipment along with all associated auxiliaries (complete in all respect) etc., as per specifications, scope & quantities defined in Chapter 11 of PTS(Vol-III:B)
Supply of Specified Spare Parts for S.No.10.01 above as per specifications, scope & quantities defined in Chapter-11 of PTS(Vol-III:B).
Supply of all types of tools & tackles and testing equipment etc. for S.No. 10.01 above as per specifications, scope & quantities defined in Chapter-11 of PTS(Vol-III:B).
Refurbishment as per specifications & scope defined in chapter-11 of PTS(Vol-III:B).
Work regarding to dismantling, transportation & storage of existing items at Employer’s store, site measurements and engineering on existing legacy structures, Erection, testing and commissioning including performance testing, field acceptance test, training of employer’s personnel, handing over of plant to the Employer of “ new 220 V and 48 V auxiliary DC power supply system comprising of mainly 220V and 48 V DC battery Bank,Battery Charger, UPS systen and associated auxiliaries accessories etc.,as defined in chapter 11 of PTS(Vol-III:B).
FIRE FIGHTING SYSTEM
Design, Engineering, manufacturing and Supply of fire fighting system of power staion inclding equipment and system such as HVW spray systen for GSU,Station ,Station Service and Auxiliary Transformers, MVW spray system for Cable Gallary ,Hydrant system for inside and outside of power station building and switchyard .various type of portable extinguishers,various type of sensers ,Fire Detection,Monitoring, Alarm ,Control and protection system etc with all related accessaries,auxiliaries, fitting and fituxres, any other equipment along with all associated auxiliaries etc., as per specifications, scope & quantities defined in Chapter 12 of PTS(Vol-III:B)
Supply of Specified Spare Parts for S.No. 11.01 above as per specifications, scope & quantities defined in Chapter-12 of PTS(Vol-III:B).
Supply of all types of tools & tackles and testing equipment etc. for S.No. 11.01 above as per specifications, scope & quantities defined in Chapter-12 of PTS(Vol-III:B).
Refurbishment as per specifications & scope defined in Chapter 12 of PTS(Vol-III:B)
Work regarding to dismantling, transportation & storage of existing items at Employer’s store, site measurements and engineering on existing legacy structures, Design ,Erection, testing and commissioning including performance testing, field acceptance test, training of employer’s personnel, handing over of plant to the Employer of “ fire fighting system of power staion inclding equipment and system such as HVW spray systen for GSU,Station ,Station Service and Auxiliary Transformers, MVW spray system for Cable Gallary ,Hydrant system for inside and outside of power station building and switchyard .various type of portable extinguishers,various type of sensers ,Fire Detection ,Monitoring, Alarm ,Control and protection system and any other system with all related accessaries,auxiliaries,fitting and fituxres as per specifications & scope defined in Chapter 12 of PTS(Vol-III:B) .
Power ,Control ,Instrumentation and communication Cables
Design, Engineering, manufacturing and Supply of new power, control, coaxial, communication and instrumentation cables, cable trays, support structures, complete with cable terminals and all accessories as per specifications, scope & quantities defined in Chapter 13 of PTS(Vol-III:B)
Supply of Specified Spare Parts for S.No. 12.01 above as per specifications, scope & quantities defined in Chapter-13 of PTS(Vol-III:B).
Supply of all types of tools & tackles and testing equipment etc. for S.No. 12.01 above as per specifications, scope & quantities defined in Chapter-13 of PTS(Vol-III:B).
Work regarding dismantling, transportation & storage of existing cables at Employer’s store, site measurements and engineering on rating and requirement , Design and laying , testing and commissioning including performance testing, field acceptance test, training of employer’s personnel, handing over of plant to the Employer of new power, control, coaxial, communication and instrumentation cables, cable trays, support structures, complete with cable terminals and all accessories as per specifications & scope defined in Chapter 13 of PTS(Vol-III:B)
Protection System
Design, Engineering, manufacturing and Supply of protection system of complete Chilla plant (including all balance of plant) and all associated system, auxiliaries, components & equipment each complete with auxiliaries, accessories etc., as as per specifications, scope & quantities defined in Chapter 14 of PTS(Vol-III:B)
Supply of Specified Spare Parts for S.No. 13.01 above as per specifications, scope & quantities defined in Chapter-14 of PTS(Vol-III:B).
Supply of all types of tools & tackles and testing equipment etc. for S.No. 13.01 above as per specifications, scope & quantities defined in Chapter-14 of PTS(Vol-III:B).
Work regarding to dismantling, transportation & storage of existing protection System at Employer’s store, site measurements and efor layout engineering, design, erection, testing and commissioning including performance testing, field acceptance test, training of employer’s personnel, handing over of plant to the Employer, of protection system of complete Chilla plant (including all balance of plant) and all associated system, auxiliaries, components & equipment each complete with auxiliaries, accessories as per specifications, scope & quantities defined in Chapter 14 of PTS(Vol-III:B)
Electrical Testing and Measuring Equipment
Design, Engineering, manufacturing and Supply ,quality assurance, shop assembly, shop testing, transportation, delivery at site ,demonstration/ training of the employer personnel, of electrical testing and measuring equipment as per specifications, scope & quantities defined in Chpater 15 of PTS(Vol-III:B), each complete with all auxiliaries, accessories, equipment, wiring and cubicles etc.
Supply of Specified Spare Parts for S.No. 14.01 above as per specifications, scope & quantities defined in Chapter-15 of PTS(Vol-III:B).
Supply of all types of tools & tackles and testing equipment etc. for S.No. 14.01 above as per specifications, scope & quantities defined in Chapter-15 of PTS(Vol-III:B).
Illumination System
Design, Engineering, manufacturing and Supply of illumination system for indoor and outdoor areas of the powerhouse Switchyard and adjoining areas i.e. Within plant boundary along with any other equipment along with all associated auxiliaries (complete in all respect) as per specifications, scope & quantities defined defined in Chapter 16 of PTS(Vol-III:B)
Supply of Specified Spare Parts for S.No. 15.01 above as per specifications, scope & quantities defined in Chapter-16 of PTS(Vol-III:B).
Supply of all types of tools & tackles and testing equipment etc. for S.No. 15.01 above as per specifications, scope & quantities defined in Chapter-16 of PTS(Vol-III:B).
Work regarding to dismantling, transportation & storage of existing protection System at Employer’s store, site measurements and layout engineering , design,erection, testing and commissioning including performance testing, field acceptance test, training of employer’s personnel, handing over of plant to the Employer of illumination system for indoor and outdoor areas of the powerhouse Switchyard and adjoining areas i.e. Within plant boundary as per specifications, & scope defined in Chapter 16 of PTS(Vol-III:B)
Emergency Diesel Generating Units
Design, Engineering, manufacturing and Supply of two (2) No.500 kVA silent diesel generator sets suitable for in-house installation, complete with all accessories, fuel tank and fuel system, equipment instruments and wiring etc., as per specifications, scope & quantities defined in Chapter 17 of PTS(Vol-III:B)
Supply of Specified Spare Parts for S.No.16.01 above as per specifications, scope & quantities defined in Chapter-17 of PTS(Vol-III:B).
Supply of all types of tools & tackles and testing equipment etc. for S.No. 16.01 above as per specifications, scope & quantities defined in Chapter-17 of PTS(Vol-III:B).
Work regarding to dismantling, transportation & storage of existing protection System at Employer’s store, site measurements and layout engineering ,refurbishment,erection, testing and commissioning including performance testing, field acceptance test, training of employer’s personnel, handing over of plant to the Employer of two (2) No.500 kVA silent diesel generator sets suitable for in-house installation, complete with all accessories, fuel tank and fuel system, equipment instruments and wiring etc., as per specifications & scope defined in Chapter 17 of PTS(Vol-III:B)
Heating Ventilation and Air conditioning systems
Design, Engineering, Manufacturing and Supply of Heating Ventilation and Air conditioning systems complete with all accessories and necessary components etc., as per specifications, scope & quantities defined in Chapter-18 of PTS(Vol-III:B)
Supply of Specified Spare Parts for S.No.17.01 above as per specifications, scope & quantities defined in Chapter-18 of PTS(Vol-III:B).
Supply of all types of tools & tackles and testing equipment etc. for S.No. 17.01 above as per specifications, scope & quantities defined in Chapter-18 of PTS(Vol-III:B).
Refurbishment as per specifications, scope & quantities defined in Chapter 18 of PTS(Vol-III:B)
Works regarding to dismantling, transportation & storage of existing protection System at Employer’s store, site measurements and layout engineering, erection, testing and commissioning including performance testing, field acceptance test, training of employer’s personnel, handing over of plant to the Employer of Heating Ventilation and Air conditioning systems complete with all accessories and necessary components as per specifications, scope & quantities defined in Chapter-18 of PTS(Vol-III:B)
Cooling water system
Design, Engineering, manufacturing and Supply of Cooling water system complete with all accessories and necessary components as per specifications, scope & quantities defined in Chapter-19 of PTS(Vol-III:B)
Supply of Specified Spare Parts for S.No.18.01 above as per specifications, scope & quantities defined in Chapter-19 of PTS(Vol-III:B).
Supply of all types of tools & tackles and testing equipment etc. for S.No. 18.01 above as per specifications, scope & quantities defined in Chapter-19 of PTS(Vol-III:B).
Refurbishment as per specifications & scope defined in Chapter 19 of PTS(Vol-III:B)
Works regarding to dismantling, transportation & storage of existing protection System at Employer’s store, site measurements and layout engineering, erection, testing and commissioning including performance testing, field acceptance test, training of employer’s personnel, handing over of plant to the Employer of cooling water system complete with all accessories and necessary components as per specifications & scope defined in Chapter-19 of PTS(Vol-III:B)
General Purpose Station Low Pressure Compressed Air System
Design, Engineering, manufacturing and Supply of General Purpose Station Low Pressure Compressed Air System complete with all accessories and necessary components as per specifications, scope & quantities defined in Chapter-20 of PTS(Vol-III:B)
Supply of Specified Spare Parts for S.No.19.01 above as per specifications, scope & quantities defined in Chapter-20 of PTS(Vol-III:B).
Supply of all types of tools & tackles and testing equipment etc. for S.No. 19.01 above as per specifications, scope & quantities defined in Chapter-20 of PTS(Vol-III:B).
Refurbishment as per specifications, scope & quantities as per specifications & scope defined in Chapter 20 of PTS(Vol-III:B)
Works regarding to dismantling, transportation & storage of existing protection system at Employer’s store, site measurements and layout engineering, design, erection, testing and commissioning including performance testing, field acceptance test, training of employer’s personnel, handing over of plant to the Employer of General Purpose Station Low Pressure Compressed Air System complete with all accessories and necessary components as per specifications & scope defined in Chapter-20 of PTS(Vol-III:B)
Drainage and Dewatering System
Design, Engineering, manufacturing and Supply of Drainage and Dewatering System complete with all accessories and necessary components etc., as per specifications, scope & quantities defined in Chapter-21 of PTS(Vol-III:B)
Supply of Specified Spare Parts for S.No.20.01 above as per specifications, scope & quantities defined in Chapter-21 of PTS(Vol-III:B).
Supply of all types of tools & tackles and testing equipment etc. for S.No.20.01 above as per specifications, scope & quantities defined in Chapter-21 of PTS(Vol-III:B).
Refurbishment of sytem as per specifications, scope & quantities defined in Chapter 21of PTS(Vol-III:B)
Works regarding to dismantling, transportation & storage of existing protection System at Employer’s store, site measurements and layout engineering , design,erection, testing and commissioning including performance testing, field acceptance test, training of employer’s personnel, handing over of plant to the Employer of Drainage and Dewatering System complete with all accessories and necessary components as per specifications, scope & quantities defined in Chapter-21of PTS(Vol-III:B)
Drinking Water Purification System
Design, Engineering, manufacturing and Supply Drinking water purification system complete with all accessories and necessary components along with spares parts, Special tools and testing instruments/equipment as per specifications, scope & quantities defined in Chapter-22 of PTS(Vol-III:B)
Erection, testing and commissioning including performance testing, field acceptance test, training of employer’s personnel, handing over of plant to the Employer of Drinking water purification system complete with all accessories and necessary components along with spares parts ,Special tools and testing instruments/equipment as per specifications, scope & quantities defined in Chapter-22 of PTS(Vol-III:B)
Bird Repelling system for Power Station building
Design, Engineering, manufacturing and Supply of Bird Repelling system for Power Station building complete with all accessories and necessary components along with spares parts ,Special tools and testing instruments/equipment as per specifications, scope & quantities defined in Chapter-23 of PTS(Vol-III:B)
Erection, testing and commissioning including performance testing, field acceptance test, training of employer’s personnel, handing over of plant to the Employer of Bird Repelling system for Power Station building complete with all accessories and necessary components along with spares parts ,Special tools and testing instruments/equipment as per specifications, scope & quantities defined in Chapter-23 of PTS(Vol-III:B)
Special Energy Meters and Associated Metering System
Design, Engineering, manufacturing and Supply of Special Energy Meters and Associated metering System complete with all accessories and necessary components along with spares parts ,Special tools and testing instruments/equipment as per specifications, scope & quantities defined in Chapter-24 of PTS(Vol-III:B)
Erection, testing and commissioning including performance testing, refurbishment (if any), field acceptance test, training of employer’s personnel, handing over of plant to the Employer of Special Energy Meters and Associated metering System complete with all accessories and necessary components along with spares parts ,Special tools and testing instruments/equipment as per specifications, scope & quantities defined in Chapter-24 of PTS(Vol-III:B)
Intake and Tailrace Level Instrumentation and Forebay Trash Rack Cleaning Machine
Design, Engineering, manufacturing and Supply of Intake and Tailrace Level Instrumentation and Forebay Trash Rack Cleaning Machine complete with all accessories and necessary components etc.,as per specifications, scope & quantities defined in Chapter-25 of PTS(Vol-III:B)
Supply of Specified Spare Parts for S.No.24.01 above as per specifications, scope & quantities defined in Chapter-25 of PTS(Vol-III:B).
Supply of all types of tools & tackles and testing equipment etc. for S.No.24.01 above as per specifications, scope & quantities defined in Chapter-25 of PTS(Vol-III:B).
Refurbishment of sytem as per specifications, scope & quantities defined in Chapter 25 of PTS(Vol-III:B)
Erection, testing and commissioning including performance testing, field acceptance test, training of employer’s personnel, handing over of plant to the Employer of IIntake and Tailrace Level Instrumentation and Forebay Trash Rack Cleaning Machinecomplete with all accessories and necessary components as per specifications, scope & quantities defined in Chapter-25 of PTS(Vol-III:B)
All Civil works as per tender specifications defined in General Technical specification(Vol-IIIA) and Chapter-1 to 25 of PTS(Vol-III:B)
Training to Employer’s Personnel during engineering/ manufacturing and Erection/Installation/ Testing & Commissioning Phase as per specifications, scope & man-days defined in Chapter-1 of PTS(Vol-III:B)
Description of Work / Item(s)
Schedule of “Deviations with Cost of Withdrawal
Deviation No-1
Deviation No-2
Deviation No-3
Deviation No-4
Deviation No-5
Deviation No-6
Deviation No-7
Deviation No-8
Deviation No-9
Deviation No-10
Deviation No-11
Deviation No-12
Deviation No-13
Deviation No-14
Deviation No-15
ANDRITZ HYDRO Private Limited
Voith Hydro Pvt. Ltd.
ANDRITZ HYDRO Private Limited
Bharat Heavy Electricals Limited
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid