Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 CrAdmitted-Finance | ₹1.6 Cr | L1 | Admitted-Finance |
| 2 | L2₹84.7 L−₹72.3 L (46.0%)Admitted-Finance | ₹84.7 L−₹72.3 L (46.0%) | L2 | Admitted-Finance |
| 3 | L3₹63.8 L−₹93.2 L (59.4%)Admitted-Finance | ₹63.8 L−₹93.2 L (59.4%) | L3 | Admitted-Finance |
| 4 | L3₹65.1 L−₹91.8 L (58.5%)Admitted-Finance | ₹65.1 L−₹91.8 L (58.5%) | L3 | Admitted-Finance |
| 5 | L4₹1.5 Cr−₹9.2 L (5.87%)Admitted-Finance | ₹1.5 Cr−₹9.2 L (5.87%) | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Theme Engineering Services Pvt Ltd L1 | Sterling Indo Tech Consultants Pvt Ltd. L3 | Spectrum Techno Consultants Pvt Ltd L4 | K and J Projects Pvt Ltd L5 | Jindals Consortium L3 | Oms infra consultants Pvt. Ltd. L2 |
|---|---|---|---|---|---|---|---|---|---|
| 10.00 | Local Consultants
Remuneration for Local Professional Staff
(inclusive of per diem allowance) | 1 | Nos | 41,90,000 ₹41,90,000 | 12,30,000 ₹12,30,000 Lowest | 60,90,000 ₹60,90,000 | 54,25,000 ₹54,25,000 | 21,40,000 ₹21,40,000 | 36,45,000 ₹36,45,000 |
| 20.00 | Support Staff (inclusive of per diem allowance) | 1 | Nos | 4,60,000 ₹4,60,000 | 4,54,050 ₹4,54,050 | 4,60,000 ₹4,60,000 | 7,10,000 ₹7,10,000 | 1,50,000 ₹1,50,000 Lowest | 3,75,000 ₹3,75,000 |
| 30.00 | Transportation | 1 | Nos | 5,00,000 ₹5,00,000 | 35,000 ₹35,000 Lowest | 3,50,000 ₹3,50,000 | 5,00,000 ₹5,00,000 | 50,000 ₹50,000 | 1,50,000 ₹1,50,000 |
| 40.00 | Duty Travel to Site | 1 | Nos | 80,000 ₹80,000 | - | 1,00,000 ₹1,00,000 | 1,30,000 ₹1,30,000 | 1,00,000 ₹1,00,000 | 28,000 ₹28,000 Lowest |
| 50.00 | Office Rent | 1 | Nos | 2,00,000 ₹2,00,000 | 18,000 ₹18,000 Lowest | 90,000 ₹90,000 | 2,00,000 ₹2,00,000 | 1,00,000 ₹1,00,000 | 1,20,000 ₹1,20,000 |
| 60.00 | Office Supplies, Utilities and Communication | 1 | Nos | 80,000 ₹80,000 | 36,000 ₹36,000 | 2,40,000 ₹2,40,000 | 1,60,000 ₹1,60,000 | 20,000 ₹20,000 Lowest | 60,000 ₹60,000 |
| 70.00 | Office Furniture and Equipment (Rental) | 1 | Nos | 50,000 ₹50,000 | 5,001 ₹5,001 Lowest | 50,000 ₹50,000 | 2,00,000 ₹2,00,000 | 1,00,000 ₹1,00,000 | 1,00,000 ₹1,00,000 |
| 80.00 | Reports and Document Printing | 1 | Nos | 62,500 ₹62,500 Lowest | 89,000 ₹89,000 | 1,81,000 ₹1,81,000 | 2,85,000 ₹2,85,000 | 89,000 ₹89,000 | 70,450 ₹70,450 |
| 90.00Surveys & Investigations | |||||||||
| 90.10 | Topographical Survey | 1 | Nos | 11,55,000 ₹11,55,000 | 10,36,860 ₹10,36,860 | 7,75,500 ₹7,75,500 | 6,60,000 ₹6,60,000 | 4,29,000 ₹4,29,000 Lowest | 4,95,000 ₹4,95,000 |
Tender Value
Refer Docs
Closing Date
30 Aug 2021, 3:00 pmClosed
SE RandB NH Circle, Hyderabad
Errumanzil, Hyderabad
Consultancy services for Detailed Project Report for 6 Laning of Pune Hyderabad Section of NH 65 from Km 493.0 to 524.0 from Sangareddy X roads to Madinaguda in the State of Telangana
2021_MoRTH_638791_1
SE RandB NH HYD 10 2021 22, dt. 29.05.2021
Open Tender
Consultancy
Works
300 days
telangana
Please refer Tender documents.
5 documents required · 5 mandatory
₹5,000
Regional Pay and Accounts Officer, NH, MoRTH
Exempted
O o Engineer in Chief RandB NH Errumanzil, Hyd
27 Dec 2021
15 Jul 2021
31 Aug 2021
15 Jul 2021
30 Aug 2021
15 Jul 2021
15 Jul 2021 - 2 Aug 2021
2 Aug 2021
Amount
Local Consultants Remuneration for Local Professional Staff (inclusive of per diem allowance)
Support Staff (inclusive of per diem allowance)
Transportation
Duty Travel to Site
Office Rent
Office Supplies, Utilities and Communication
Office Furniture and Equipment (Rental)
Reports and Document Printing
Surveys & Investigations
Topographical Survey
Investigations
Net work survey and GPR
Cost of supply and fixining boundary pillars
Land acquisition Team including support staff and logistics/transportation
Sub Total for Local Consultants
Foreign Consultants
Remuneration for Expatriate Staff
Mobilization and Demobilization
Total Cost net of Tax:
Taxes & Duties
Income Tax (Expariate)
Other Taxes / Duties (if any) Specify clearly
Total Cost net of Goods &Service Tax**
Goods & Service Tax
Sub Total Including GST
Description of Work / Item(s)
Amount
A. Topographical Survey (Fixed Rate)
Topographic Survey including hire charges for equipment and supply of survey Teams comprising of project survey field staff etc. inclusive of cost of materials , labourer.
Detailed topographic surveys using Air Borne Tomography and Air Borne LiDAR Technology
Description of Work / Item(s)
Amount
Road and Bridge Inventory
FWD Test and Pavement Evaluation
Roughness Survey
Axle Load Survey
Material Survey and Investigation
Sub-grade Investigation
Traffic Survey
Socio-economic & Census Survey/ Studies
Land Acquisition Studies
Any other investigations/surveys
Sub Total
Sub-Soil Investigation (Boring) Rate (INR) Quantity Amount (INR) Amount (INR) in Words
a) Boring in all type of soils (other than hard rock) (in meter )
b)Boring in hard rock (in meter )
Sub Total
Note:* Quantities of borings shall be taken from Financial Proposal Form No.V.For financial evaluation,the sequantities and rates quoted by the consultant will be considered. However, Payment shall be made on the actual quantity of boring at rates quoted above by the Consultant, which may be substantially more or less than the estimated quantities.
Description of Work / Item(s)
Amount
Net work Survey of the existing Highways as a responsitory for civil work as per direction from Authority
GPR Survey for detection of under ground utilities
Description of Work / Item(s)
Amount
Procuring and fixing boundary pillars and its installation, complete in all respect as per IRC:25,1967:Wherever the proposed alignment follows the existing alignment, the boundary pillars shall be fixed at an interval of 200m on either side of proposed Right of Way. Wherever there is a proposal of realignment of the existing Highway and/or construction of New Bypasses, Consultant shall fix boundary pillars along the proposed alignment on the extreme boundary on either side of the project Highway at 50 m interval. (lumpsum )
Description of Work / Item(s)
Amount
A Land Acquisition Team including support staff :
Ex-Land revenue inspector/officer or equivalent
EX-kanoogo/Girdwar or equivalent
Ex-Patwari or equivalent
typist
Total
Number of land acquisition teams (ONE ONLY )
Grand total for all Land Acquisition teams (A)
B: Logistic for Land Acquisition Team :
computer including necessary peripherals
printers
Vehicles(Bolero or equivalent )with monthly running limit of 4000 km
Total
Number of land acquisition teams (ONE ONLY )
Grand Total (B)
Grand total for all Land Acquisition teams And Logistics (A) + (B)
Description of Work / Item(s)
Amount
Staff 1
Staff 2
Staff 3
Staff 4
Staff 5
Staff 6
Description of Work / Item(s)
Amount
Position 1
Position 2
Position 3
Position 4
Inland Travel in Home Country (Fixed Costs)
Description Lump Sum RATE Amount
Airlines
Other Miscellaneous expenses ( like DA, internal travel expenses other incidentals)(fixed cost)
Description Lump Sum RATE Amount
Other Miscellaneous expenses (like DA, internal travel expenses other incidentals)
Sub Total for Mobilization and Demobilization
Description of Work / Item(s)
Amount
A. Professional Staff
Team Leader cum Senior Highway Engineer
Senior Bridge Engineer
Highway cum Pavement Engineer
Material-cum-Geotechnical Engineer- Geologist
Senior Survey Engineer
Trafic and Safety Expert
Environmental Specialist
Quantity Surveyor/Documentation Expert
Land Acquisition Expert
Utility Expert
Sub Total
B: Sub Professional Staff (To be assessed by Consultant as per requirement of assignment and one sub-professional be a fresh graduate)
To be filled by Consultant
To be filled by Consultant
To be filled by Consultant
To be filled by Consultant
To be filled by Consultant
To be filled by Consultant
To be filled by Consultant
Sub Total
Description of Work / Item(s)
Amount
Office Manager
Typist
Office Boy
Night Watchman
Description of Work / Item(s)
Amount
The vehicles provided by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. A. For use of consultants
Description of Work / Item(s)
Amount
Duty Travel to Site
Description of Work / Item(s)
Amount
The rent cost includes maintenance, Cleaning, repairs, etc.
Description of Work / Item(s)
Amount
Office Supplies Drafting
Supplies computer
Running Costs
Domestic and International Communication
Description of Work / Item(s)
Amount
Office Furniture and Equipment
Description of Work / Item(s)
Amount
Monthly Report (per month)
Inception Report & QAP
Environment and Social Impact Screening Report
Draft Feasibility Report
Final Feasibility Report
Strip Plan with L.A. Reports
Draft LA and Clearances I Report
Final LA and Clearances I Report
Draft Environmental Assessment report & RAP
Final Environmental Assessment report & RAP
Draft Detailed Design Report & Drawings etc.
Draft EMP
Draft Bidding Documents
Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings ,etc
Final EMP
Final Bidding Documents
Draft 3(a) ,3(A) and 3(D) notification for land acquisition ( 3 copies each)
LA & Clearances II Report
Sterling Indo Tech Consultants Pvt Ltd.
Oms infra consultants Pvt. Ltd.
Spectrum Techno Consultants Pvt Ltd
K and J Projects Pvt Ltd
Theme Engineering Services Pvt Ltd
Oms infra consultants Pvt. Ltd.
K and J Projects Pvt Ltd
Spectrum Techno Consultants Pvt Ltd
Sterling Indo Tech Consultants Pvt Ltd.
Theme Engineering Services Pvt Ltd
Oms infra consultants Pvt. Ltd.
K and J Projects Pvt Ltd
Jindals Consortium
Spectrum Techno Consultants Pvt Ltd
Theme Engineering Services Pvt Ltd
Theme Engineering Services Pvt Ltd
Oms infra consultants Pvt. Ltd.
Spectrum Techno Consultants Pvt Ltd
K and J Projects Pvt Ltd
Sterling Indo Tech Consultants Pvt Ltd.
Jindals Consortium
Oms infra consultants Pvt. Ltd.
K and J Projects Pvt Ltd
Sterling Indo Tech Consultants Pvt Ltd.
Theme Engineering Services Pvt Ltd
Spectrum Techno Consultants Pvt Ltd
Oms infra consultants Pvt. Ltd.
Sterling Indo Tech Consultants Pvt Ltd.
Theme Engineering Services Pvt Ltd
K and J Projects Pvt Ltd
Jindals Consortium
Oms infra consultants Pvt. Ltd.
Theme Engineering Services Pvt Ltd
Spectrum Techno Consultants Pvt Ltd
Sterling Indo Tech Consultants Pvt Ltd.
Theme Engineering Services Pvt Ltd
Sterling Indo Tech Consultants Pvt Ltd.
Spectrum Techno Consultants Pvt Ltd
K and J Projects Pvt Ltd
Oms infra consultants Pvt. Ltd.
Jindals Consortium
Oms infra consultants Pvt. Ltd.
Theme Engineering Services Pvt Ltd
K and J Projects Pvt Ltd
Spectrum Techno Consultants Pvt Ltd
Oms infra consultants Pvt. Ltd.
Sterling Indo Tech Consultants Pvt Ltd.
Theme Engineering Services Pvt Ltd
Spectrum Techno Consultants Pvt Ltd
K and J Projects Pvt Ltd
Jindals Consortium
Oms infra consultants Pvt. Ltd.
Spectrum Techno Consultants Pvt Ltd
K and J Projects Pvt Ltd
Theme Engineering Services Pvt Ltd
Oms infra consultants Pvt. Ltd.
Theme Engineering Services Pvt Ltd
Spectrum Techno Consultants Pvt Ltd
Jindals Consortium
K and J Projects Pvt Ltd
Spectrum Techno Consultants Pvt Ltd
Jindals Consortium
Oms infra consultants Pvt. Ltd.
K and J Projects Pvt Ltd
Theme Engineering Services Pvt Ltd
Sterling Indo Tech Consultants Pvt Ltd.
Oms infra consultants Pvt. Ltd.
Theme Engineering Services Pvt Ltd
K and J Projects Pvt Ltd
Spectrum Techno Consultants Pvt Ltd
Spectrum Techno Consultants Pvt Ltd
Theme Engineering Services Pvt Ltd
Jindals Consortium
Oms infra consultants Pvt. Ltd.
K and J Projects Pvt Ltd
Oms infra consultants Pvt. Ltd.
Sterling Indo Tech Consultants Pvt Ltd.
Jindals Consortium
Spectrum Techno Consultants Pvt Ltd
K and J Projects Pvt Ltd
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .