| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 CrAccepted-AOC | ₹2.1 Cr | L1 | Accepted-AOC Lowest |
| 2 | L2₹2.2 Cr+₹10.7 L (5.08%)Rejected-Finance | ₹2.2 Cr+₹10.7 L (5.08%) | L2 | Rejected-Finance Not Lowest |
| 3 | L3₹2.3 Cr+₹22.1 L (10.5%)Rejected-Finance 24 85 7 SANATH NAGAR GAJUWAKA VISAKHAPATNAM 530 026 | VISAKHAPATANAM | ANDHRA PRADESH | 530026 | ₹2.3 Cr+₹22.1 L (10.5%) | L3 | Rejected-Finance Not Lowest |
| 4 | Rejected-Technical | - | - | Rejected-Technical Non submission of cost of tender such as DD, EMD and documents fulfilling criteria for enlistment in B class not uploaded |
| 5 | Rejected-Technical | - | - | Rejected-Technical BOQ of PED not submitted. |
| Sl No | Description | Qty | Unit | kb technologies L1 | P SRINIVASA RAO L2 | V R K CONSTRUCTIONS L3 |
|---|---|---|---|---|---|---|
| 1.00 | Design, supply, fabricate and errection of pre-engineered building (PEB) steel structure for specialist vehicle shed all as specified and shown on drawings.
Foundation. 1. base plate and anchor bolts, to be provided as per load of PEB structure is included in lump sum price inserted by the tenderer.
2. Earth work, RCC works upto plinth level and flooring as given in Schedule 'A' Part-III or not inlcuded in lump sum price quoted against this item and shall be measured and paid separately.
PEB Structure. Structure shall be made up of primary members secondary members connections roof sheeting wall sheeting fixed fastners sealer, closures, ridge gap, flashing and trimming gutter and down spout to be provided as per design.
Roof sheets. Roof sheet 0.5mm thick pre painted semi corrugated galvalume zinc coating sheets having 550 MPA tensile strength and plain sheet for ridge. Provision to support the turbo ventilators at the roof and sky lighting to be made.
Sky lighting and turbo ventilator of 8 Nos shall be provided as shown on drawings. Transparent roof sheeting as in skylighting shall be upto 15% of total roof area to be made as per design/specification.
Roof Drainage system. Eaves gutters, pipes and accessories to be provided as per design.
Note: The structural components shown in the drawings are tentative, the contractor shall be responsible for the detailed design of the entire structure. | 1 | Lump Sum | 1,17,00,000 ₹1,17,00,000 | 1,12,59,999 ₹1,12,59,999 | 1,12,01,999 ₹1,12,01,999 Lowest |
| 2.00SCH 'A' PART-II to VII : Note: These schedules are pre-priced by MES and the rate indicated against the respective schedule under Col 6 signifies this fact only. The tenderer is required to quote their lumpsum amount under col 13 against item of works catered under these schedule . | ||||||
| 3.00 | Lumpsum price inserted under col 13 by the tenderer for SITE CLEARANCE, EARTH WORK EXCAVATION AND DEVELOPMENT as listed in Schedule ‘A’ Part II representing the percentege arrived under col 54 above/below the lumpsum estimated rate inserted under col 6 by the MES in Schedule ‘A’ Part II | 1 | Lump Sum | 7,50,000 ₹7,50,000 Lowest | 7,92,999 ₹7,92,999 | 9,59,999 ₹9,59,999 |
| 4.00 | Lumpsum price inserted under col 13 by the tenderer for BUILDING/STRUCTURE( UPTO PLINTH LEVEL) as listed in Schedule ‘A’ Part III representing the percentege arrived under col 54 above/below the lumpsum estimated rate inserted under col 6 by the MES in Schedule ‘A’ Part III | 1 | Lump Sum | 30,00,000 ₹30,00,000 Lowest | 45,99,999 ₹45,99,999 | 41,77,499 ₹41,77,499 |
| 5.00 | Lumpsum price inserted under col 13 by the tenderer for Road/Path/Culvert as listed in Schedule ‘A’ Part IV representing the percentege arrived under col 54 above/below the lumpsum estimated rate inserted under col 6 by the MES in Schedule ‘A’ Part IV | 1 | Lump Sum | 20,00,000 ₹20,00,000 Lowest | 23,49,999 ₹23,49,999 | 37,40,999 ₹37,40,999 |
| 6.00 | Lumpsum price inserted under col 13 by the tenderer for Area Drainage as listed in Schedule ‘A’ Part V representing the percentege arrived under col 54 above/below the lumpsum estimated rate inserted under col 6 by the MES in Schedule ‘A’ Part V | 1 | Lump Sum | 12,65,000 ₹12,65,000 | 10,89,999 ₹10,89,999 Lowest | 11,67,999 ₹11,67,999 |
| 7.00 | Lumpsum price inserted under col 13 by the tenderer for Retaining Wall as listed in Schedule ‘A’ Part VI representing the percentege arrived under col 54 above/below the lumpsum estimated rate inserted under col 6 by the MES in Schedule ‘A’ Part VI | 1 | Lump Sum | 11,50,000 ₹11,50,000 | 10,89,999 ₹10,89,999 | 9,67,199 ₹9,67,199 Lowest |
| 8.00 | Lumpsum price inserted under col 13 by the tenderer for Internal Electric Supply as listed in Schedule ‘A’ Part VII representing the percentege arrived under col 54 above/below the lumpsum estimated rate inserted under col 6 by the MES in Schedule ‘A’ Part VII | 1 | Lump Sum | 95,000 ₹95,000 Lowest | 1,35,999 ₹1,35,999 | 1,49,999 ₹1,49,999 |
| 9.00SCHEDULE 'A' PART-VIII (MISCELLANEOUS B/R AND E/M Items) Note: This schedule is not pre-priced by MES and the rate indicated as "Rs 0.00" under Col 6 signifies this fact only.The tenderer is required to quote their rate under col 13 against item of works catered under this schedule . | ||||||
| 10.00ROAD / PATH / CULVERT | ||||||
Tender Value
₹2.2 Cr
EMD Value
₹3.0 L
Closing Date
22 Apr 2026, 6:00 pmClosed
CHIEF ENGINEER RND SECUNDERABAD
CHIEF ENGINEER RND SECUNDERABAD OPP JUBILEE BUS STATION PICKET SECUNDERABAD 500003
CONSTRUCTION OF PARKING SHED FOR SPECIALIST VEHICLES AT INS KALINGA VISAKHAPATNAM SPECIAL WORK
2026_MES_756790_1
87174
Open Tender
Civil Works
Lump-sum
270 days
NSTL VISAKHAPATNAM
Class B
category a(i)
8 documents required · 8 mandatory
₹2,000
ASST GARRISON ENGINEER I RND NSTL VISAKHAPATNAM
₹3.0 L
Yes
16 Sept 2026
18 Mar 2026
24 Apr 2026
18 Mar 2026
22 Apr 2026
15 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | supply , fabrication & erection of pre-fabricated steel STRUCTURE / building is made up of primary members,secondary members, connections,roof sheeting,wall sheeting, sheeting fasteners,sealer,closures,ridge cap,flashing and trim,gutters and down spouts as in Parking shed for specialist vehicles complete all as as specified and shown on drawings. | 1 | Lump Sum | - | - |
| 2 | SCH 'A' PART-II to VII :
Note: These schedules are pre-priced by MES and the rate indicated against the respective schedule under Col 6 signifies this fact only. The tenderer is required to quote their lumpsum amount under col 13 against item of works catered under these schedule . | - | - | - | - |
| 3 | Lumpsum price inserted under col 13 by the tenderer for SITE CLEARANCE, EARTH WORK EXCAVATION AND DEVELOPMENT as listed in Schedule ‘A’ Part II representing the percentege arrived under col 54 above/below the lumpsum estimated rate inserted under col 6 by the MES in Schedule ‘A’ Part II | 1 | Lump Sum | 11,35,113.68 | ₹11,35,113.68 |
| 4 | Lumpsum price inserted under col 13 by the tenderer for BUILDING/STRUCTURE( UPTO PLINTH LEVEL) as listed in Schedule ‘A’ Part III representing the percentege arrived under col 54 above/below the lumpsum estimated rate inserted under col 6 by the MES in Schedule ‘A’ Part III | 1 | Lump Sum | 49,57,174.94 | ₹49,57,174.94 |
| 5 | Lumpsum price inserted under col 13 by the tenderer for Road/Path/Culvert as listed in Schedule ‘A’ Part IV representing the percentege arrived under col 54 above/below the lumpsum estimated rate inserted under col 6 by the MES in Schedule ‘A’ Part IV | 1 | Lump Sum | 25,72,320.18 | ₹25,72,320.18 |
| 6 | Lumpsum price inserted under col 13 by the tenderer for Area Drainage as listed in Schedule ‘A’ Part V representing the percentege arrived under col 54 above/below the lumpsum estimated rate inserted under col 6 by the MES in Schedule ‘A’ Part V | 1 | Lump Sum | 16,49,831.42 | ₹16,49,831.42 |
| 7 | Lumpsum price inserted under col 13 by the tenderer for Retaining Wall as listed in Schedule ‘A’ Part VI representing the percentege arrived under col 54 above/below the lumpsum estimated rate inserted under col 6 by the MES in Schedule ‘A’ Part VI | 1 | Lump Sum | 16,54,825.77 | ₹16,54,825.77 |
| 8 | Lumpsum price inserted under col 13 by the tenderer for Internal Electric Supply as listed in Schedule ‘A’ Part VII representing the percentege arrived under col 54 above/below the lumpsum estimated rate inserted under col 6 by the MES in Schedule ‘A’ Part VII | 1 | Lump Sum | 1,32,970 | ₹1,32,970 |
| 9 | SCHEDULE 'A' PART-VIII (MISCELLANEOUS B/R AND E/M Items)
Note: This schedule is not pre-priced by MES and the rate indicated as "Rs 0.00" under Col 6 signifies this fact only.The tenderer is required to quote their rate under col 13 against item of works catered under this schedule . | - | - | - | - |
| 10 | ROAD / PATH / CULVERT | - | - | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.71 MB
Tender87174.pdf
Tender Documents • 1.93 MB
BOQ_847711.xls
BOQ • 0.24 MB
PrepricedSchedule87174.pdf
Additional Documents • 0.26 MB
Drawings.rar
Additional Documents • 0.68 MB
87174_Postponement.pdf
PDF • 0.18 MB
87174Postponement.pdf
PDF • 0.18 MB
87174Amendment.pdf
PDF • 1.69 MB
Drawings.rar
PDF • 0.57 MB
87174Amendment2.pdf
PDF • 0.49 MB
87174Amendment2.pdf
PDF • 0.49 MB
Drawings.rar
PDF • 4.99 MB
87174Pre_Priced.pdf
PDF • 0.24 MB
Soil_investigation_report.pdf
PDF • 36.49 MB
87174Postponement.pdf
PDF • 0.18 MB
87174Postponement.pdf
PDF • 0.18 MB
87174Postponement.pdf
PDF • 0.18 MB
87174Postponement.pdf
PDF • 0.18 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .