Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹45,000
Closing Date
11 Feb 2026, 5:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Chief General Manager -Thermal
Tender specification for carrying out Arc spray coating on erosion prone areas of combustor water wall tubes of Unit-1to4 Boilers during annual overhauling in years 2026-28(for 02 Years)
264972
SLPP/BLR/Metal Spray/Arc/26-28
Open
Power/Energy Projects/Products/Services
Works
Surat
₹2,950
Gujarat Industries Power Company Limited
₹45,000
22 Jan 2026
22 Jan 2026
22 Jan 2026
11 Feb 2026
22 Jan 2026
technical bid. Details of Wires (Bond coat and final Coat) shall be consist of technical name, chemical
composition, origin of source, certificate from the supplier with date of manufacture for justifying its purity and
quality. Any bid without this information shall be rejected.
Important Note: Coating Wires offered by bidder in Technical Bid will be evaluated by GIPCL in line with tender
specification. In case coating wire are not found as per tender specification, bidder has to offer other coating
Wire acceptable as per tender specification. Offered coating wire will be evaluated and approved by GIPCL at
Techno-commercial Evaluation stage. Party shall not be allowed to use any coating wire other than the one
approved by GIPCL during Techno-commercial Evaluation stage.
2.2.2 Party to follow following procedure at site:
Party shall mobilize all Consumables, machinery, special tools& tackles, skilled technicians and other man
power to site well in advance.
Surface preparation: In this stage remove the worn-out tube particles, corrosive media particles and loose
scale particles with high velocity alumina grit blasting to judge the adherence of the coating on Boiler tube
material. Surface roughness shall be maintained/measured as per coating requirement.
Coating application: This stage involves coating of Boiler tube with suitable twin wire arc spray. Coating
shall be performed in specified patterns to enable complete homogeneity and ensure surface adherence.
This coating shall be tested at various stages of application to ensure uniformity in thickness.
Coating Thickness: Minimum coating thickness to be achieved shall be 500 microns and max. Thickness
upto1000 microns.
2.2.3 Quality Control of ARC Spray coating:-
After application of the ARC spray, following quality parameters to be established:
TENDER NO.: SLPP/BLR/METAL SPRAY/ARC/26-28 Page
High hardness-Coating should achieve hardness level in excess of 55Rc with superior erosion resistance.
Erosion resistance shall be maintained at elevated boiler temperature.
Superior bond strength; Coating should provide excellent bonding to most metallic substrates.
Wear Resistance: Coating should provide excellent adhesive, abrasive and erosive wear resistance.
Corrosion Resistance: Coating should be very high resistance to sulfidation in boilers and provide excellent
salt spray test corrosion results and are resistance to alkaline and oxidizing acid environment.
Outstanding resistance to cavitation.
High temperature performance: It should maintain good hardness at elevated temperature. The hot
hardness provides erosion and corrosion resistance to 1100 oC
No heat affected zone: This thermal arc spray process should not introduce a micro structural changes
risking / cracking that could propagate into the boiler tube.
Resistance to Thermal cycling; Thermal arc spray must have high bond strength and excellent corrosion
resistance to thermal cycling from room temperature to 1100 oC
# Vendor shall prepare specimens (02 Nos.) for testing during application of coating and such
specimens shall be sent for testing after coating process. The vendor shall submit test certificate
of all the tested samples of Procedure Qualification. Vender shall also submit the equal number of
fresh specimens to GIPCL for testing. All specimens shall be of Carbon steel base materials.
$ The parent material adjacent to coating area shall be masked properly so that the coating area
alone is exposed.
2.3 Extra attention to be given by contractor:-
The arc spray coating work is carried out during Annual Overhauling (AOH) of Boiler Unit. During
AOH execution, many other jobs are also scheduled along with the metal spray work. Hence, party
shall have to work parallelly with other agencies and intermittently as per availability of front at
site in real time situation. Also, party may have to remain idle during working time, if front is not
available due to other work. Further, party may have to work in odd hours also as per need. The
total arc spray work shall be completed as per work schedule decided by Engineer In-charge. For
Metal spray work GIPCL will not guarantee availability of ID fans for ventilation purpose, as
shutdown work is taken on this system also. Party to make their own arrangement for their
comfort level to work continuously inside the combustor. They should clearly indicate in their bid,
how they will ensure continuous working environment without ID fans during metal spray
application work.
Party shall make necessary exhaust fan arrangement for removal of fumes/gases generated while
application of ARC spray coating, if required.
2 x 12 Hours work: -
Contractor should schedule the job based on four to five-man crew working in two (12 hours) shift in a day.
They have to furnish in the bid number of crews and machines they are going to deploy to site to complete
the job with in time schedule given in clause completion period below. They should bring sufficient extra
equipment and spares to avoid un interruptions of work and to ensure healthiness of their equipment for
timely completion of work.
Bidder should arrange minimum Two sets of ARC spray equipment and accordingly additional crew
members shall be arranged at site for parallel work of ARC spray coating at multiple front for timely
completion of work.
TENDER NO.: SLPP/BLR/METAL SPRAY/ARC/26-28 Page
2.4 The bid submitted by the bidder not covering the total scope of work and services as detailed out in the
tender document shall be liable for rejection.
2.5 Quantum of job mentioned against all items in the price bid are indicative only & may vary as per site
requirement & not to be construed as maximum or guaranteed quantity. The quantities shown in the price
bid are approximate quantities for the contract period and they may vary as per job requirements.
2.6 All the miscellaneous activities pertaining to specific work to be executed for satisfactory performance is
in the scope of contractor in his quoted rates.
3. ITEMS/SERVICES TO BE PROVIDED BY GIPCL FREE OF COST
a. Electrical Supply at one location Distribution shall be done by Bidder.
b. Compressor air at 6 kg/cm2
c. Scaffolding for carrying out works wherever required.
Contractor has to arrange required Oxygen, Nitrogen and Aluminum oxide grit for blasting on their own.
Purity of these materials/gases shall be properly maintained by successful bidder.
Bidder should indicate quantity of all the above materials/gases required for completing the job in advance
after award of contract.
4. GENERAL INSTRUCTIONS
4.1 The Bidders who are interested in participating in the tender must read and comply with the instructions
and the terms and conditions contained in the tender document.
4.2 The bids shall be filled in by the tenderer clearly, neatly and accurately. Any alteration, erasures or over-
writing would be liable to make the tender invalid unless the same is neatly carried out and attested over
the full signature of tenderer. The decision of the Company to interpret the information and rates filled in
by the tenderer shall be final and binding on the bidder.
4.3 The Bidders are requested to make themselves fully conversant with the General Conditions of Contract,
Special Conditions of Contract, Technical Specifications, site conditions, safety and health aspects and
norms to be observed, etc. at the time of submitting their bids so that no ambiguity arises in these respects
subsequent to submission of the Bids.
4.4 Before quoting the rates the Bidder should go through the specifications, scope of work etc. and get himself
fully conversant with them. The bid should include cost of mobilization and cost to adhere to all safety
norms as described in the tender. No relaxation or request for revision of quoted/accepted rates shall be
entertained subsequent to the opening of bid on account of mobilization or Safety costs.
4.5 Bidder has to quote for all four units. Bids received for only one unit shall not be considered.
4.6 Failure to furnish all the information as required under the bid documents or submission of a bid containing
deviations from the contractual terms and conditions, specifications or requirements shall be treated and
rejected as being non – responsive.
4.7 The bids shall be required to be submitted within the time frames set out in the Notice Inviting Tender
(‘NIT’) and bids submitted thereafter shall not be accepted and considered.
4.8 The tender documents shall not be transferable.
4.9 The Bidders are expected to examine all instructions, forms, terms and specifications in the bid documents
and to fully inform themselves as to all the conditions and matters which may affect the subject matter of
the work/tender or the cost thereof. If any Bidder finds discrepancies or omissions in the specifications and
TENDER NO.: SLPP/BLR/METAL SPRAY/ARC/26-28 Page
documents or is in doubt as to the true meaning or interpretation of any part, he shall seek necessary
clarifications during the pre-bid meeting.
4.10 Conditional offers shall be rejected at the outset.
4.11 The Company reserves the right to extend to the deadlines for submission of the bids by amending the bid
documents and in such a case, the rights and obligations of the Company and the Bidders shall be subject
to the deadline as extended.
4.12 During evaluation of bids the Company may, at its discretion ask the bidder (s) for clarification of their bid.
The request for clarification and the response shall be in writing and no change in prices or substance of
the bid shall be sought, offered or permitted.
4.13 The Company reserves the right to amend and modify the bidding documents at any time prior to the
deadline for submission of bids, either at its own discretion or in response to a clarification requested by a
prospective Bidder. In such cases, the Company may in its discretion extend the deadline for submission of
bids in order to facilitate the prospective Bidders for incorporating the effect of the amendment in their
4.14 The Bidders shall bear all costs and expenses associated with and incidental to the preparation and
submission of their respective bids, to attend meetings or conferences, if any, including any pre award
discussion with the successful Bidder, technical and other presentations, etc. and the Company shall not
be liable in any manner for the same.
4.15 In the event that the successful Bidder is a joint venture formed of two or more companies, the Company
will require that the parties to the joint venture accept joint and several liabilities for all obligations under
4.16 Timely completion of work and strict adherence to the allotted time frames shall be the essence of the
4.17 The Company reserves the right to qualify/disqualify any applicant without assigning any reason.
4.18 The Bidder shall be disqualified, if any untrue statement or misrepresentation is made in the bid forms,
attachments and other supporting documents submitted by the Bidder.
4.19 e-Reverse Auction will be conducted among the qualified bidders as per conditions of this tender.
4.20 To participate in e-Reverse Auction, bidders have to register on (n)Procure’s e-Auction Portal: https://e-
auction.nprocure.com.
4.21 After e-Reverse Auction process, L1 bidder shall be decided on lowest offered rate amongst other bidders
during specified e-Reverse Auction process.
5. VENDOR ELIGIBILITY CRITERIA:
1. Bidder should possess minimum three years of experience during last five years for metal spray work with
ARC/HVOF Spray Coating process in CFBC/ PF Boilers and should enclose the proof of the same. Also, Bidder
should have executed at least one work order for ARC/HVOF Spray Coating in CFBC boiler in last five years.
Bidder shall submit necessary evidence for the same like self-attested copies of work orders and Work
Execution / work completion certificates from clients. The work completion certificate shall comprise of Order
value & Executed value. Bidders should have executed the work directly. The work executed as a sub-
contractor or subletting agency shall not be taken in to consideration.
2. Bidder should produce evidence of having experience of successfully completed HVOF/ARC spray coating
works in CFBC/PF Boilers as defined hereunder for during last Five years ending last day of the month previous
to the one in which tender is invited, satisfactory progress of ongoing works etc. secured from clients along
TENDER NO.: SLPP/BLR/METAL SPRAY/ARC/26-28 Page
with self attested copies of documentary evidence preferably photo copies of work experience. The
experience should be either of the following:
The experience should be either of the following:
For ARC spray process:
a. One similar completed work each costing not less than the amount equal to Rs 15.75 Lacs including taxes
b. Two similar completed work each costing not less than the amount equal to Rs 10.50 Lacs including taxes.
c. Three similar completed work each costing not less than the amount equal to Rs 7.88 Lacs including taxes.
3. Contractor has to submit satisfactory performance certificate from the client for ARC/HVOF spray coating.
4. Bidder shall submit the Details of Coating Wires that consists of technical name, chemical composition, origin
of source, certificate from the supplier.
5. Tender fee: The tender fee shall be accompanied in form of RTGS.
6. EMD: The EMD shall be accompanied in the form of DD/RTGS or Bank Guarantee given by Bank.
7. Bidder should have separate Employees Provident Fund code number towards registration of firm with RPF
8. Attested copies of relevant tender documents duly signed & seal on each & every page shall be submitted.
9. Bidder should have average annual turnover of 7.88 Lacs (during last three financial years (2022-23, 2023-24
& 2024-25). Bidder shall furnish annual audited financial statement duly certified by Chartered Accountant
for the last three financial years to demonstrate the financial healthiness of the company. The balance Sheet
and Profit and Loss Account must be in the name of the company. Any type of MOU for this purpose will not
be entertained.
10. The bidder has to submit INCOME TAX Permanent Account Number (PAN) and GST number of the firm. Copy
of the same to be submitted.
11. The net worth of the bidder as on 31.03.2025 should be positive as evidenced from audited accounts.
12. In case Bidder is Consortium/Joint deed of undertaking of company, the above requirements/credential of
consortium leader/bidder shall be considered unless otherwise specifically mentioned in the tender.
ADDITIONAL PRE QUALIFICATION CRITERIA
13. If Bidder or its Partner(s) or Director(s) is /are/was in any Litigation(s), Court Case(s) or Arbitration(s), either
completed or under progress during last five (5) years or Black Listed / Deregistered / Stopped or banned from
dealing in the past by any Govt, of Gujarat Undertakings / Depts. / Authorities and Govt. of Gujarat supported
companies / undertakings / organizations, bid of that party will be liable to be rejected. Bidder agrees and
undertakes to accept decision of GIPCL in this regards as final and binding on the Bidder without any demur
and that no further correspondence shall be done in this regard at any stage.
TENDER NO.: SLPP/BLR/METAL SPRAY/ARC/26-28 Page
14. Bidder shall have to submit the “Declaration-cum-Undertaking for Compliance of Safety Laws and Regulations”
as amended in Annexure/ Form attached.
a. If any Fatal Accident / Violation of any safety law(s) / Rule(s) is / are found during the preceding Three (3) years,
Bid of that party will be liable to be rejected. Bidder agrees and undertakes to accept decision of GIPCL in this
regards as final and binding on the Bidder without any demur and that no further correspondence shall be
done in this regard at any stage.
b. If any of the details submitted in the prescribed Annexure / Form to the Bid is/are found to be false, incorrect
at any time in future, then the Contract awarded to that Bidder / Contractor shall be liable to be terminated
forthwith without any notice / correspondence and Bidder agrees and undertakes to accept decision of GIPCL
in this regards as final and binding on the Bidder without any demur and that no further correspondence shall
be done in this regard at any stage. Further, Performance / Security Deposit will also be liable to be forfeited.
Any dues to GIPCL from the Bidder / Contractor shall be recovered from the pending bills or any other dues
payable to the Bidder / Contractor, if any or otherwise through any other recourse available under the Laws.
6. LANGUAGE OF BID
The Bid prepared by the Bidder, and all correspondence and documents relating to the Bid exchanged by the
Bidder and the Company, shall be written in the English language. Any printed literature furnished by the Bidder
may be written in another language, provided that this literature is accompanied by an English translation, in
which case, for the purpose of interpretation of the Bid, the English translation shall govern.
7. EARNEST MONEY DEPOSIT (EMD) AND TENDER FEE
7.1 An EMD of Rs. 45,000.00 (Rupees Forty Five Thousand Only) and Non-refundable Tender fee Rs. 2950/-
(Rupees Two Thousand Nine Hundred Five Hundred only) shall accompany with Bid. Tender fee shall be
submitted through RTGS only.
7.2 The EMD shall be submitted in the form of DD/irrevocable Bank Guarantee in favor of Gujarat Industries Power
Company Limited from any Schedule Public Sector Bank or Schedule Private Sector Bank as per Performa of
BG enclosed with this e-tender.
Bank for EMD DD: Payable at :
1. Bank of Baroda Mosali, Dist: Surat
2. State Bank of India Nani Naroli, Branch Code:
3. Any Nationalized banks Surat
Alternatively, The EMD & Tender Fee may also be submitted through RTGS/NEFT/online mode of payment by
the bidders as per the details given below:-
BANK NAME: State Bank of India
BRANCH: Utility Building, Nani Naroli, Taluka Mangrol, Dist. Surat. Pin 394
IFSC CODE: SBIN0013423
BENEFICIARY NAME: Gujarat Industries Power Company Limited.
TENDER NO.: SLPP/BLR/METAL SPRAY/ARC/26-28 Page
7.3 In case EMD is paid in the form of BG, the same shall be valid for a period of 180 days after the due date for
submission of the bid
7.4 The EMD of the successful bidder will be returned after payment of Security Deposit by successful bidder.
7.5 The earnest money deposit will be refunded to the unsuccessful BIDDER as soon as the tender is finalized and
after award of LOI/Work Order.
7.6 Any bid not accompanied with EMD and Tender fee will be rejected. Tender fees and EMD should be submitted
7.7 No interest shall be payable on EMD.
7.8 The EMD will be forfeited if the BIDDER (i) withdraws his tender after acceptance or (ii) withdraws his tender
before the validity date of the tender.
8. SCHEDULE OF EMD & TENDER FEES
EMD & Tender fee and Address for Submission:
other documents to be CHIEF GENERAL MANAGER (THERMAL)
submitted in physical GUJARAT INDUSTRIES POWER CO. LTD.,
form within due date of (Surat Lignite Power Plant)
closing of the tender Village – Nani Naroli, Taluka – Mangrol
District – Surat 394 112, Gujarat
Contact Person: B.G.Gajjar (AGM-BMD,TG & BOP)
Email:[email protected]
9. SUBMISSION OF BID
A: MODE OF SUBMISSION
The bids shall be submitted online at the (n) Procure within the dates specified in the NIT along with the
details of tender fees, EMD in two parts as under:
(a) Pre Qualification and Techno-commercial bid without price
Note: Tender fee shall be submitted online Only and EMD to be submitted in physical form within due date of
the tender without fail. Bid received after due date is liable to be ignored.
(a) Pre Qualification and Techno-commercial bid without price
The tender document duly signed in all pages without price bid along with techno-commercial deviations, if
any shall accompany the bid. The following Information shall be provided in the techno commercial bid:
1. Eligibility criteria duly filled in Annexure-I.
2. Qualification and experience of site in charge, supervisors and engineers.
3. Schedule of deviation (Annexure- J) Technical as well as commercial, if any.
4. Electrical arc spray standard procedure followed by the party.
5. Electrical Arc wire technical specification.
6. Proof of experience meeting the minimum eligibility criteria
7. Performance certificate issued by clients.
8. Previous work order copies.
TENDER NO.: SLPP/BLR/METAL SPRAY/ARC/26-28 Page
1. Price bid shall be submitted only in soft form through (n) procure system.
Note: Estimated rates includes cost of all material and all manpower, equipments, vehicles, consumables, tools &
tackles, transportation, safety & statutory compliances, mobilization, contingency expenditure and
supervision charges etc.
2. GST/any other taxes & duties shall be paid extra at actual as per prevailing rate as declared by central
government on submission of documentary evidence. Taxes & Duties shall be quoted separately if applicable.
3. The quantities shown in the price bid are approximate for the contract period and may vary as per site
4. The Bidder shall fill the bid documents with utmost care in consonance with the instructions contained in the
The prices quoted are firm throughout the contract period and will not subject to any variation whatsoever.
(c) E-Reverse Auction:
In (n)Procure system provision may be made ARC process for reverse Auction.
1. For conducting e-Reverse Auction, lowest 50% out of total eligible Bidders (rounded to the next higher whole
number) or Minimum three (03) eligible bidders (L1 to L3) will be invited.
2. L1 value will be declared through (n)Procure’s e-Auction Portal: https://eauction.nprocure.com to start e-
Reverse auction process and final received lowest auction price in the value by e-Reverse auction process will
be the final L1 price.
3. Minimum decremental value for the e-Reverse auction will be set by GIPCL prior to start of e-Reverse auction
and this will be applicable during each reverse Bid.
4. Duration for the e-Reverse auction will be 1 Hours with provision of extension for further 15 Minutes at every
single reverse bid received during the last 05 minutes, till there is no further reverse bid entry by the
participating Bidders.
1. Final quantity to be awarded shall be decided by GIPCL at the time of award of contract.
2. Payment shall be made based on actual quantity executed.
B: METHOD OF TENDERING/SIGNATURE OF BIDS
(i) The Bid must contain the name, residence and place of business of the person or persons making the Bid and
must be signed and sealed by the Bidder with his usual signature. The name of all persons signing should also
be typed or printed below the signature on each page.
(ii) Bid by a partnership firm must be furnished with full names of all partners and be signed with the partnership
name, followed by the signature and designation of one of the authorized partners or other authorised
TENDER NO.: SLPP/BLR/METAL SPRAY/ARC/26-28 Page
representative(s). A certified copy of the power of attorney authorizing such partner or representative shall
also be submitted.
(iii) Bids by a Corporation/Company must be signed with the legal name of the Corporation/Company by the
President, Managing Director or by the Secretary or other person or persons authorised to Bid on behalf of
such Corporation/Company in the matter. A certified copy of the board resolution/power of attorney
authorising such partner or representative shall also be submitted.
(iv) The Bidder's name stated on the proposal shall be the exact legal name of the firm.
(v) Erasures or other changes in the Bid Documents shall be initialled by the person signing the Bid.
(vi) Bids not conforming to the above requirements of signing may be disqualified.
10. SCHEDULE OF DEVIATIONS
Whenever bidder deviates from the specifications the same shall be listed out in the “Schedule of Deviation”
attached as ANNEXURE-J to these specifications. Only those deviations, which are listed in this Annexure, shall
be considered. Deviations indicated elsewhere will be rejected.
11. INFORMATION REQUIRED WITH THE BID
Bidder should clearly indicate along with details called for in the bid, the plants where he has undertaken
similar work as also certificates from clients.
12. MODIFICATION & WITHDRAWAL OF BID
12.1 The Bidder may modify or withdraw its bid prior to the deadline prescribed for submission of bids.
12.2 No Bid shall be modified subsequent to the deadline for submission of Bids.
12.3 No Bid shall be withdrawn in the interval between the deadline for submission of Bids and the expiration of
the period of bid validity specified by the Bidder on the Bid Form.
13. POLICY FOR BIDS UNDER CONSIDERATION
a. Bid shall be deemed to be under consideration immediately after opening of the bid and till official intimation
of award/rejection made by the Company to the Bidders.
b. While the Bids are under consideration, Bidders and I or their representative or other interested parties are
advised to refrain from contacting by any means, the Company.
The Engineer, if necessary, will obtain clarifications on the Bids by requesting for such information from any
or all the Bidders, in writing as may be necessary. The Bidder will not be permitted to change the price or
substance of the Bid after the Bid has been opened.
14. EFFECT AND VALIDITY OF THE BID
a. The Bid should be kept valid for acceptance for a period of one hundred and eighty (180) calendar days from
the last date of submission of Bids.
b. The submission of any Bid along with the required documents and specifications shall constitute an agreement
that the Bidder shall have no cause of action or claim, against the Company for rejection of his Bid. The
Company shall always be at liberty to reject or accept any Bid or Bids at his sole discretion and any action will
not be called into question and the Bidder shall have no claim in that regard against the GIPCL.
TENDER NO.: SLPP/BLR/METAL SPRAY/ARC/26-28 Page
15. UNDERSTANDING AND CLARIFICATION ON DOCUMENTS AND SPECIFICATION
The Bidder is required to carefully examine the specifications and documents and fully inform himself as to all
the conditions and matters which may in any way affect the 'Works' or the cost thereof. If any Bidder finds
discrepancies or omissions in the specifications and documents or is in doubt as to the true meaning of any
part, he shall get clarified during techno-commercial discussion.
16. OPENING OF BIDS
16.1 Technical bid/price bid, will be opened by the authorized officers of GIPCL.
16.2 Preliminary Examination
16.3 The owner will examine the Bids to determine whether they are complete, whether any computational
errors have been made, whether required sureties have been furnished, whether the documents have
been properly signed and whether the Bids are generally in order.
16.4 Arithmetical errors will be rectified on the following basis,
(a) If there is a discrepancy between the unit price and the total price that is obtained by multiplying the
unit price and quantity, the unit price shall prevail and the total price will be corrected & will be binding to
(b) If there is a discrepancy between the Total Bid Amount and the sum of total prices, the sum of total
prices shall prevail and the Total Bid Amount will be corrected & will be binding to the bidders.
17. EVALUATION & COMPARISON OF BIDS
17.1. GIPCL shall evaluate the Bids received and accepted by it to ascertain the lowest evaluated Bid in
conformity with the specifications of the tender documents.
17.2. The Technical Bids will be examined and will be classified into two categories (viz.)
(a) Bids which are acceptable as they are or which with some modifications can be made acceptable.
(b) Bids which are completely unsuitable and which cannot be made acceptable by modifications. These
Bids will be rejected.
17.3. Those Technical Bids for which it is possible to do so will be brought to an acceptable level of conformity
with the technical specifications through direct correspondence and/or negotiations with the Bidders.
17.4. All responses to requests for clarifications shall be in writing and shall be presented to the Company
through e-mail or in a sealed envelope on or before the given date requested by the Company. If the
Technical clarifications sought by the Company do not reach the Company on or before due date, the bid
will be rejected.
17.5. The comparison of all the Bids shall be carried out with reference to similar scope of work as per the
technical specification. Any deviation/omission shall be evaluated at highest quoted price of the
deviation/omission quoted by any of the Bidder. In case a separate price (for omission) is not given by any
other Bidder, a reasonable price of the same shall be taken.
17.6. The commercial deviation, if any, shall be loaded to bring all the bids at par. The loading shall be carried
out at an interest rate as 2% above PLR of SBI.
TENDER NO.: SLPP/BLR/METAL SPRAY/ARC/26-28 Page
17.7. A bid to be substantially responsive shall be one which on evaluation confirms to all the terms, conditions
and specifications of the bid documents without any material deviation or reservation.
17.8. For the above referred purpose, a ‘material deviation’ shall be one which:
(a) Which affects in any substantial way the scope, quality or performance of the contract, or
(b) Which limits in any substantial way and in a manner inconsistent with the bid documents, GIPCL’s right
or the bidder’s obligations, under the contract, or
(c) Whose rectification would affect unfairly the competitive position of other bidders presenting
substantially responsive bids.
17.9. In the event of item rates to be quoted by the Bidders for unforeseen works, which are not taken into
consideration for evaluation, the lowest responsive bidder will be required to accept the lowest workable
rates offered by other bidders. This will be a pre-condition for award of the work to the lowest responsive
18. RIGHT OF REJECTION OF TENDERS
18.1 GIPCL reserves the right to accept or reject any bid or to cancel the Bidding process and reject all bids at any
time prior to award of contract, without thereby incurring any liability to the affected bidder or bidders or
any obligation to inform the affected bidder or bidders regarding the same.
18.2 Any Tender without EMD and Tender fee will be treated as non responsive and shall be rejected at the outset
18.3 GIPCL reserves the right to split the scope & quantity to more than one agency among the bidders.
18.4 GIPCL reserves the right to debar any bidder from participation in future bids if such bidder has quoted an
abnormally low rate in the bid document/price bid.
19. AWARD OF CONTRACT
19.1 GIPCL will award the contract to the bidder whose quotation has been determined to be substantially
responsive and evaluated as the lowest quotation in conformity with the requirements of the specifications
and documents contained herein, provided further that the bidder is determined and evaluated to be
qualified to perform the contract satisfactorily.
19.2 The successful bidder shall be intimated of his selection through the Letter of Intent or Letter of Award/
Work Order which shall be sent to him through e-mail, courier, fax or registered mail.
19.3 GIPCL reserves the right to cancel/short close the contract during the contract period without assigning any
19.4 GIPCL reserves the right to split the contract quantity between vendors.
20. PERIOD OF CONTRACT
20.1 The Contract period will be for the period of Twenty-Four (24) Months from the date of actual
commencement of operation of the contract as stated in the work order.
20.2 GIPCL reserve the right to extend the contract duration for the period of 3 months at same rates and terms
& conditions of the contract without any price escalation and entering into any new contract.
TENDER NO.: SLPP/BLR/METAL SPRAY/ARC/26-28 Page
20.3 The said Contract Period can be extended if mutually agreed upon by both the parties up to one (01) year
and in such a case a revised work order shall be issued at the same rates and terms & condition or at
negotiated rates acceptable by both parties i.e. the Company & the Contractor.
21. Time schedule/Completion Period
Timely completion of the job within the scheduled time is most essence of this contract.
Max. time of completion is 3.0 hrs. / sq. meter after clearance given from GIPCL Engineer In-charge.
Hence bidder should furnish the details of machines, material and manpower they are going to deploy and
how they are ensuring the completion of above quantity of job within above time frame.
During shut down many agencies are working at site, hence contractor shall properly co-ordinate with
other agencies and complete their job.
In case of delay in executing the contract by contractor, GIPCL reserves the right to engage another
contractor and complete the balance job at the risk and cost of the contractor.
Contractor should submit their field quality plan to EIC before starting the work. Contractor should submit
the complete bar chart with applicable machine and manpower to establish how they are going to
complete the job within scheduled time.
22. ASSIGNMENT AND SUB-LETTING
The Contractor shall not directly or indirectly assign or sub-let total/any part of the contract to any other
party or agency.
23. GUARANTEE PERIOD
Guarantee period for the product used and workmanship shall be minimum two (02) years from the date
of application of metal spray. In case of failure of metal spray during the guarantee period, party to repair
free of cost at suitable time informed by GIPCL.
24. CONTRACTOR’S OBLIGATIONS
A: DEPLOYMENT & RESPONSIBILTY OF MANPOWER
(i) The Contractor shall deploy manpower suitably qualified and sufficiently numbered for the due and timely
execution of the works under the contract.
(ii) The Contractor shall deploy sufficient skilled, Semi-skilled and Un-skilled manpower like technician, helper,
rigger, welders, cutter, electrician, store keeper etc. to properly complete the job in given time.
(iii) The Contractor shall depute its own workmen with proper identification to enter the plant premises after
ensuring that the jobs are scheduled.
(iv) At the time of deploying manpower, the Contractor shall strictly comply all the applicable labour laws/Acts
norms including but not restricted to the age of the workers, women workers and shall also ensure that a
police verification and security check for all the workmen engaged at the GIPCL site is done and necessary
TENDER NO.: SLPP/BLR/METAL SPRAY/ARC/26-28 Page
documents regarding the same shall be submitted to the GIPCL’s authorized representative/officer-in-
charge. Any default in complying with the same or any misrepresentation regarding compliance of the
same shall entitle GIPCL to initiate appropriate civil or criminal proceedings regarding the same.
(v) The Contractor shall also be required to comply with the safety requirements and provide his workmen
with safety equipment like helmets, masks, gum boots, a uniform and other necessary PPEs for properly
undertaking the operations involved under this contract. Following are also to be issued:
a) Safety shoes/gum boot
b) Goggles / face shield.
c) Ear plug / Ear muff.
d) Hand gloves like electrical hand gloves / cotton hand gloves / Chemical hand gloves/Apron
(vi) Contractor shall nominate /authorise senior experienced person in writing as site in charge to co-ordinate
with GIPCL engineer and who shall bear overall responsibility for performance of the contract. Such person
shall remain present at site office allotted
to the contractor at SLPP site. Contractor has to submit the authority letter and documentary proof for the
(vii) The Contractor shall appoint a supervisor who shall co-ordinate with GIPCL’s Engineer In Charge for daily
maintenance job. They have to maintain daily job register and duly certified by engineer in charge. The
Contractor in co-ordination with the Engineer-In-Charge shall ensure the availability of adequate
manpower on a daily basis. As per the instruction of engineer in charge they have to allot the work and
execute the same in specified time.
(viii) During execution of the works, one or more jobs may be required to be done simultaneously and the
Contractor shall mobilize additional resources accordingly.
(ix) During emergency or similar situations, the Contractor shall be required to mobilize resources as per need
within the period of 24 hours as directed by GIPCL. If the contractor fails to mobilize sufficient manpower
to complete the job in time, GIPCL will execute the job through other agency at the risk and cost of the
(x) Contractor should mobilize sufficient number of manpower and execute the work in two shifts with
independent manpower. Contractor should not continue the same manpower more than 12 hours.
B: TOOLS & TACKLES AND CONSUMABLES
(i) All special equipment like, Metal spray torches/guns, powder feeder, tool and tackles like grit blasting
machine, hoses, flow measuring panel required to execute metal spray application work are in scope of
contractor. For timely execution of job, the contractor is required to maintain above equipment in good
working condition at site. They should maintain sufficient spares for repairing the equipment.
(ii) All tools and tackles to execute the contract are in the scope of the contractor. The contractor should
ensure that tools are in healthy condition. All consumable items i.e. cloth, cotton waste, kerosene oil, gases
(Oxygen, D/A, Argon), welding electrode, etc. would be in the scope of the contractor.
Note: the welding electrode should be approved make i.e. Advani, Oerlikon, ESAB, D&H, L&T.
(iii) The failure /defects of equipment due to improper method of maintenance, equipment assembly due to
contractor negligence, and the losses will be recovered from contractor’s bills.
(iv) Arrangement for lighting at the work spot has to be made by the contractor. He has to arrange all lighting
equipment such as power cable, hand lamps. The contractor has to take prior approval for taking electrical
power supply. The contractor should keep hand lamps of 24Volt, 240 Volt and sufficient quantity of halogen
TENDER NO.: SLPP/BLR/METAL SPRAY/ARC/26-28 Page
(v) Electrician/supervisor should ensure that the cable connection is not in loose condition, which may cause
any damage or failure to the machine/manpower. Pin sockets of IS standards should be used for all
(vi) The Contractor must ensure that all the generated scrap, cotton waste, waste oil, tools and tackles,
chemical wastage are removed from the site immediately and he must ensure cleaning of the site. Further,
these items should be disposed off to the scrap yard or any other designated place as instructed by
Engineer In Charge. In case of heavy weight items, if required transportation may be arranged by the GIPCL
at the discretion of the engineer in charge. If the scrap removal is not done within the stipulated time given
by GIPCL Engineer, the scrap will be removed by GIPCL at the Contractor’s cost with penalty and it will be
deducted in the bill.
(vii) Insulation scrape materials like glass wool, ceramic wool etc. should be collected in gunny bags with proper
care and then disposed at a suitable location as per the instruction of engineer in charge.
(viii) It is the responsibility of site incharge to segregate and remove the scrap from site. Work will be certified
by E-I/C only after removal of scrap to the scrap yard.
25. CLARIFICATION OF BIDDING DOCUMENTS
If any Bidder requires any further information or clarification in the Bidding Documents, may notify the
Company before one week of last date of submission of online Bid, in writing or by E-mail at the GIPCL's
mailing address [email protected] as indicated in the 'Invitation to Bids'. The GIPCL's response (including
an explanation of the query) will be sent in writing or by E-mail to all prospective Bidders who have received
the Bidding Documents.
26. UNDERSTANDING AND CLARIFICATION ON DOCUMENTS AND SPECIFICATION
The Bidder is required to carefully examine the specifications and documents, all the conditions and
matters work wise & cost wise. If any Bidder finds any discrepancies or omissions in the specifications and
documents or is in doubt for any meaning of any part, he shall request in writing for an interpretation/
clarification to the GIPCL.
All such interpretations and clarifications shall form a part of the Bid documents.
27. TERMS OF PAYMENT
All the payments against the work order shall be in Indian currency and payable through cheque/RTGS
A. Conditions of Payment:-
The contractor shall raise the invoice in duplicate in respect of the work performed or completed along
with the documents as hereinafter provided. On receipt of the invoice complete in all respects and with all
the said documents, the payment for the supply and for the work executed shall be made within 21 days
thereafter as per the following terms of payment-
1. 100% payment against the work executed duly certified by GIPCL E-I-C and on submission of PBG.
2. GST shall be paid along with bills after fulfillment of following terms:
TENDER NO.: SLPP/BLR/METAL SPRAY/ARC/26-28 Page
(a) Submission of copy of registration certificate issued by GST (to be furnished only once).
(b) Citing the GST no. And the date of issue of registration certificate on invoices.
(c) Claim of GST amount with percentage (%) separately shown on the invoices.
(d) The contractor shall be required to submit the proof of payment of GST of previous month/quarter, as
may be applicable as & when demanded by GIPCL/Owner/company.
(e) The Bidder shall inform the Owner in the event its registration certificate is cancelled or discontinued
for whatsoever reason.
(f) Final Bill shall be submitted along the Indemnity Bond and “No Claim No Arbitration” certificate as per
format given in Annexure – D & Annexure - E
B. Validity and Uniformity of Rates
The rates shall be valid for the Contract Period or the Contract Period and shall remain unaltered during
the entire Contract Period.
Item rates quoted, shall include cost of all consumables,( except free issue materials by GIPCL) labour,
supervision, tools & tackles, transport and any such other costs excluding statutory taxes as are not
specifically mentioned herein, but may be incurred by the contractor for the satisfactory and timely
completion of the work.
C. Deductions from Contract Price
All costs, charges or expenses payable by the Contractor under the terms of the contract or as per the
applicable laws, in respect of which he makes default in payment, shall be the liability of the Contractor.
Such amount or due may be paid by the Company and the Company shall be entitled to recover the same
from the Contractor by deducting the said amounts from the Contractor’s bills.
28. WORK MEASUREMENT / CERTIFICATION
1. The work is of specialized nature and the contractor should be fully conversant with modern practices and
should be able to carry out Metal Spray application independently. The contractor shall therefore be
required to engage qualified / experienced personnel.
2. Contractor supervisor shall co-ordinate with engineer in charge at every stage to ensure quality during
metal spray application processes like, surface roughness test after grit blasting, coating thickness testing
3. Ensuring the hardness of metal spray coating min 60HRC to 70 HRC. Suitable sample coupons to be fixed
as stated in the tender and establish the hardness.
4. The contractor shall be required to furnish satisfactory job completion report to GIPCL. The contractor shall
submit coating thickness report/Hardness report, after completion of work. Payment shall be released
based on the certified reports of the works.
The quantities specified are estimated and for tendering purpose only. Payment will be made, based on
actual work done as certified by Engineer-in-charge of GIPCL.
TENDER NO.: SLPP/BLR/METAL SPRAY/ARC/26-28 Page
Quantities of individual items may be revised during the course of contract period based on site
requirement. Contractor shall not be entitled for any compensation on ground of such alteration in scope
of work. GIPCL reserves the right to operate or increase/decrease quantities in each item or omit any item
included in Schedule of Quantity at his discretion.
Contractor shall have no claim, whatsoever, on grounds of loss of anticipated profit etc. on account of the
After commencement of the work, GIPCL, for any reason may not require to be carried out the whole/part
of the work as specified in the tender, the ENGINEER-in-charge shall inform the fact for thereof to the
CONTRACTOR and contractor shall have no claim for any payment or compensation whatsoever on account
of any profit or advantage which he might have derived from the execution of the work in full but which
he did not derive in consequence of the full amount of the work not having been carried out nor shall he
have any claim for compensation by reason of any change having been made in the original specifications
and instructions which shall involve any curtailment of the work as originally contemplated.
TENDER NO.: SLPP/BLR/METAL SPRAY/ARC/26-28 Page
INSTRUCTIONS TO BIDDERS FOR ONLINE TENDERING
Bidders who wish to participate in this tender will have to procure or should have legally valid Digital Certificate
(Class III) as per Information Technology Act-2000, using which they can sign their electronic bids. Bidders can
procure the same from any of the license certifying Authority of India or can contact (n)code solutions-a division
of GNFC Limited, who are licensed Certifying Authority by Government of India at address mentioned below
Bidder may go through the e-tendering instruction for online Bid participation through n-procure platform for
further details and guidance for participation in the tendering process through e-tendering. In case of any
queries related to e-tendering system, Bidder may write/contact at following details:
(n) Code Solutions – A division of GNFC Ltd.
301, GNFC Info tower, Bodakdev,
Ahmedabad – 380 054 (India)
E-mail: [email protected]
www.nprocure.com
Bidder may visit https://www.nprocure.com/html/faq.asp for information regarding e-tendering
registration process
Tender document is available only in electronic format. Bidders can download free of cost from the (n)Procure
portal (www.nprocure.com).
All Bids Pre-Qualification / Techno-commercial bid (Part-1) and Price Bid (Part-2) shall be submitted Online
through the (n)Procure portal (www.nprocure.com). The Part-1 of Bid may be submitted in Physical form also
but Part-2 shall be submitted Online only. Physical submission of Price Bid will not be entertained. Also no fax,
e-mail, letters will be entertained for the same.
Following should be submitted ‘off-line’ in sealed covers separately during dates & time set in ‘NIT’ at our Office
at Village: Nani Naroli, Taluka: Mangrol, Dist.: Surat - 394 110, Gujarat:
Supporting Documents for Technical Bid
To participate in e-Reverse Auction, Bidders have to create e-Auction USER ID on
www.auction.nprocure.com and it is mandatory to submit the same along with physical
Techno-commercial Bid; so that the Bidder shall be allowed to participate in the e-Reverse Auction.
Bidders who wish to participate first time in Online tenders will have to register their firm at GIPCL-SLPP by
applying for registration through ‘Vendor registration option’ available in the website -
http://etender.gipcl.com/ at least before five (5) working days from the due date set for Online Bid
participation. GIPCL will not be held responsible in case of late submission for Vendor registration. Bidders shall
fill the online vendor registration form and submit it online. GIPCL will create ‘Vendor Code’ which will be used
as user ID for online participation in GIPCL’s tenders. Both vendor code (user ID) and password will be
generated automatically and will be sent by auto generated e-mail to Bidder’s official e-mail account as
provided by Bidder in vendor registration form.
TENDER NO.: SLPP/BLR/METAL SPRAY/ARC/26-28 Page
REVERSE AUCTION
1) GIPCL reserves the right to conduct E-Reverse auction through (n) Procure platform.
2) E-Reverse auction shall be conducted amongst (a) the lowest 50% eligible bidders (rounded to the next higher
whole number) from the total bids received OR (b) Minimum three (03) lowest bidders, whichever is higher,
shall be invited for participation in eReverse Auction through n-procure platform.
3) Opening Price, Detrimental value and duration for the e-Reverse Auction shall be informed to the qualified
bidders before start of e-Reverse Auction.
4) After e-Reverse Auction process, L1 bidder shall be decided on Lowest Total Contract Price.
5) To participate in e-Reverse Auction, Bidders have to create e-Auction USER ID on https://e-
auction.nprocure.com that the bidder shall be allowed to participate the e-Reverse Auction.
6) In case of any further information regarding online bidding or if a Bidder needs any assistance in accessing/
submission of online bid/ clarification or if training is required for participating in online e-reverse bidding, then
the Bidder can contact the following office for assistance or training:
(n) Procure Cell, (n) code solutions-A division of GNFC Ltd.,
403, GNFC Info tower, S.G. Road,
Bodakdev Ahmedabad – 380054 (Gujarat)
Fax: 079-26857321 / 40007533, Email: [email protected]
Bidder may visit https://www.nprocure.com/html/faq.asp for information regarding e tendering registration
TENDER NO.: SLPP/BLR/METAL SPRAY/ARC/26-28 Page
GENRAL CONDITION OF CONTRACT
1. CONTRACT PERFORMANCE GUARANTEE (SD)
1.1. The successful Bidder, to whom the work is awarded, shall be required to furnish a Contract Performance
Guarantee/Security Deposit (SD) as security for the due performance of the Contractor’s obligations.
1.2. The said SD shall be submitted in the form of a Bank Guarantee as per Annexure-B attached herewith and
the same shall be obtained by the Bidder in favour of the Owner within 21 days from the date of Letter of
Intent (LOI)/Work order/Contract whichever is earlier from
All Nationalized banks, IndusInd bank,
Axis bank, Federal Bank
ICICI bank, Bandhan Bank
HDFC bank IDBI Bank
Kotak Mahindra Bank, KARUR Vysya bank
The SD amount shall be equal to ten percent (10%) of “Annualized Contract Price” (excluding taxes and
duties) and it shall guarantee the faithful performance of the 'Contract' in accordance with the terms
and conditions specified in these documents and specifications. To safeguard contract abandonment,
Successful bidder’s EMD to be converted to Contract SD.
1.3. The performance guarantee shall be valid for the period of 24 months from the completion date of
application of metal spray and claim period of BG shall be up to 3 months from completion of
Guarantee period. If claim period is not given by the bank, BG should be valid for Guarantee period
plus three months. The Guarantee amount shall be payable to the Owner in Bidder's home currency
without any condition whatsoever.
1.4. However, any delay in submission of initial SD will entitle the Company to cancel the contract /will result
in equivalent late release of entire SD after SD retention period. i.e. the duration of the validity of the
SD shall be extended by the number of days by which the Bidder delays in submitting the SD.
1.5. The amount of SD/Performance Guarantee will be returned to the Vendor/Contractor without any
interest at the end of the 'Guarantee Period' subject to and after deduction of any amounts duly
recoverable by the Owner hereunder.
In case of failure to adhere to the time schedule by the contractor penalty will be levied at the discretion
of GIPCL- Engineer in charge considering extent of delay in particular job. LD @ 0.5% of executed
contract value with GST per day for the delayed job shall be deducted from the contractor’s bill.
However, LD amount shall not exceed 10% of the executed contract value with GST for the given boiler.
LD shall be levied unit wise separately.
3. RECOVERY CLAUSE
(i) In case of any damage of equipment/machinery due to negligence of contractor or any other reasons
attributed to contractor the decision of Engineer in Charge regarding the amount of recovery shall be
TENDER NO.: SLPP/BLR/METAL SPRAY/ARC/26-28 Page
final and binding. However, the amount shall be restricted to 10% of contract value. Recovery will be
affected from the monthly bills and/or retention money/security deposit.
(ii) If the contractor fails to execute the work as per directions of GIPCL’s Engineer (I/c) within the time
frame given. GIPCL shall get the work done by third party at the risk & cost of contractor.
4. DEDUCTIONS FROM CONTRACT PRICE
All costs, charges or expenses which GIPCL may have paid for which, under the contract the contractor
are liable, will be claimed by GIPCL. All such claims shall be paid by the contractor within 15 days failing
which the same shall be deducted from the contractor’s bills.
5. TERMINATION OF CONTRACT BY GIPCL
Contractor shall be responsible to complete the jobs within agreed time schedule and in case contractor
fail to complete the job, GIPCL shall recover from his bill, Security Deposit and / or whatsoever for
expenses incurred to complete the job with additional 15% overhead charges.
In case if contractor’s services are not found satisfactory with respect to mobilization, time bound
completion of work, workmanship & safety (OHSAS policy of GIPCL) then GIPCL has right to terminate
the contract at any time by giving him 7 days advance notice without assigning any reason and will make
the alternate arrangement at the risk & cost of contractor.
GIPCL may terminate the contract after due recoveries of pending jobs/damages after giving 7 days
advance notice to the contractor if any of the following events occur –
i. Contractor is adjudged as insolvent.
ii. Contractor has abandoned the contract.
iii. Contractor fails to proceed with the work with due diligence as per requirements of the contract.
iv. Contractor has neglected or failed persistently to observe or perform any of the acts, matters or
things, which as per the contract are to be observed and performed by the contractor.
v. Contractor repetitively violating the safety norms for more than three incidents.
vi. Any major contradiction of applicable labour laws.
vii. Any major deviations from contractual terms and conditions including quality of job.
6. FAILURE & TERMINATION
If the CONTRACTOR after receipt of written notice from the GIPCU ENGINEER requiring compliance,
with such further drawings and I or the GIPCL /ENGINEER instructions fails within seven days to comply
with the same, the GIPCL /ENGINEER may employ and pay other agencies to execute any such work
whatsoever as may be necessary to give effect thereto and all costs incurred in connection therewith
shall be recoverable from the CONTRACTOR by the GIPCL on a certificate by the GIPCUENGINEER as a
debt or may be deducted by him from any money due or to become due to the CONTRACTOR.
If the contractor fails to execute the work or fails to mobilize the resources and equipments as per
directions of GIPCL I ENGINEER within the time frame given and/or violating the GIPCL's safety rules &
regulations, ENGINEER/ GIPCL shall get the work done by third party at the risk & cost of the
TENDER NO: SLPP/BLR/METAL SPRAY/ARC/26-28 Page
CONTRACTOR with additional 10% overhead charges of GIPCL and all costs incurred in connection
therewith shall be recoverable from the CONTRACTOR by the GIPCL /ENGINEER as a debt or may be
deducted by him from any money due or to become due to the CONTRACTOR.
7. SETTLEMENT OF DISPUTES
a. Any disputes or difference between parties arising out of the contract to the extent possible shall
be settled amicably between the parties. If amicable settlement cannot be reached all the disputed
issues shall be resolved through arbitration according to the provisions of Indian Arbitration Act,
1996. The place of arbitration shall be at Surat.
b. Work under the contract shall be continued by the contractor during arbitration proceedings unless
GIPCL shall order suspension thereof or any part thereof in writing or unless the matter in such work
cannot possibly be continued unless the decision of the Arbitration proceedings is obtained.
8. INTERPRETATION OF CLAUSE
In case of disputes as regards interpretation of any of the clauses or specification, the decision of GIPCL
will be final and binding on the contractor.
9. EMPLOYEE’S COMPENSATION INSURANCE
The contractor shall take all risk Insurance Policy to cover all his workmen, staff applicable under the
Workmen Compensation Act 1923 or any amendment thereof also insurance cover for third party
liability. The contractor shall keep GIPCL indemnified from all liabilities arising out of his action in
pursuance of this contract. The W. C. Policy should be obtained from Surat Jurisdiction and shall be
assigned to GIPCL-site.EC policy should cover the specified contract period.
Contractor shall also obtain additional off-duty coverage insurance policy for all his workers.
10. ASSIGNMENT AND SUBLETTING OF THE CONTRACT
The contractor shall not assign or sub-let any part of the contract to any other party or agency.
11. STATUTORY REQUIREMENT:
a. COMPLIANCE OF LABOUR LAWS
The contractor shall at his own cost comply with the provision of labor laws, rules, orders and
notifications whether central or state or local as applicable to him or to this contract from time to time.
These Acts/Rules include without limitation of the followings.
1. Contractor shall be solely responsible and shall fully comply with all the provisions of all the labour laws
applicable such as the Minimum Wages Act, 1948, Contract Labour (Regulation & Abolition) Act
Factories Act, 1948, Payment of Bonus Act 1965, Employees Provident Fund and Miscellaneous
Provision Act 1952, Industrial Dispute Act 1947, Employees Compensation Act 1923, Payment of
Gratuity 1972, Interstate Migrant Workmen Act 1979, Equal Remuneration Act with Rules, Order and
Notifications issued/made there under from time to time.
TENDER NO: SLPP/BLR/METAL SPRAY/ARC/26-28 Page
2. All other Acts, Rules/Bye-Laws, Orders, Notifications etc. present or future applicable to the contractor
from time to time for performing the contract job.
2.1 The Contractor shall provide and be responsible for payment of Wages, Salaries, Bonus, Social charges,
Insurance, Food, Accommodation, Transport, Medical and Canteen facilities and other statutory
privileges and facilities to his personnel as per law/rules/regulations and orders of the Central
Government, State Government, Local Authorities or other authorities as are in force from time to time.
All persons engaged by the Contractor for the performance of the obligations and works under the
contract shall be his workmen only.
2.2 The contractor shall have a valid labor license obtained from Licensing Authority under the Contract
Labor (Regulation & Abolition) Act-1970 at the time of execution of the contract covering all his
employees working at SLPP site and furnish the same to GIPCL before commencement of work failing
which GIPCL may terminate the contract at its sole discretion.
2.3 The Contractor shall at the time of execution of the contract have a EPF Code Number obtained from
the Authorities concerned under the Employees Provident & Miscellaneous Provisions Act, 1952 and
remit contributions in respect of the workmen employed by him at SLPP Site to the P.F office concerned
every month failing which GIPCL may pay the same and GIPCL will recover the amounts so paid by it
from the outstanding amounts payable by it to the Contrator.PF code of Gujarat region should be taken.
2.4 The Contractor shall duly maintain all records/registers required to be maintained by him under various
labour laws mentioned above and shall produce the same before the concerned Statutory Authorities
whenever required and called upon to do so.
2.5 The Contractor shall also submit periodical reports/returns to the various statutory authorities under
the Contract Labour (Regulation & Abolition) Act-1970, Employees Provident Fund Act etc. under
intimation to HR&Admn.Dept. of GIPCL.
2.6. The Contractor shall not pay less than the Minimum Wages notified by the Government from time to
time to his employees of corresponding categories.
2.7. The Contractor shall be responsible for payment of overtime wages to his workmen, if any, in case they
are required to work beyond the prescribed hours under law as per applicable rates.
2.8. The contractor shall take Workmen Compensation Insurance Policy for all his employees working at
GIPCL. The contractor shall indemnify the company against any liability due to any work injury or
accident to any of its employees.
2.9. The Contractor shall in the event any of his workmen I employee sustains any injury or disablement due
to an accident arising out of and in the course of his employment, provide necessary medical treatment
and pay compensation as applicable, required under the Workmen's Compensation Act,
2.10. If any of the persons engaged by the Contractor misbehave with any of the officials or the Company or
commit any misconduct with regard to the property of the Company or suffer from any serious
communicable disease, the Contractor shall replace them immediately. 2.11. The Contractor shall not
engage I employ persons below the age of 18 years. Employment of women shall be strictly according
to applicable laws.
2.12. GIPCL will have right to deduct and disburse the claims of the individual parties being a principal
employer on any account whatsoever in relation to their employment with the contractor. The Security
deposit will be released to the contractor at the end of the contractual tenure subject to an undertaking
by the contractor that in the event any of his workmen or the heirs of workmen puts up a claim for
recovery of money due to him from the contractor before the appropriate authority under the I.D.Act
TENDER NO: SLPP/BLR/METAL SPRAY/ARC/26-28 Page
1947 or under any other labor laws or for compensation under the Workmen's Compensation Act,
and the appropriate authority has given a direction for making payment the contractor will meet the
same or indemnify GIPCL if in the event GIPCL pays it as Principal Employer.
2.13. The contractor shall make payment of wages to his employees on fixed date within the period specified
under the applicable Law, in presence of representative of the company. He will submit a true copy of
wage sheet, attendance register and P.F. remitted challans on monthly basis to HR&A dept. for
verification and record.
2.14. The Contractor shall provide Safety items I kits to his employees such as safety shoes, goggles, ear plugs,
hand gloves, safety belts etc., if any, required under the law.
2.15. The contractor shall conduct pre-induction and periodic medical checkup of his workmen as per
applicable laws.
2.16. The contractor shall be solely responsible for any accident caused to his workers and should adhere to
all rules I regulations as per labor laws of Government and other statutory laws as applicable.
2.17. The contractor should register himself under the Contract Labor Act, Employee Compensation Act and
PF Act {Code no. to be mentioned) and submit the copy of registration certificate and should possess
the same from the date of commencement of work, failing which the contract is liable to be cancelled.
The E.C. Policy copy should be submitted to the GIPCL before commencement of the work and Labor
License should be obtained within one week from the date of issue of form-V. Contractor should apply
for Form-V immediately after receipt of LOI. A copy of Labour License shall be submitted to GIPCL, HR
& A Department.
2.18. Contractor shall have to insure his workmen /supervisors etc. under Group Insurance scheme.
2.19. The Contractor shall be responsible for compliance of all statutory rules, regulation, act enforced from
time framed by the government such as Factory Act, Employee Compensation Act, payment of 'Wages
Act', Minimum Wages Act', Provident Fund Act, All Labor Laws Act in respect of employees engaged by
him for the work and shall have to maintain necessary records. In case any amount becomes due to be
payable by him to his employees or to the Government under the above rules, regulation, Acts, GIPCL
reserves the right to recover the same from the running bill of the contract.
2.20. Documentary evidence of deposit of PF paid shall have to be produced by the contractor along with the
2.21. Records as per the provisions of various statutory Acts will have to be maintained by the contractor and
submitted as and when required.
2.22. All employees of contractor should maintain due discipline and respect local sentiments. GIPCL reserves
the right to direct the contractor to remove any such person who does not comply with it.
2.23. The list is indicative in nature and not an exhaustive one. Any amendment/alteration/Notifications or
addition to the existing Law or a new statute shall automatically and immediately become applicable.
2.24. Annual Health Check Up:- As per statutory requirement, Contractor has to inform workmen deployed
at site for annual health check up as per schedule prepared by HR&A department.
b. LEGAL ASPECTS
1. Contractor shall maintain all register required under the Labour Laws and make the payment as per
the Minimum Wages Act to the workers employed by him.
2. Contractor shall obtain requisite license to carry out this contract under the provisions of Contract
Labour Act, 1970 and maintain necessary records and registers under the said Act
TENDER NO: SLPP/BLR/METAL SPRAY/ARC/26-28 Page
3. Contractor shall submit a copy of each of the registration certificates with respect to Employees
Provident Fund and Employee Compensation Act within one week time, from the date of award of this
4. Contractor's employees, agent or sub-agent shall not smoke or light anything within the premises of the
Gl PCL and carry match box I lighter or any other explosive and /or inflammable material inside the
5. Contractor shall abide by all the statutory rules and regulations like P.F, Labour Laws etc.
6. Contractor shall issue an appointment order to each casual labourer stating therein the nature of job to
be performed by him and fix time for which the concerned labourers are likely to be deployed.
Contractor shall also issue a temporary identity card specifying the period for which the labourer has
7. Contractor is fully liable for the persons engaged by him for above work; however, GIPCL reserves the
right to deduct any amount legally justified towards any liability not fulfilled.
8. Contractor shall indemnify GIPCL from any liabilities arising out of the employment of the manpower.
9. If the contractor fails to complete the allocated job within specified time frame, GIPCL shall get the
work done by third party at the risk and cost of contractor.
12. PAYMENT OF WAGES
Contractor shall be responsible for compliance of all statutory rules, regulation, act enforced from time
framed by the government such as Factory Act, Employee Compensation Act, payment of Wages Act',
Minimum Wages Act', Provident Fund Act, Payment of Bonus Act, Labor Law Act, maternity benefit act
in respect of employees engaged by him for the work and shall have to maintain necessary records. In
case any amount becomes due to be payable by him to his employees or to the Government under the
above rules, regulation, Acts.
13. ACCIDENT TO WORKMEN
Contractor shall be fully responsible for injury or death of any of your or third party workmen due to
any act omission I indiscretion on your part while undertaking the work and contractor shall fully abide
by the statutory requirements of the employee's compensation act. GIPCL shall not be liable for any
compensation due to accident, death or injury to any of contractor's workmen or any third party due to
negligence, act or omission on your part.
Necessary illumination at common works area will be provided by GIPCL.
15. SUNDAY/HOLIDAY SHIFT/NIGHT SHIFT
The contractor shall depute required manpower in Sunday/holidays and in nights consisting of
supervisor, technicians, helpers etc. for any emergency job which may come up.
TENDER NO: SLPP/BLR/METAL SPRAY/ARC/26-28 Page
16. SAFETY ASPECT
Contractor shall observe all the safety and security rules and regulation of the GIPCL which are at
present in force and which may come into force during the pendency of the contract. Any violation of
any rules and regulations will entail immediate termination of the contract.
When contractor moves his lifting tools and tackles to the plant area, required test certificates as per
the Factory Act 1948 and the state factories rules has to be submitted to safety Deptt. Safety Deptt. will
check the certificates and if found okay, then only materials will be allowed to enter inside the plant.
Material inward gate pass will be made only after certification from Safety Deptt. Security Dept. will
inform to Safety Dept., as & when such tools and tackles brought at the gate for making entry in the
maintenance site.
The contractor has to submit the list of required safety gears along with safety equipment available with
him to safety Dept. Safety Dept will check for quantity and quality of the safety gears and then allowed
permission of work. Poor quality material will not be allowed to take inside the Plant. If quantity of
required safety equipment is not satisfactory, contractor will not be allowed to carry out the work using
such safety gears inside the Plant for the work.
17. GENERAL SAFETY CLAUSE
1. The Contractor shall observe and comply, with regard to his employees working at the SLPP site, the
safety norms as per the safety operating standards
2. The Contractor shall ensure that his employees are informed and trained regarding the safety standards
to be adopted while operating within the SLPP premises and the Contractor shall brief them regarding
the same and regarding the use of the personal protective equipment (‘PPE’).
3. The Contractor shall issue safety shoes and safety helmet of IS standard to all his workers immediately
after execution of the contract and the Contractor shall ensure that his workmen wear the protective
equipment at all times during the work operation. Brand name for safety shoe & safety helmet shall be
suggested by safety representative of SLPP site. Such as:-
Sr No Model Company Specifications
1 Tough Hat, HP-TH Sure Safety IS : 2925-
2 V-Gard MSA ANSI/ISEA Z89.1-2009
3 PN 521 - Shelmet Karam
Sr No Model Company Specifications
1 Acme Fabrik plast SSTEELE (Strom)- Double Density IS: 15298-2011
2 Acme Fabrik plast TRIMAX(Adjacent) -Double
3 Worktoes Warren Worktoes - Warren Plus
TENDER NO: SLPP/BLR/METAL SPRAY/ARC/26-28 Page
4. Other safety gears like ear plug, dust mask, hand gloves, safety goggles, gum boots, full body safety
uniform and belts, safety net etc. shall be issued and used as per the job requirements. Safety helmet
shall be of YELLOW COLOUR ONLY. Contractor will procure safety shoes from a reputed company with
at least 12 months’ guarantee and shall produce the guarantee certificate and IS standard certificate to
the safety department. Contractor should purchase safety shoes of reputed brands. Safety shoes will be
issued every year. IS certificate and guarantee certificate must be obtained from the vendor and
submitted to the Safety department. Safety shoes should be heat, water, oil and chemical resistant,
having an anti-slippery sole of IS 15298- 2002 make.
5. It is duty of contractor to ensure that his workers are wearing required PPEs as per work requirement.
Contractor should ensure that their workers are wearing Safety helmet, safety shoes, dust mask,
goggles, ear plug etc. at all times when they are at work throughout the contract period. The contractor
has to maintain the PPE issue register with signature of workmen.
6. Contractor will reissue these PPEs in case of damage or misplacement of the same. Replacement shall
be made immediately.
7. The Contractor shall be responsible for providing first aid or emergency medical help and treatment to
his workmen in the event of any accident or injury.
8. If it is observed that contractor is not issuing required PPEs timely and that of required quality, GIPCL
will issue the required PPEs to contract workers and back charge the same with 25% overhead charges
9. All lifting tools and tackles shall be duly certified by competent person in conformity with the statutory
requirements and certificate in form no. 10 as per rule 60 of Gujarat Factories Rules, 1963 and section
29 of the Factories Act, 1948 shall be submitted every year before using such tools and tackles. In case
of purchase of new lifting tools and tackles, form no. 10 as per the said rules shall be submitted before
they are taken into use. All lifting tools and tackles shall be of reputed make having International
manufacturing standard and shall be maintained in proper and workable condition.
10. The Contractor shall nominate one safety officer with required qualification for supervising the daily
job/ shutdown jobs for observing and maintaining the safety aspects at site. He is solely responsible for
any safety measures during maintenance work. He has to ensure that all the workmen working at site
are equipped with essential PPE’s and proper safety arrangement is made at SLPP site.
11. After mobilization of any tools & tackles to site, which includes chain pulley blocks, D-shackles, wire
ropes, winch machines, Mobile crane, Hydra etc. shall be offered for inspection with all above statutory
test certificate before using at site for any work. They should use all tools and tackles only after
certification by GIPCL representative/safety officer.
12. When working at height, working on ceiling or roof covered with fragile materials, full body harness
safety belt, ladders and crawling boards shall be used to prevent accident. Further, during working on
height, contractor should arrange proper scaffolding of still pipes, safety net, full body safety belt, fall
arrestor system etc. Advice and instructions of engineer in charge/ safety in charge shall be strictly
complied with in this regard. All necessary safety precautions shall be taken by the contractor to prevent
accident and personnel injuries while working on height.
13. Flash back arrestors made of reputed manufacturer shall be provided on cutting torch, on DA cylinders
and on O2 cylinder. Cylinder caps also required for handling the cylinders in the height area. Gas
cylinders shall be transferred through gas cylinder trolley only with cylinder cap and stored up right
(vertical) position only. All gas cylinders shall be hydro tested / certified as per gas cylinder rules
Gas cylinders shall be stored, handled as per gas cylinder rules
14. All vehicles shall be operated by licensed drivers only. All vehicles’ PUC to be tested as per GOVT-RTO
guidelines. All Vehicles must be parked in Parking space designated by GIPCL. If any vehicle is found
inside the plant other than the parking area such vehicles shall be handed over to Security dept. and
their entry shall be cancelled inside the plant with immediate effect.
TENDER NO: SLPP/BLR/METAL SPRAY/ARC/26-28 Page
15. All electrical equipment shall be of good condition and free from any defect. Electrical tools &
equipments i.e. welding m/c, grinding and drill m/c etc. may be checked by the electrical engineer of
the contractors regularly, every 6 month at least and report to be submitted to concerned HOD and
16. During hot work, contractor will use fire curtains like asbestos sheets or fire blankets to prevent falling
and spreading of sparks and hot material on and around the work area. Contractor will procure and use
such items. ELCB / RCCB shall be provided with rating of 9-30 milliamperes on welding machine and all
portable power tools.
17. The contractor shall fill – up Incident notification form (S-I), Incident Investigation form (S-II) and near
miss report within time limit as specified in forms, if any accident, Incident, near miss occurred while
working at SLPP site.
18. Major AMC / ARC contractor (Where the man power strength is more than 50 and above) should
appoint / nominate one qualified safety officer and he shall be responsible for addressing all the safety
related aspects of execution of contract jobs and he will in close co-ordination with safety officer of
SLPP and attend all safety related meeting such as safety committee, on job safety training etc. Where
the contractual man power is less than 50, the site in charge of the contractor will act as a safety officer
and he will perform all the duties of safety officer as mentioned above.
19. No loose connection / joints allowed in electrical cables during performance of any kind of job.
20. Safety shoes to be issued to female employees also.
21. All the vehicles shall be fit as per RTO guidelines and valid fitness certificate is required as per RTO
22. The Contractor's nominated safety officer shall be imparted regular on-job safety training like tool-box
talk etc. and submit a record of such training in safety dept, respective dept and HR&A dept.
23. The Contractor shall comply all the new requirements related with safety as informed by the HOD /
Safety department from time to time.
24. Penalty to be imposed for Violation of safety norms is proposed as follows :-
The Contractor & Contract workmen shall strictly adhere to Safety standards /Guidelines as per
practices. The list provided below is an indicative list to explain the principles behind safety practice. If
the contract workmen fail to comply with safety standards as per category A, B & C below, penalty shall
be levied on the contractor as per the table mentioned below:
Category Classification Examples / Cases Penalty
A PPEs Related Working without helmet, shoes, safety belt, Rs. 100/- per instant.
B Work Failure to adhere to HSE guidelines/plans, Rs. 500/- per instant
Instruction careless attitude in material handling, Machine After three incidence. Per
Related being used with damaged machine guard, incidence Rs. 2500/-
unsafe electrical work – workout plug
top/improper electrical joints/cables lying on Continuous unsafe acts
ground, electrical equipment working without will disqualify the
proper earthling, machine being used without contractor from further
machine guard, Welding machine without participation in tender of
incidence ELCB / RCCB of proper rating, Gas GIPCL-SLPP.
cylinder without test certificate, Cylinder cap,
NRV /Flash back arrester, Cylinder trolley etc.
TENDER NO: SLPP/BLR/METAL SPRAY/ARC/26-28 Page
Unsafe working practices at height more than
Working without permit non-compliance
with permit conditions like hot work, height
work etc. as applicable, lifting tools and tackles
being used without third party inspection
certificates in form no. 9/ 10 as per Factory Act
C Unsafe Breach of safe practices by a particular person Suspend the entry gate
Practices repeatedly for three times. pass for one week.
After two suspensions his
gat pass will be cancelled
Electrical safety:-
All the electrical apparatus including welding machine (either 3-phase or single phase) should be provided
with Earth Leakage Circuit Breaker (ELCB/RCCB/RCBO) of 30mA rating.
Bidder should ensure periodic checking of ELCB provided in their electrical apparatus.
Bidder should ensure that there should not be any joint in the power supply cable of any machine. All cables
should be in good condition with no bare insulation or frayed wires
Any power supply switchboard/extension boards brought by Bidder should have ELCB of 30mA rating and
it should have sockets along with 3-pin plug
Any type of cable brought by Bidder should not have any joint and should be of sufficient capacity for the
respective job.
Bidder to bring their own 24V rating portable hand lamps along with cable of (apparatus should be having
230V / 24V transformer) for the temporary lighting arrangement required at site for the respective jobs.
Bidder should bring sufficient qty no. of temporary light fixtures (230V or 24 V as per requirement of
job/contract), extension boards, cables to draw supply from nearest power point.
Hand-held and portable machines shall be equipped with a built-in switch to switch off power in case of
Bidder to ensure healthiness of their electrical equipment whenever brought to GIPCL site and get them
tested / verified by GIPCL Electrical Department representatives before start using.
Bidder to ensure - All portable electric apparatus shall be regularly examined, tested and maintained to
ensure that the apparatus and leads are in good order.
Only three-core cable shall be used for single phase operated tools with the third core connected to earth.
Ensure that all metallic portable appliances are provided with 3 pin plug and socket connections with third
pin be connected to the ground terminal where ever possible. Also, the metal work of the apparatus is
effectively earthed.
All cables and connections should be sound and of adequate capacity and properly insulated while using
any welding machine and other power connections.
The earthing arrangements should be properly made with earthing clamps or a bolted terminal while using
any welding machine
Electric holders when not in use, should be placed on an insulated hook or the holders should be fully
insulated while using any welding machine
Whenever the welder stops or leaves work for any appreciable time, the power supply to welding machine
shall be effectively disconnected while using any welding machine
GIPCL will provide either single phase OR 3-phase 3 wire power supply from the nearby point at job site.
Bidder to supply the required cable between GIPCL power supply point to equipment brought by Bidder
for the specified job. Further, if Bidder’s equipment requires 3-ph 4 wire supply then they should derive 3-
TENDER NO: SLPP/BLR/METAL SPRAY/ARC/26-28 Page
ph 4 wire supply from GIPCL 3-ph 3 wire supply system by incorporating sufficient capacity transformer.
Like for hydro jet cleaning system, mixer machine, induction heating machine, SR machine etc., GIPCL will
provide 3-ph 3 wire power supply.
Cable between welding machine to GIPCL power supply point should have cable TOP plug towards GIPCL
power supply point of Make BALS having rating as 63 Amp.
Contractors not following above electrical safety points at any point of time are liable to penalty and their
machine/ apparatus shall be seized by GIPCL.
Penalty so levied against the contractors and company employees will be used during the observation of
National Safety Day.
The contractor, workmen following good safety practices in their work area continuously will be
rewarded I honored on National safety day.
18. GENERAL TERMS AND CONDITION OF THE CONTRACT
1. All special tools and tackles to execute the contract are in the scope of the contractor. The contractor should
ensure that tools are in healthy condition. All consumable items i.e. cloth, cotton waste etc. would be in
the scope of the contractor.
2. If any equipment or part are found damaged due to negligent / faulty process cost of such damages shall
be recovered from the contractor’s monthly bill/retention money/security deposit.
3. Contractor shall nominate /authorize a person in writing as site in charge to co-ordinate with GIPCL
engineer and should bear overall responsibility of contract. Such person shall function from site office of
contractor at SLPP. Site in charge have relevant experience and he should be able to handle site
independently. Contractor has to submit the documentary proof for the same.
4. The decision of the engineer in charge shall be final and binding on the contractor for defining the terms
and condition included in this contract.
5. Inspection of work will be done by engineer in charge or his authorized representative. If the work is not
found satisfactory engineer in charge reserves the right to take suitable action.
6. GIPCL is reserves right to cancel the tender without any reason, it is only discretion of GIPCL.
7. Arrangement for lighting at the work spot has to be made by the contractor. He has to arrange all lighting
equipment such as power cable, hand lamps. The contractor has to take prior approval for taking electrical
power supply. The contractor should keep hand lamps of 24Volt, 240 Volt and sufficient quantity of halogen
8. Contractor has to depute one electrician to make lighting connection, welding machine & grinder machine
connection etc. from the supply point. Electrician/supervisor should ensure that the cable connection is
not in loose condition, which may cause any damage or failure to the machine/manpower.
9. The contractor has to do quality job. GIPCL shall not compromise in quality. In case of poor quality of work
the contractor may be asked to rework the job at free of cost...
10. During working in high risk area the workman must wear a suitable safety apron, safety hand gloves and
goggles. It is a supervisor’s responsibility to ensure it without failure.
11. All the generated scrap, cotton waste, tools and tackles are to be removed from the site immediately and
ensure cleaning of the site. Also these items should be disposed off to the scrap yard or any other
designated place as instructed by Engineer In Charge. In case of heavy weight items, if required
transportation may be arranged by the GIPCL at the discretion of the engineer in charge.
TENDER NO: SLPP/BLR/METAL SPRAY/ARC/26-28 Page
12. Contractor must fulfil all the safety regulations and to take safety measures to avoid hazards. Contractor
has to arrange sufficient safety helmets, safety belts, ear plug/muff, nose mask etc of standard quality.
Failing this the Engineer in Charge is authorised to remove any person(s) or machinery(s) if felt as safety
hazard. If the contractor repeatedly violates safety rules/regulations Engineer in Charge may take necessary
action against the contractor.
13. Contractor must issue safety helmets (Yellow colour) & safety shoes of reputed make & having ISI mark.
14. It is contractor responsibility to ensure all the workmen using the PPE’s as per the safety requirement.
Failing this GIPCL will take disciplinary action against workmen & contractor.
15. GIPCL is an ISO 9001, ISO 14001, OHSAS 18001 & ISO 50001 certified company, and GIPCL gives extremely
importance to maintain these global standards. Contractor has to stick to these standards while working
19. CONTRACTOR'S SUPERVISION
The contractor shall, during the whole time the work is in progress, employ a qualified experienced site-in-
charge of the works with adequate experience in handing of jobs of this nature and with the prior approval
of the GIPCL I ENGINEER. Such in-charge shall be constantly in attendance at the site during working hours.
During CONTRACTOR'S supervisory engineer absence during working hours, if unavoidable, and also
beyond working hours, when it may be necessary to give directions, orders may be given by the ENGINEER
I/C GIPCL and shall be received and obeyed by the CONTRACTOR'S superintendent or Foreman who may
have charge of the particular part of the work in reference to which orders are given. If requested to do so,
the ENGINEER IGIPCL shall confirm such orders in writing. Any directions, instructions or notices given by
the ENGINEER I/C GIPCL to him, shall be deemed to have been given to the CONTRACTOR.
The representative of the CONTRACTOR shall have all necessary powers to receive materials from the
GlPCL, issue valid receipts for the same, engage labour or purchase materials and proceed with the work
as required for speedy execution. None of the CONTRACTOR'S Superintendents, engineers, supervisors or
labour should be withdrawn from the work without due notice being given to the GIPCL I/C ENGINEER;
further no such withdrawals shall be made if in the opinion of the GIPCL I/C ENGINEER such withdrawals
will jeopardize the required pace of progress I successful completion of the work.
The CONTRACTOR shall employ in or about execution of the work only such persons as area careful, skilled
and experienced in their respective trades, and the GIPCL shall be at liberty to object to and require the
CONTRACTOR to remove any person employed by the CONTRACTOR in or about execution of works who
in the opinion of the ENGINEER misconducts himself or is incompetent or negligent in the proper
performance of his duties and all such persons shall not again be employed upon the works without the
prior permission of the GIPCL. Neither the CONTRACTOR and the PURCHASER nor the ENGINEER shall hire
or employ any employee of the other party except by mutual consent.
20. CONTRACTOR TO REMOVE ALL OFFENSIVE MATTER IMMEDIATELY AND CLEANUP
All loose materials, wastage, packing materials, cut pieces or other matter of an offensive nature shall not
be deposited on the surface, but shall at once be carted away by the CONTRACTOR to some pit or place
provided by him away from the site of work and approved by local authorities. As a part of the work
included in this contract, the CONTRACTOR shall completely remove and satisfactorily dispose of all
temporary works to the extent directed. He shall tear down and dispose of all temporary works, shall
remove or grade, to the extent directed, all plant and equipment, shall satisfactorily dispose off all rubbish
TENDER NO: SLPP/BLR/METAL SPRAY/ARC/26-28 Page
resulting from the operations under this contract and shall do all work necessary to restore the territory
embraced within the site of his operations to at least as good order and conditions as at the beginning of
the work under this contract.
21. FACILITIES TO BE PROVIDED BY GIPCL
(A) The Company shall provide the following facilities to the Contractor at the site:
a. Electricity & water at nearest available one point. Further distribution to be done by contractor at their
b. Quarter(s) for supervisor/ engineers on chargeable basis in GIPCL's township at discretion of GIPCL if
c. Workshop facility as available at site only. However, contractor may visit the workshop to ensure the
existing facility. For the facilities other than available, contractor has to carry out the job outside at their
d. Site office shall be provided at site, If space available.
e. First aid facilities as available on chargeable basis.
Apart from the above, no other facilities shall be provided by GIPCL.
(B) GIPCL shall also conduct an orientation program appraising the workmen regarding the safety norms and
measures to be observed during work operations at the plant site.
22. WORK MEASUREMENT/CERTIFICATION
a. The work to be performed being a specialized nature, the contractor should be fully conversant with
modern practices and should be able to carry out works independently of large thermal power plant. The
contractor shall therefore be required to engage qualified/ experienced personnel to undertake the work
as per specifications and requirement.
b. Contractor should maintain one computer with printer for keeping daily records and maintain the data.
c. All the work measurements shall be jointly recorded in a measurement sheet/register/relevant documents
by the contractor I authorized representative of the contractor and the Engineer-in-charge. The
measurements shall be clearly written indicating date of measurement, location, reference to drawings, if
any, and jointly signed.
d. The Contractor shall be required to furnish satisfactory job completion report to GIPCL.
The submission of report should be on daily basis, the monthly bill payment shall be released based on the
certified reports of the works.
e. Inspection of work will be done by Engineer in Charge or his authorized representative. If the work is not
found satisfactory engineer in charge reserves the right to take suitable action and shall be binding to the
23. PUBLIC HOLIDAYS
The Contractor shall be responsible for giving benefit to all his employees, employed in whatsoever
capacity, 09 Public/Paid holidays and the same shall be notified in advance and due communication thereof
shall be made to the Management.
TENDER NO: SLPP/BLR/METAL SPRAY/ARC/26-28 Page
24. FORCE MAJEURE
The performance of the obligations herein contemplated may be suspended without incurring the penalty
in the event of the subsistence of Force Majeure conditions.
If a Force Majeure situation arises, the affected Party shall promptly notify the other Party in writing of
such conditions and the performance shall be suspended as per mutual agreement.
For the purposes of this clause, 'Force Majeure' means an event beyond the control of the Party and not
foreseeable by the Party and shall include events of floods, explosions, riots, wars, hurricane, epidemics,
any other Act of God, quarantine restrictions, terrorism, government actions and provided always that such
acts result in the impossibility of the further performance of the contract.
The Contractor shall indemnify and keep harmless GIPCL from and against all actions, proceedings, claims,
demands, losses, costs, damages and expenses whatsoever which may be brought against or suffered by
GIPCL which it may sustain, pay or incur as a result of or in connection with the performance/ purported
performance/ non-performance of the contract by the Contractor.
In case, in any litigation pertaining to labour employed through contractor if any direction or order is issued
by court at any point of time the contractor shall comply with and implement such direction or order
whether passed at the time of award of contract or during the pendency of contract. Further, the
Contractor shall indemnify the GIPCL against all consequences arising and affecting GIPCL owing to the
compliance of the orders by the Contractor.
26. GOVERNING LAW AND JURISDICTION
This tender document and contract shall be governed by the laws of India and the Courts at Baroda/Surat
shall have jurisdiction regarding the same.
27. Where any portion of the General Condition of Contract is repugnant to or at variance with any provisions
of the Special Condition of Contract, then unless a different intention appears, the provision of the Special
Conditions of Contract shall prevail to the extent of such repugnancy of variance.
TENDER NO: SLPP/BLR/METAL SPRAY/ARC/26-28 Page
SPECIAL CONDITION OF CONTRACT
1. DETAIL SCOPE OF WORK
As per Section- A Clause – 02 Detail Scope of work.
1.1 FAILURE DURING EMERGENCY
During any emergencies, contractor shall have to carry out the work by deploying additional force within
twenty four hours notice period failing which GIPCL reserves the right to carry out this work by engaging
other party. The expenditure occurred due to such situations, the Contractor will be held responsible & the
same will be recovered from the Contractor's monthly bill I any other pending bills along with 10% overhead
charges. For repetitive failure of such work for more than two incidents, GIPCL reserve the right to terminate
the entire contract by forfeiting all pending dues, Security Deposit & other retention money, if any, after
giving 15 days notice to the contractor & this will be binding to the contractor.
1.2 SCOPE OF CONTRACTOR
1. All tools & tackles, tractors, required vehicles to execute the contract will be in the scope of the contractor.
The contractor should ensure for healthiness/working conditions of tools, tackles & vehicles.
2. All consumable items like cloth, cotton waste, kerosene, gas, diesel, lubricants, etc will be in the scope of
the contractor.
3. All safety/PPEs required during work at site are to be arranged by the contractor.
4. The Contractor shall have to provide necessary facilities including accommodation for their labour at their
5. The contractor has to arrange JCB, cultivators, breaker machines & tractor with trolleys for lifting/shifting
the materials of their own.
6. Contractor has to depute their full time experienced overall site-in-charge & independent Location/Package
wise supervisors for work execution as per specification and for day to day work planning & coordination
with respective department's Engineer-in-charge, to obtain day to day Location/Package wise work
permits, to get daily location wise work supervision, to record Location/Package wise joint work done
reports/measurements/trip certification, to prepare Location/Package wise separate bills, to prepare &
apply Location/Package wise manpower gate pass, to maintain Location/Package wise statutory & legal
compliance records, etc
1.3 TO REMEDY DEFECTIVE WORK
If the work or any portion thereof shall be damaged in any way excepting by the acts of the GIPCL, or if
defects not readily detected by proper inspection shall develop before the final completion and acceptance
of the whole work, the CONTRACTOR shall forthwith make good, without compensation, such damage or
defects in a manner satisfactory to the ENGINEER I/C GIPCL. In no case shall defective or imperfect work be
retained even if contractor followed all technical specifications. GIPCL will not compromise for quality of
materials, works & workmanship. The CONTRACTOR shall remain liable under the provisions of this clause
notwithstanding the passing by the GIPCL of any certificate, final or otherwise or the passing of any accounts.
TENDER NO: SLPP/BLR/METAL SPRAY/ARC/26-28 Page
1. 4 DAILY DIARY AND PROGRESS REPORT
A daily diary register will be kept in the ENGINEER'S office. The CONTRACTOR will supply all detailed
information every day at 9:00 hours for the day preceding and the diary will be jointly signed by the ENGINEER
and the CONTRACTOR'S representatives, every day in token of its correctness. A works instruction book,
serially numbered will also be kept in the ENGINEER'S office and all day to day instructions will be given in
that book. The CONTRACTOR'S representative shall report every day to see these instructions and sign them
at the bottom in token of his having seen them.
The CONTRACTOR shall provide all information regarding procurement of materials and progress of work, as
is required by the ENGINEER for compiling the weekly progress reports. This information shall be provided
by contractor at 9:00 hours every Monday, for the preceding week.
2. PRICE & RATES
The rates quoted by the Bidder in the online Price Bid shall be inclusive of cost of all labor, supervision, cost
of safety supervisor, shifting, transportation, loading, unloading, equipment, all tools & tackles, safety
equipments & PPEs, Royalties, Rents, GST, Stamp Duties, Central or State Government or Local body or
Municipal Taxes or Duties, Turn over Tax, Work Contract Tax, and/or any other duty/tax, levied by the
Central, State Government or other Public bodies etc ... and such other costs that are not specifically
mentioned herein but will be incurred by the contractor for the satisfactory and timely completion of the
work. The quoted rates shall be deemed to include for everything mentioned in the specification, all leads &
lifts, contractor's overheads & profits for due performance of the work under this contract and such other
costs that are not specifically mentioned herein but will be incurred by the contractor for the satisfactory
and timely completion of the work. The rates shall also include cost for mobilization/demobilization of
manpower, equipments, materials, etc.
The rates shall be firm for entire contract period and also during extension, if required and shall not be subject
to any escalation in prices, idle charges for labor, machinery, overhead expenses etc. No price escalation/idle
charges shall be due to any reason whatsoever.
The prices/item rates quoted by Bidder shall remain firm till completion of the contract period and any
agreed extensions thereafter and shall not be subject to any other escalation, idle charges for labor,
machinery, overhead expenses etc. No price escalation/Idle charges shall be payable due to delay in work by
contractor or due to non-availability of work front by GIPCL or any reason whatsoever.
The price/rate quoted by CONTRACTOR shall be considering mobilization of all required manpower, tools &
tackles, materials, equipment for timely and satisfactory completion of all scope of work.
The value and/or quantum of work may be increased or decreased depending upon day to day requirement.
However, item rates remains unchanged and the payment shall be made as per the actual quantity executed
as informed & certified by GIPCL representatives.
TENDER NO: SLPP/BLR/METAL SPRAY/ARC/26-28 Page
3. SUBMISSION OF TECHNICAL DOCUMENTS TO THE ENGR-IN-CHARGE
Contractor shall submit following documents to the Engineer-in-charge for verification purpose of the bill:-
(i) Measurement sheet along with joint record of work done in the form of joint inspection report duly signed
by authorized representative of contractor and GIPCL Engineer.
The bill will not be entertained without submission of above documents.
4. MOBILIZATION AND EXECUTION
a) Contractor shall mobilize the resources at site within 7 to 8 days from the time the intimation given by
b) Contractor shall provide required separate & independent site supervisors who will be responsible for
supervision and execution of job in specified time with respect to quality, specifications, site preparations,
safety, co-ordination with GIPCL, issue of work permits, joint measurements, etc. The supervisors shall
coordinate with the Engineer-in-charge of GIPCL for proper execution of the job.
c) The resources required for execution of above jobs will vary from time to time, hence contractor shall
mobilize the resources accordingly.
d) Contractor shall provide accommodation for the persons deployed by him for the work at his own cost.
5. QUANTITY OF WORK
The estimated quantities of work required to be carried out by the contractor are as given in the Section-E
(Schedule of Quantity/Rate). Estimated and shall vary according to the exigencies of work at site. However,
the rates quoted by Bidder shall remain firm irrespective of any variation in estimated quantities.
Contractors shall engage required nos. of labors along with required tools & tackles as per work load and
emergency situations throughout the contract period to perform his contractual duties.
In case, contract quantity/amount exhausted before completion of contract period, GIPCL reserve the
rights to increase the quantities or contract amount for successful completion of entire contract period.
Contractor shall responsible to complete the particular job up to entire satisfaction of Engineer-in-charge.
The item rates remain firm & unchanged till completion of the contract and any agreed extensions
thereafter and shall not be subject to any escalation, idle charges for labor, machinery, overhead expenses
etc ... for any reason whatsoever. The quantum of work of individual item may be up to any extent
depending upon requirement. However, item rate remains unchanged. Under this contract, contractor has
to execute all work as per the Plant requirement.
6. GENERAL CONDITIONS OF CONTRACT
General Conditions of Contract (Section-C) and detail specification prepared by the company will be
applicable for this contract. The same is enclosed herewith. Bidders are advised to go through the same.
Where any portion of the general conditions of contract is repugnant to or at variance with any provisions
of the special conditions of contract, then unless a different intention appears, the provision of the special
conditions of contract shall prevail to the extent of such repugnancy of variance.
TENDER NO: SLPP/BLR/METAL SPRAY/ARC/26-28 Page
SCHEDULE OF RATE
For Supply and Application of ARC coating:
Party to quote for supply of material and application of metal spray considering the scope of work with two(02)
years guarantee period from application of metal spray.
PRICE SHEDULE FOR SUPPLY AND APPLICATION
Estimated Unit Rate in Rs.
Total cost in Rs.
Sr. No. Description UOM Quantity per Sq. Mtr
Charges for supply and
application of Arc Spray
Coating inclusive of To be Will be
1 mobilization with required Sq. mtr. 360 submitted on- calculated by
manpower, tools & tackles for line by Bidder System
Unit-1 to 4 Boilers for AOH
2 Applicable GST (Presently 18%) on Sr. No.01 calculated by
3 Total Amount including GST (Sr. No.1+2) calculated by
3 Total Amount including GST (Sr. No.1+2) calculated by
1. Price bid shall be submitted in soft form only through (n)procure.
Note: Estimated rates includes cost of all material and all manpower, equipment, vehicles, consumables, tools
& tackles, transportation, Safety and statutory compliance, mobilization, Contingency expenditure and
supervision charges etc…..
2. E-Reverse Auction:
In (n) Procure system provision may be made ARC process reverse Auction.
2.1 For conducting e-Reverse Auction, lowest 50% out of total eligible Bidders (rounded to the next higher
whole number) or Minimum three (03) eligible bidders (L1 to L3) will be invited.
TENDER NO: SLPP/BLR/METAL SPRAY/ARC/26-28 Page
2.2 L1 value will be declared through n-Procure’s e-Auction Portal: https://eauction.nprocure.com to start
e-Reverse auction process and final received lowest auction price in the value by e-Reverse auction
process will be the final L1 price.
2.3 Minimum decremental value for the e-Reverse auction will be set by GIPCL prior to start of e-Reverse
auction and this will be applicable during each reverse Bid.
2.4 Duration for the e-Reverse auction will be 60 Minutes with provision of extension for further 15 Minutes
at every single reverse bid received during the last 05 minutes, till there is no further reverse bid entry
by the participating Bidders.
3. GST shall be paid extra at actual as per prevailing rates as declared by Central Government on submission
of documentary evidence. GST shall be quoted separately if applicable.
4. The quantities shown in the price bid are approximate for the contract period and may vary as per site
5. The Bidder shall fill the bid documents with utmost care in consonance with the instructions contained in
the bid documents.
6. Payment shall be made on actual quantity executed.
The prices quoted are firm throughout the contract period and will not subject to any variation whatsoever.
COMPANY SEAL SIGNATURE ……………….…
DESIGNATION …………….…..
COMPANY ………………..….…
TENDER NO: SLPP/BLR/METAL SPRAY/ARC/26-28 Page
LIST OF ANNEXURES& FORMS
PROFORMA FOR CONTRACT SECURITY -CUM-PERFORMANCE GUARANTEE
BY SELLER I CONTRACTOR.
(To be executed on non-judicial stamped paper of approximate value)
1. WHEREAS Gujarat Industries Power Company Limited having its office at PO: Ranoli, Dist. Vadodara - 391
Gujarat State, India (hereinafter referred to as ''The Company/Owner'' w h i c h expressions shall unless
repugnant to the subject or context includes its legal representatives, successors and assigns} has entered
into a contract with M/s. .. ................................... ./ has placed a purchase order on M's ...............................
(hereinafter referred to as "Contractor(s}l Seller(s}" which expression shall unless repugnant to the subject
or context includes their legal representatives, successors and assigns ) for .................................. on the terms
and conditions as set out inter alia, in the Company"s contract No./ P.O.No ............... date ............ and various
documents forming part thereof hereinafter referred to as the"said contracf' which expression include all
amendments, modifications and/ or variations thereto and where as the Contractor(s}/ Seller(s} has agreed
for due execution of the
entire contract and guarantees its performance including any parts executed through any other agencies/
subcontractors.
AND WHEREAS one of the conditions of the "said contract" is that "contrador(s)/seller(s) shall furnish to the
owner a Bank Guarantee from a bank for .... % ( .......... percent) of the total value of the "said contract"
against due and faithful performance of the "said contract" including performance guarantee obligations of
the contractor(s)/seller(s) for execution/ supplies made under the "said contract."
2. We .................................. Bank having its branch office at .................. do hereby agree and undertake to pay
the amount due and payable under this guarantee without any demur merely on a demand from the
Company stating that in the opinion of the Company, which is final & binding, the amount claimed is due by
reason of default made by the Contractor(s}/ Seller(s) in performing any of the terms & conditions of the said
Contract including defect liability obligations, in fulfilling the performance guarantee obligation or loss or
damage caused to or would be caused to or suffered by the Company by reason of any breach by the said
TENDER NO: SLPP/BLR/METAL SPRAY/ARC/26-28 Page
Contractor (s}/ Seller(s) of any of the terms & conditions of the contract. Any such demand made on the Bank
by the owner shall be conclusive as regards the amount due and payable by the Bank under this guarantee.
However our liability under this guarantee shall be restricted to Rs . . . . . . . (Rupees ........................... only}.
3. We undertake to pay to the Company any money so demanded not withstanding any dispute or disputes
raised by the contractor(s)/ Seller(s) in any suit or proceeding pending before any office, court or tribunal
relating thereto our liability under this present guarantee being absolute and unequivocal. The payment so
made by us under this bond shall be a valid discharge of our liability for payment there under. Our liability to
pay is not dependent or conditional on the owner proceeding against the Contractor(s)/ Seller(s).
4. The guarantee herein contained shall not be determined or affected or suspended by the liquidation
orwinding up, dissolution or change of constitution or insolvency of the said Contractor(s)/ Seller(s) but shall
in all respect and for all purposes be binding and operative until payment of all money due or liabilities under
the said contract(s)/ Order(s) are fulfilled.
5. The Bank further unconditionally agrees with Gujarat Industries Power Company Limited (GIPCL) that Gujarat
Industries Power Company Limited (GIPCL) shall be at liberty, without the Bank’s consent and without
affecting in any manner the Bank’s obligation under this Guarantee, from time to time, to:
a. Vary and / or modify any of the terms and conditions of the Agreement.
b. Extend and / or postpone the time for performance of the obligations of the Contractor under the
c. Forbear or enforce any of the rights exercisable by Gujarat Industries Power Company Limited (GIPCL)
against the Contractor under the terms and conditions of the Agreement.
6. This guarantee shall be in addition to and not in substitution or in derogation of any other security held by
Gujarat Industries Power Company Limited (GIPCL) to secure the performance of the obligations of the
Contractor under the Agreement.
7. No action, event or condition, which by any Applicable Law should operate to discharge the Bank from
liability hereunder, shall have any effect and the Bank hereby waives any right it may have to apply such law,
so that in all respects its liability hereunder shall be irrevocable and, except as stated herein, unconditional
in all respects.
8. This guarantee will remain valid up days or ------ whichever is earlier. The Bank undertakes not to revoke this
guarantee during its currency without previous consent of the OWNER/PURCHASER and further agrees that
if this guarantee is extended for a period as mutually agreed between bidder & owner/purchaser, the
guarantee shall be valid for a period so extended provided that a written request for such extension is
received before the expiry of validity of guarantee.
TENDER NO: SLPP/BLR/METAL SPRAY/ARC/26-28 Page
9. We ............... Bank further agree with the Company that the company shall have the fullest liberty without
our consent and without affecting in any manner our obligations hereunder to vary any of the terms and
conditions of the said Contract(s)/ Order(s) or to extend the time of performance by the said Contractor(s)
Seller(s) from time to time or to postpone for any time or from time to time any of the powers exercisable
by the Company against the said Contractor(s)/ Seller(s) and to forbear or enforce any of the terms and
conditions relating to the said Contract(s)/ Order(s) and we shall not be relieved from our liability by reason
of any such variation, or extension being granted to the said Contractor (s) I Seller(s) or for any forbearance,
act or omission on the part of the Company or any indulgence by the Company to the said Contractor(s)/
Seller(s) or by any such matter or thing whatsoever which under the law relating to sureties would, but for
this provision, have affect of so relieving us.
10. Notwithstanding anything contained herein before, our liability shall not exceed Rs ................ (Rupees
............ only) and shall remain in force till.......... Unless a demand or claim under this Guarantee is made on
us within three months from the date of expiry we shall be discharged from all the liabilities under this
Corporate Seal of the Bank
By its constitutional Attorney
Signature of duly Authorized
On behalf of the Bank
With Seal & Signature code
Bidder shall submit BG from below mentioned banks only. Banks other than below mentioned list are not
All Nationalized Banks
Kotak Mahindra Bank
IndusInd Bank
Karur Vysya Bank
TENDER NO: SLPP/BLR/METAL SPRAY/ARC/26-28 Page
PROFORMA FOR BANK GUARANTEE FOR EARNEST MONEY DEPOSIT
(To be executed on non-judicial stamped paper of appropriate value)
1. WHEREAS M/s.Gujarat Industries Power Company Limited having its Corporate Office at PO: Ranoli,
Dist.Vadodara - 391 350, Gujarat State, India (hereinafter called "The Company Owner'' which expression
shall unless repugnant to the subject or context includes its legal representatives, successors and assigns)
(hereinafter called "the said tender")to M/s .................................. (hereinafter called the said Tenderer(s)"
which expression shall unless repugnant to the subject or context includes their legal representatives,
successors and assigns and as per terms and conditions of the said tender, the tenderer shall submit a Bank
guarantee for Rs......... .. (Rupees ................. only) towards earnest money in lieu of cash.
2. We ................................... Bank having its branch office at . . . . . . . . . do hereby undertake to pay the amount
due and payable under this guarantee without any demur, merely on a demand from the Company stating
that in the opinion of the company which is final and binding, the amount claimed is due because of any
withdrawal of the tender or any material alteration to the tender after the opening of the tender by way
of any loss or damage caused to or would be caused or suffered by the Company by reason of any breach
by the said tenderer(s) of any of the terms and conditions contained in the said tender or failure to accept
the letter of Intent Agreement or that the amount covered under this Guarantee is forfeited. Any such
demand made on the Bank by the owner shall be conclusive as regards the amount due and payable by the
Bank under this guarantee, However, our liability under this guarantee shall be restricted to an amount not
exceeding Rs .................... (Rupees .................... only).
3. We undertake to pay to the Company any money so demanded not withstanding any dispute or disputes
raised by the tenderer (s) in any suit or proceeding pending before any office, court or tribunal relating
thereto our liability under this present guarantee being absolute and unequivocal. The payment so made
by us under this bond shall be a valid discharge of our liability for payment there under. Our liability to pay
is not dependent or conditional on the owner proceeding against the tenderer.
4. The guarantee herein contained shall not be determined or affected or suspended by the liquidation or
winding up, dissolution or change of constitution or insolvency of the said tenderer(s) but shall in all respect
and for all purposes be binding and operative until payment of all money due or liabilities under the said
contract(s)/ Order(s) are fulfilled.
TENDER NO: SLPP/BLR/METAL SPRAY/ARC/26-28 Page
5. The Bank further unconditionally agrees with Gujarat Industries Power Company Limited (GIPCL) that
Gujarat Industries Power Company Limited (GIPCL) shall be at liberty, without the Bank’s consent and
without affecting in any manner the Bank’s obligation under this Guarantee, from time to time, to:
a. Vary and / or modify any of the terms and conditions of the Agreement.
b. Extend and / or postpone the time for performance of the obligations of the Contractor under
c. Forbear or enforce any of the rights exercisable by Gujarat Industries Power Company Limited (GIPCL)
against the Contractor under the terms and conditions of the Agreement.
6. This guarantee shall be in addition to and not in substitution or in derogation of any other security held by
Gujarat Industries Power Company Limited (GIPCL) to secure the performance of the obligations of the
Contractor under the Agreement.
7. No action, event or condition, which by any Applicable Law should operate to discharge the Bank from
liability hereunder, shall have any effect and the Bank hereby waives any right it may have to apply such
law, so that in all respects its liability hereunder shall be irrevocable and, except as stated herein,
unconditional in all respects.
8. We ................. Bank Ltd. further agree that the guarantee herein contained shall remain in full force and
effect during the period that would be taken for the finalization of the said tender and that it shall continue
to be enforceable till the said tender is finally decided and order placed on the successful tenderer(s) and
or till all the dues of the company under or by virtue of the said tender have been fully paid and its claims
satisfied or discharged or till a duly authorized officer of the company certifies that the terms and conditions
of the said tender have been fully and properly carried out by the said tenderer (s) and accordingly
discharges the guarantee.
9. That the Owner Company will have full liberty without reference to us and without affecting this guarantee
to postpone for any time or from time to time the exercise of any of the power of the owner under the
10. Notwithstanding anything contained herein before, our liability shall not exceed Rs ...................... (Rupees
.............................. only) and shall remain in force till. ................ (Date to be filled up shall be 180 days from
the date of submission of Bid).
Corporate Seal of the Bank
By its constitutional Attorney
Signature of duly Authorized person
On behalf of the Bank
With Seal & Signature code
TENDER NO: SLPP/BLR/METAL SPRAY/ARC/26-28 Page
Bidder shall submit PBG from below mentioned banks only. Banks other than below mentioned list are not
All Nationalized Banks
Kotak Mahindra Bank
IndusInd Bank
Karur Vysya Bank
TENDER NO: SLPP/BLR/METAL SPRAY/ARC/26-28 Page
[On Rs.300/- Non Judicial Stamp paper with notary]
We, M/s………………………………. having registered office
at……………………………………………………………………………………………… thereby solemnly state, declare and represent:
THAT we have been entrusted a job ……………………………………………………………………………………………for
year………………………… i.e. from …………………to ……………..vide Work order
No:………………………………………………………………..Dated………………………… on contract basis by M/s Gujarat
Industries Power Company Limited for it’s Surat Lignite Power Plant at Village Nani-Naroli, Taluka Mangrol, Dist.
Surat and we have undertaken the said work and have completed the same at GIPCL site during
THAT we are fully aware about the applicability of various Labour Legislation and Rules framed thereunder, to
be Contractor & Contract Labours Legislations and Rules framed thereunder, to the Contractor & Contract
Labours, which includes (1) The Contract Labour (Regulation & Abolition) Act, 1970. (2) The Employee’s
Provident Fund & Miscellaneous Provisions Act, 1952. (3) The Minimum Wages Act, 1948. (4) The Payment of
Wages Act, 1936. (5) The Employee’s Compensation Act,1923. (6) The Payment of Bonus Act.1965. (7) The
payment of Gratuity Act, 1972. (8) The Equal Remuneration Act, 1976 etc. to our establishment and Gujarat
Industries Power Company Limited.
THAT we have completed the execution of the said contractual job and now our final bill worth Rs……………../-
is pending for payment. We state and declare that we have complied with all related provisions of the laws as
applicable to our establishment and/or GIPCL during contractual period. In case any liabilities or responsibilities
whatsoever arise in respect of the permanent and/or temporary we shall bear full responsibilities thereof
(including that of sub- contractors) and shall meet with the requirement at any point of time, if the disputes is
raised either by workman or their union or by way of inspection remarks passed by Govt. Agencies.
THAT in consideration of the aforesaid liabilities due to us and/ or breach of any statutory provisions under any
law, if any we hereby agree to indemnify, save keep harmless the company against all recoveries, claims,
damages, costs and expenses which may be made against or suffered or incurred by Gujarat Industries Power
Company Limited, Baroda/ Nani-Naroli by any reason or consequence of such payment/s and or Liability/ies.
Name, Signature & Seal of Proprietor/Owner
TENDER NO: SLPP/BLR/METAL SPRAY/ARC/26-28 Page
PERFORMA CERTIFICATE
(No claim, No arbitration)
Addl General Manager (O&M)-SLPP
Gujarat Industries Power Company Limited, Surat
Lignite Power Plant,
Village: Nani Naroli, Ta. Mangrol, Dist.
Surat -394110 (Gujarat).
Ref: Work Order No.: ,Dated _
We hereby confirm with free consent as under:-
1. The measurements certified in final bill is full and final. We accept all the certified measurements and no
claim related to the measurement is left.
2. The payment certified in that or above referred Loll contract is full and final. We accept this, and no
claim related to payment is left.
3. The rates of the Lol I contract and its amendments are firm till completion of contract and
extension period. We shall not claim any escalation against these rates.
4. Along with the contract referred, the ARBITRATION CLAUSE also perishes i.e. we will not resort to
5. No extra items are left to be settled.
6. We do not have any claims against any item related to the Lol than those items certified in the bills.
7. We are accepting the recoveries or hold amount from our bills, if any, made by GIPCL against non-
compliance or as decided by GIPCL within terms & conditions of contract.
8. We have paid royalties, taxes for all the materials procured by us, for carrying out the works for above
Lol and we indemnify GlPCL from any liability arising thereof.
9. In case of any disputes arising in future related to payment of royalties, all liabilities of settlement of
dispute and its payment if any, will be borne by us.
10. We have paid wages to all the workmen who were deployed by us for carrying out above referred
work as per prevailing Minimum wages act. We have also fulfilled all requirements of the P.F. Act. We
have maintained all records necessary as per the statutory requirements. We hereby indemnify GIPCL
from any disputes arising in future related to payment of labours, Provident Fund, etc.. and confirm
that all liabilities of settlements of disputes and their payment is our responsibility.
The above confirmation will come into effect as soon as payment from final bill after due
recoveries will be received by us.
For, M/s. _ Signature,
Stamp and date.
TENDER NO: SLPP/BLR/METAL SPRAY/ARC/26-28 Page
Declaration cum Undertaking for Safety Laws and Regulations Compliance
(To be submitted on Company's Letter Head)
I ______________________on behalf of ......... Name of Party/Company ........... hereby confirm, agree and
undertake that all the Statutory and Safety Laws and Regulations of the applicable Authority/ies shall be
strictly followed for all types of works at the site during the period of the Contract, if awarded to me.
Signed and Stamped by the
Authorized Signatory
Declaration for Contractual Litigations
(To be submitted on Company's Letter Head)
Please Tick( V ) whichever is correct option
I __________on behalf of ......... Name of Party/Company ........... hereby confirm that I /We have
a. Not invoked legal recourse e.g. litigation against any Govt, of Gujarat Undertakings I Depts. I Authorities and
Govt. of Gujarat supported companies I undertakings I organizations for the last three( 03) years. There are no
ongoing/pending legal matter(s) with any of the Govt. of Gujarat Undertakings I GoG supported Companies,
including GIPCL.
Please Tick ( )
b. Invoked legal recourse e.g. litigation against any Govt, of Gujarat Undertakings I Depts. I Authorities and Govt.
of Gujarat supported companies I undertakings I organizations for the last three( 03) years.
Please Tick ( )
If "b" is applicable. please submit the details for the same.
The above is true, as on date, to the best of my knowledge. Any breach/ false statement in this regard shall
amount to disqualification of the Bid being submitted herein.
Signed and Stamped by the
Authorized Signatory
TENDER NO: SLPP/BLR/METAL SPRAY/ARC/26-28 Page
SCHEDULE OF DEVIATION FROM GENERAL AND TECHNICAL SPECIFICATIONS AND COMMERCIAL TERMS AND
All the deviations from the general and technical specifications shall be filled by BIDDER clause by clause in this
Sr. No SECTION CLAUSE NO AS PER TENDER DEVIATION
The bidder here by certifies that the above mentioned are the only deviations from OWNER’s General/ Technical
Conditions of this enquiry. The bidder further confirms that in the events any other data and information
presented in the BIDDER’s proposal and accompanying documents are at variance with specific requirements
laid out in the OWNER’s General /Technical Specifications, then the latter shall govern and will be binding on
the BIDDER for quoted price.
COMPANY SEAL SIGNATURE ……………….…
DESIGNATION …………….…..
COMPANY ………………..….…
TENDER NO: SLPP/BLR/METAL SPRAY/ARC/26-28 Page
PARTICULARS OF THE BIDDER
Sr. No. Particulars Please provide information here.
a. Registered Office Address:
2 b. Address for Correspondence:
Contact Details:
Contact Person Name
Telephone No. :
Year of establishment
Company Seal Signature:__________________
Designation:_______________
TENDER NO: SLPP/BLR/METAL SPRAY/ARC/26-28 Page
As per CLAUSE NO.05 Eligibility criteria for Metal spray coating with ARC spray process on the erosion
prone water wall tubes of Unit 1 to 4 CFBC Boiler.
Eligibility Criteria Year Rs. In Lacs Details Documents
Bidder should possess minimum
three years of experience during last
five years for metal spray work with
ARC/HVOF Spray Coating process in
CFBC/ PF Boilers and should enclose
the proof of the same….
Bidder should have executed at least
one work order for ARC/HVOF Spray
Coating in CFBC boiler in last five
Bidder shall submit necessary
evidence for the same like self-
attested copies of work orders and
Work Execution / work completion
certificates from clients. The work
completion certificate shall comprise
of Order value & Executed value.
Bidders should have executed the
work directly. The work executed as a
sub-contractor or subletting agency
shall not be taken in to consideration.
TENDER NO: SLPP/BLR/METAL SPRAY/ARC/26-28 Page
Bidder should produce evidence of
having experience of successfully
completed HVOF/ARC spray coating
works in CFBC/PF Boilers as defined
hereunder for during last Five years
ending last day of the month previous
to the one in which tender is invited,
satisfactory progress of ongoing
works etc. secured from clients along
with self attested copies of
documentary evidence preferably
photo copies of work experience. Jan-2021
a. One similar completed work each Dec-2025
costing not less than the amount
equal to Rs 15.75 Lacs with tax
b. Two similar completed work each
costing not less than the amount
equal to Rs 10.50 Lacs with tax.
c. Three similar completed work
each costing not less than the
amount equal to Rs 7.88 Lacs with
Contractor has to submit satisfactory
3 performance certificate from the
client for ARC/HVOF spray coating.
Bidder shall submit the Details of
Coating Wires that consists of
4 technical name, chemical
composition, origin of source,
certificate from the supplier.
Detail of Tender Fee
Bidder should have separate
Employees Provident Fund code
6 number towards registration of firm
with RPF commissioner.
Attested copies of relevant tender
documents duly signed & seal on
7 each & every page shall be
TENDER NO: SLPP/BLR/METAL SPRAY/ARC/26-28 Page
The bidders should have minimum
8 annual turnover of Rs. 7.88 Lacs for 2023-24
last three financial years.
The net worth of the bidder as on
9 31.03.2025 should be positive as Positive
evidenced from audited accounts.
Bidder shall furnish Annual audited
financial statement (duly verified by
the certified chartered accountant)
of the company for the years 2022-
demonstrate the financial soundness 2023-24
of the company. The balance Sheet
must be in the name of the company
who is purchasing the
tender document. Any type of MOU
for this purpose will not be
Bidder should possess valid PF
Number. Bid without proof of the
11 same shall be rejected. PF number
shall be from the state of Gujarat
The contractor should register
himself under the Contract Labour
12 Act submit the copy of registration
certificate and previous work order
Bidder has to submit GST number.
Copy of the same to be submitted.
The bidder has to submit INCOME
TAX Permanent Account Number
(PAN) of the firm. Copy of the same
to be submitted.
Declaration Cum Undertaking for
15 Safety Laws and Regulations
Declaration for Contractual
Disputes/ Litigations
TENDER NO: SLPP/BLR/METAL SPRAY/ARC/26-28 Page
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender Documents.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .