| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAccepted-AOC | ₹1.3 Cr Quoted ₹1.4 Cr | L1 | Accepted-AOC Low |
| 2 | L2₹2.0 Cr+₹62.7 L (45.5%)Rejected-AOC 2402 FIRST FLOOR SECTOR 79 S A S NAGAR PUNJAB | S A S NAGAR | PUNJAB | 140103 | ₹2.0 Cr+₹62.7 L (45.5%) | L2 | Rejected-AOC High |
| 3 | L3₹2.5 Cr+₹1.1 Cr (78.3%)Rejected-AOC LUDHIANA | ₹2.5 Cr+₹1.1 Cr (78.3%) | L3 | Rejected-AOC High |
Tender Value
₹1.3 Cr
EMD Value
₹2.5 L
Closing Date
22 Jul 2024, 12:00 pmClosed
Executive engineer
Executive engineer Ropar Canal And Ground Water Division, Water Resource Department Punjab
Estimate for concrete lining of Dehlon Distributary RD 52513-65500
2024_WR_122934_1
10/22A/2024-25
Open Tender
Civil Works - Canal
Item Rate
90 days
VILLAGE DEHLON NEAR LUDHIANA
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
Yes
₹2.5 L
Yes
ROPAR
6 Nov 2024
27 Jun 2024
22 Jul 2024
27 Jun 2024
22 Jul 2024
27 Jun 2024
4 Jul 2024
Amount
Ordinary Jungle Clearance of both banks of running Disty., Minors and Drains including Boundary road;-Discharge upto 1.5 cum/s
Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres.
Excavation of soil( any type ) using hydraulic excavator CK 90 excavation with hydraulic excavator of 0.9 cum capacity including cutting trimming bottom and side slopes in accordance with requirement of grades and cross sections, includingall lift and combined lead upto 60 mtr.
Excavation of Soil using Hyraulic Excavator and hydraulic Tractor Trolly I/C cutting and loading in Trolly and transporting to the embankment locations with all lifts and leads. (a) Disposal/carraige from 0 upto 450m
Excavation of Soil using Hyraulic Excavator and hydraulic Tractor Trolly I/C cutting and loading in Trolly and transporting to the embankment locations with all lifts and leads. (b) Disposal/ carraige additional beyond 450m upto 1Km
Excavation of Soil using Hyraulic Excavator and hydraulic Tractor Trolly I/C cutting and loading in Trolly and transporting to the embankment locations with all lifts and leads. (c) Disposal/carraige for every additional Km upto 10Km
Extra for laying earth as per specification for compaction in 20 Cm. layers and dressing including the cost of rolling and watering as per P.W.D specifications.
Earth work for lip cutting for lining of irrigation channels inclusive of all allowance leads and dressing( as per earth work statement) (a) 0-1.5mt. depth
Dismantling of old lining and brick work in cement sand and mortar.
Dressing of Earth work ( NEW )
Dressing and preparation of sub grade for side slopes.
Providing and laying Cement concrete (M-15) sleepers in bed and side slopes below the joints of concrete lining mixed in automatic computerized batching and mixing plant and transported to the site in transit mixers including supply carriage, loading & unloading of material complete in all respect as per design/drawing and PWD specifications IN SLEEPERS
Laying 1:3 (cement: water) cement slurry with cement @ 2.25 kg per sqmt on prepared bed & side slope before laying concrete
Cement concrete lining 75mm. thick or less laid manually for irrigation channels, using cement concrete M-15 with cement content 325 kg/cum mixed in an automatic computerized Batching & Mixing Plant and transported to the site in transit mixers with an average lead of 1 Km(FOR TRAPEZOIDAL SECTION AND CUP SECTION OF ALL RADII)
Providing and laying Cement concrete (M-15) for coping mixed in automatic computerized batching and mixing plant and transported to the site in transit mixers including supply ,carriage, loading & unloading of material complete in all respect as per design/drawing and PWD specifications IN COPING
Filling of construction joints with sealing compound as per drawings and technical specifications with coarse sand and 6 per cent bitumen by weight-10 mm depth
Filling expansion joints with special impervious hot pour 12.5 mm wide
Providing and laying LDPE 150 micron over sleeper on construction joints and expansion joints complete in all respect as per design/drawing and PWD specifications
Shuttering for faces of concrete lining on side slopes and bed complete in all respect as per design/drawing and PWD specifications
Applying Bitumen Primer on side of Lining and top of sleeper for construction joint,etc. complete in all respects
Earth work in excavation of foundation of structures as per drawing and technical specification,including setting out, construction of shoring and bracing, removal of stumps and other matter, dressing of sides and bottom and backfilling with excavated surplus soil in ordinary soil (B) Mechanical means Depth upto 3 mtr
Dismantling brickwork tile, masonary or tile lining in cement
Dismantling concrete in lime concrete, cement concrete of 1:6:12 or leaner mix
Backfilling behind abutment, wing wall and return wall complete as per drawing and technical specifications (b) Sandy material
Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications RCC Grade M20 Height upto 5m With Batching Plant, Transit Mixer and Concrete Pump
Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications RCC Grade M25 Height upto 5m With Batching Plant, Transit Mixer and Concrete Pump
Supplying, fitting and placing HYSD bar reinforcement in substructure complete as per drawing and Technical Specifications.
Cement concrete 1:4:8 (b) with stone aggregate 40mm gauge (ii) mixing by mechanical means using concrete mixer volumetric type
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanical mixed placed in foundation and compacted by vibration including curing for 14 days
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entiresurface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification.
Earth work involved in dismantling open flume A.P.M. or O.S.M. type outlets with 'H' more than 0.50 m but upto 0.90 m (including excavation, refilling, consolidation and dressing) .
Dismantling O.F., A.P.M. or O.S.M. type outlets consisting of total dismantling with 'H' more than 0.50 m but upto 0.90 m.
Extra labour for dressing bricks on O.F. and A.P.M. type outlets with 'H' more than 0.50 m but upto 0.90 m.
Cement concrete 1:4:8 with Stone Ballast 40 mm gauge using concrete mixer volume metric type
First class burnt brick work laid in cement sand mortar 1:3 in foundation and plinth.
RCC M-20 mechanically batch mixed with batch type concrete mixer as per IS 1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in foundation and plinth
Shuttering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering)
Centering & Shuttering for flat surfaces such as roofs, landings, chajjas, shelves etc.
Cold twisted detormed (Ribbed/ Tor steel) Bars (Fe 500 grade as per IS 1786-2008) , for R.C.C works, where not including in the complete rate of RCC including bending and binding placing in position complete
Laying RCC 1:2:4 M-15 batch mixed stone ballast or shingle
Bending binding and placing in position steel reinforcement 10 mm dia bars
Any Other Items
PARVEEN SEHGAL CONT.
R S BUILDERS
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .