Tender Value
₹14.2 L
EMD Value
₹29,000
Closing Date
19 Sept 2026, 4:00 pmClosed
Executive Engineer REW Kargil
Executive Engineer REW Kargil
Construction of Additional Class room (upto to Class VIII) MS Darket
2026_RDD_19547_3
e-Tender- 14 of REW Kargil UTL of 2026-27
Open Tender
Civil Works - Buildings
Percentage
Lotchum
Please refer Tender documents.
3 documents required · 3 mandatory
₹145
Executive Engineer REW Kargil
₹29,000
11 Sept 2026
11 Sept 2026
21 Sept 2026
11 Sept 2026
19 Sept 2026
12 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil : | 81.63 | cum | 300 | ₹24,489 |
| 2 | Ordinary Rock | 34.99 | cum | 550 | ₹19,244.5 |
| 3 | Disposal of earth/ earth filling from an avg 4km from site to disposal site@ 90% of total qty of item no 1 | 104.96 | cum | 300 | ₹31,488 |
| 4 | Dry stone pitching including supply of stones and preparing surface complete in foundation including carriage | 6.89 | cum | 1,440.5 | ₹9,925.05 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 6.6 | cum | 10,032.33 | ₹66,213.38 |
| 6 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement, 1:1½:3 (1 cement : 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size). | 4.19 | cum | 12,644.19 | ₹52,979.16 |
| 7 | Providing and laying in position cement concrete of specified grade excluding the, cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) 10% boulder | 23.24 | cum | 7,795.5 | ₹1,81,167.42 |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. | 970 | KG | 129.01 | ₹1,25,139.7 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for:Foundations, footings, bases for columns | 25 | sqm | 360 | ₹9,000 |
| 10 | 15 mm cement plaster on the rough side of single or half brick wall of mix :1:4 (1 cement: 4 fine sand) | 69.67 | sqm | 424.32 | ₹29,562.37 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.10 MB
BOQ_46261.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .