Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.4 CrAdmitted-Finance ST NO 5R HIRA SINGH NAGAR KOTKAPURA | ₹5.4 Cr | L1 | Admitted-Finance |
| 2 | L2₹5.5 CrAdmitted-Finance | ₹5.5 Cr | L2 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-Original Demad Draft Original Bid Security and Original Affidavit not submit by bidder as per clause 12.2 (d) of ITB hence the bid of this Bidder is no admitted |
| Sl No | Description | Qty | Unit | OSHO ENGINEERING PVT.LTD. L1 | S K S CONSTRUCTIONS L2 |
|---|---|---|---|---|---|
| 0.00Construction of Work | |||||
| 1.00 | Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections.Specification Clause 302. MORD 3.5 | 886.48 | CuM (Cubic Metre) | 200 ₹1.8 L | 50 ₹44,324 |
| 2.00 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5. MORD 3.3 | 886.48 | CUM (Cubic Metre) | 35 ₹31,027 | 50 ₹44,324 |
| 3.00 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 mtr. Transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with all lead as per MoRD Specification clause 301.5. MORD 3.4 | 6,344.08 | CUM (Cubic Metre) | 280 ₹17.8 L | 350 ₹22.2 L |
| 4.00 | Dismentling of flexible pavements & disposel of dismentled materials upto lead of 100m stacking serviceable & un serviceable materials seperately as per Technical Specification clause 202. & Scarifying Existing Bituminous Surface to a Depth of 150 mm by Mechanical Means. MORD 2.14 | 121.16 | CUM (Cubic Metre) | 270 ₹32,713 | 350 ₹42,406 |
| 5.00 | Loosening, Levelling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Tables 300.1 and 300.2 for embankment construction as per Technical Specification Clause 301.4.1. MORD 3.15 | 163.6 | CUM (Cubic Metre) | 29 ₹4,744 | 50 ₹8,180 |
| 6.00 | Providing and laying of Brick on end edging 6.83cm wide, 11.11cm long and 22.86cm high half brick deep including excavation, refilling and disposal of surplus earth up to 50mtr complete as per Punjab PWD specifications | 1,168.24 | Metre | 85 ₹99,300 | 100 ₹1.2 L |
| 7.00 | Granular Sub Base - Construction of granular sub base by Laying and consolidation of scarified / dismantled pavement material by adding 20% coarse sand as per specification, carrying the stone metal from stacks, spreaded in uniform layer on prepared surface, mixing in place with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per MoRD specification clause 401. MORD 4.1 | 284.54 | CUM (Cubic Metre) | 250 ₹71,135 | 250 ₹71,135 |
| 8.00 | Granular Sub Base (Grading-I) - Construction of granular sub base by providing well graded material (Grade-I), spreaded in uniform layers on prepared surface, mixing in place with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per MoRD specification clause 401. MORD 4.1 | 353.39 | CUM (Cubic Metre) | 1,500 ₹5.3 L | 1,500 ₹5.3 L |
| 9.00 | Water Bound Macadam (Grading -II) - Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening ype-A/ binding materials to fill-up the interstices of coarse aggregate, watering and compacting to therequired density grading 2 as per MoRD Specification Clause 405. MORD 4.7 | 1,029.38 | CUM (Cubic Metre) | 1,950 ₹20.1 L | 2,000 ₹20.6 L |
Tender Value
₹5.4 Cr
EMD Value
₹10.9 L
Closing Date
15 May 2026, 9:00 amClosed
Executive Engineer C Punjab Mandi Board MOGA
Executive Engineer C Punjab Mandi Board MOGA
UP-GRADATION OF LINK ROAD UPGRADATION OF LINK ROAD BAGHAPURANA MUDKI ROAD ODR 06 RD 6.30 TO TR13 BHALOOR VIA NATHU WALA NATHE WALA. Package No. PB-12065 UNDER PMGSY III BATCH. II Year 2023.24 Length 7.87 KM Balance Work
2026_AGRI_147383_1
Moga-12065.1
Open Tender
Civil Works - Roads
360 days
MC BAGHAPURANA
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
Executive Engineer Civil Punjab Mandi Board
₹10.9 L
5 Jun 2026
1 May 2026
15 May 2026
1 May 2026
15 May 2026
1 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 0 | Construction of Work | - | - | - | - | BI01010001010000000000000515BI0100001112 |
| 1 | Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections.Specification Clause 302. MORD 3.5 | 886.48 | CuM (Cubic Metre) | 1 | ₹886.48 | - |
| 2 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5. MORD 3.3 | 886.48 | CUM (Cubic Metre) | 2 | ₹1,772.96 | - |
| 3 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 mtr. Transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with all lead as per MoRD Specification clause 301.5. MORD 3.4 | 6,344.08 | CUM (Cubic Metre) | 1 | ₹6,344.08 | - |
| 4 | Dismentling of flexible pavements & disposel of dismentled materials upto lead of 100m stacking serviceable & un serviceable materials seperately as per Technical Specification clause 202. & Scarifying Existing Bituminous Surface to a Depth of 150 mm by Mechanical Means. MORD 2.14 | 121.16 | CUM (Cubic Metre) | 237.87 | ₹28,820.33 | - |
| 5 | Loosening, Levelling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Tables 300.1 and 300.2 for embankment construction as per Technical Specification Clause 301.4.1. MORD 3.15 | 163.6 | CUM (Cubic Metre) | 55.74 | ₹9,119.06 | - |
| 6 | Providing and laying of Brick on end edging 6.83cm wide, 11.11cm long and 22.86cm high half brick deep including excavation, refilling and disposal of surplus earth up to 50mtr complete as per Punjab PWD specifications | 1,168.24 | Metre | 1,368.84 | ₹15,99,133.64 | - |
| 7 | Granular Sub Base - Construction of granular sub base by Laying and consolidation of scarified / dismantled pavement material by adding 20% coarse sand as per specification, carrying the stone metal from stacks, spreaded in uniform layer on prepared surface, mixing in place with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per MoRD specification clause 401. MORD 4.1 | 284.54 | CUM (Cubic Metre) | 1,808.07 | ₹5,14,468.24 | - |
| 8 | Granular Sub Base (Grading-I) - Construction of granular sub base by providing well graded material (Grade-I), spreaded in uniform layers on prepared surface, mixing in place with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per MoRD specification clause 401. MORD 4.1 | 353.39 | CUM (Cubic Metre) | 12.62 | ₹4,459.78 | - |
| 9 | Water Bound Macadam (Grading -II) - Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening ype-A/ binding materials to fill-up the interstices of coarse aggregate, watering and compacting to therequired density grading 2 as per MoRD Specification Clause 405. MORD 4.7 | 1,029.38 | CUM (Cubic Metre) | 13.62 | ₹14,020.16 | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.53 MB
Drawings.pdf
Additional Documents • 18.40 MB
SBD12065.pdf
Tender Documents • 3.80 MB
BOQ_229876.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid