Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.1 LAccepted-AOC | ₹9.1 L | L1 | Accepted-AOC L1 |
| 2 | L2₹9.3 LRejected-AOC BOALIA PO GARIA 700084 | 24 PARAGANAS SOUTH | WEST BENGAL | 700084 | ₹9.3 L | L2 | Rejected-AOC L2 |
| 3 | L2₹9.3 LRejected-AOC 14 4A KALI PRASAD C HAKRABORTY ST CAL KOLKATA 700003 | KOLKATA | WEST BENGAL | 700003 | ₹9.3 L | L2 | Rejected-AOC L2 |
Tender Value
₹9.1 L
EMD Value
₹18,161
Closing Date
5 Mar 2026, 11:00 amClosed
E.O,RAJPUR SONARPUR MUNICIPALITY
RAJPUR SONARPUR MUNICIPALITY
Road restoration work at A) Mach Bazar Katpole to Loknath Mandir via Amantran Club B)Saha Pachil to shop of Nanna C) Policepara auto stand to Cake Factory in Ward no.02 under Rajpur Sonarpur Municipality.
2026_MAD_1013458_1
WBMAD/ULB/RSM/2118/25-26
Open Tender
CIVIL WORKS
60 days
RAJPUR SONARPUR MUNICIPALITY
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹18,161
20 May 2026
25 Feb 2026
7 Mar 2026
25 Feb 2026
5 Mar 2026
25 Feb 2026
Construction of Sub Base using Local Materials, spreading in uniform layers with Motor grader on prepared surface, including screening the metal as necessary, mixing by mix in place method with Rotavator at OMC, and compacting with vibratory roller to achieve the desired density, lighting, guarding and barricading including cost and carriage of all materials and making necessary earthen bundh of one metre wide on each side to protect the edges complete as per Clause 401 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).(i) For Construction of Sub Base by compacting 1st class brick aggregates (40 mm down) and sand (in proportion of 60:40).(Unit Rate Vide Item No. 4.09 i (Ref.P 247 of PWSOR VOL.-III (effective from 30.08.2018))
Repairing pot-holes and making up small depressions with ramming or power rolling including screening, cleaning chips or metals and washing, drying as necessary and heating the chips or metal where necessary, cutting pot holes to regular shapes with vertical edges, cleaning the disintegrated materials, heating matrix and applying tack coat (including sides), finishing the top of repaired surface levelled with adjoining area, including cost and carriage of stone aggregates and matrix, excluding cost of applying tack coat. [Tack coat is to be considered separately] ii) By grouting method using matrix @ 70 kg / m3 of loose net volume of course aggregate. Requirement of key aggregate may be taken as 10% of coarse aggregate and size 11.2 mm.
Water Bound Macadam Sub Base by consolidating Jhama metal / Laterite chelly or stone metal /shingles of specific size in hard crust to requisite thickness (measured after compaction) in layers including screening of metals etc. as necessary, hand packing, sweeping, watering and rolling instages with power roller to proper line, grade and camber, lighting, guarding & barricading and making necessary earthen bundh of one metre width on each side where necessary to protect edges and preparing the bed by necessary cutting or filling and rolling all complete including the cost of all materials and hire and labour charges of all men and machineries and compacting to the required density, as per Clause 404 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (i) For Construction of Sub Base by consolidating Jhama metal (63 mm to 45 mm) with moorum screening :
Providing and applying tack coat with Cationic Bitumen Emulsion of approved grade conforming to IS: 8887-1978 on the prepared surface cleaned with Hydraulic broom, moistening the surface including cost and carriage of emulsion, hire charges of machinery and labour, cost of fuel and lubricants all complete as per Clause 503 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (i) On Bituminous Surface (Using Bitumen Emulsion at the rate of 0.20 to 0.30 kg per sqm.)
Labour Welfare Cess @ 1%
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.73 MB
BOQ_2489279.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid