Tender Value
₹1.1 Cr
EMD Value
₹2.1 L
Closing Date
10 Aug 2026, 6:00 pm
EXECUTIVE ENGINEER WEST
Tehri Kothi, MG Marg, Lucknow - 226 001
CONSTRUCTION OF EV CHARGING STATION AT IZZATNAGAR, DISTRICT-BAREILLY
2026_UPSRT_1172019_1
618B/DA/W/TENDER/2026
Open Tender
Civil Works - Others
Percentage
BAREILLY
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
EXECUTIVE ENGINEER BUILDING DIVISON WEST
₹2.1 L
Yes
24 Jul 2026
24 Jul 2026
11 Aug 2026
24 Jul 2026
10 Aug 2026
24 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 461.86 | CUM. | 126.26 | ₹58,314.44 |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 184.62 | CUM. | 139.42 | ₹25,739.72 |
| 3 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete for all lift. | 200.83 | CUM. | 437.56 | ₹87,875.17 |
| 4 | Sand filling in plinth including supply of necessary quantity of sand from a distance not exceeding 8.00Kms. From the site of work including watering, dressing etc. labour & T &P etc. required for proper completion of work saplings of girth upto 30 ground level and removal of rubbish upto a distsnce of 50m out side the periphery of area cleared. under floor Local Sand | 468.27 | CUM. | 1,510.63 | ₹7,07,382.71 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : in 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) DSR 4.1.2 | 18.74 | CUM. | 5,932.86 | ₹1,11,181.8 |
| 6 | Providing and laying Cement concrete 1:4:8 (1cement :4 C. sand :8 graded stone ballast 40 mm. nominal size) including supply of all materials, labour and T&P etc. required for proper completion of the work and curing complete, also including cost of formwork in foundation. | 82.01 | CUM. | 4,845.39 | ₹3,97,370.43 |
| 7 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (1 cement : 5 coarse sand (zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal size
derived from natural sources) DSR 4.1.10 | 37.5 | CUM. | 4,636.69 | ₹1,73,875.87 |
| 8Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement Concrete of M25 grade with minimum cement content of 330 kg /cum | |||||
| 9 | All works upto plinth level | 117.02 | CUM. | 6,760.74 | ₹7,91,141.79 |
| 10 | All works above plinth level upto floor V level | 22.87 | CUM. | 6,800.33 | ₹1,55,523.55 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.64 MB
Bareilly.pdf
Tender Documents • 0.56 MB
BOQ_2200873.xls
BOQ • 0.43 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].