Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.4 LAdmitted-Fee/PreQual/Technical/Finance | -0.01% | ₹1.4 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹1.4 L+₹14.50 (0.01%)Admitted-Fee/PreQual/Technical/Finance | +0.00% | ₹1.4 L+₹14.50 (0.01%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-Adjoining area certificate issued by BDO not uploaded |
Tender Value
₹1.4 L
EMD Value
₹2,900
Closing Date
26 Aug 2026, 6:00 pmClosed
EXECUTIVE ENGINEER REW GANDERBAL
EXECUTIVE ENGINEER REW GANDERBAL
Construction of road from main road to H/o Shakeel Ahmad Margay at Gundi Rehman at Harran Block Sherpathri PRI 549 2nd Call
2026_RDPR_321596_14
E NIT No. 93/2026-27 of REW Ganderbal
Open Tender
Civil Works
Percentage
30 days
RDD AND PR
Please refer Tender documents.
3 documents required · 3 mandatory
₹200
Rural Development and Panchayati Raj
₹2,900
4 Sept 2026
20 Aug 2026
27 Aug 2026
20 Aug 2026
26 Aug 2026
20 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:All kinds of soil : | 2.97 | cum | 479.3 | ₹1,423.52 |
| 2 | Providing and laying dry stone solling hand packed including all carriages.and h/l of 50 meters | 0.65 | cum | 1,000 | ₹650 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 5.95 | cum | 5,733.6 | ₹34,114.92 |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns etc. for mass concrete. | 39.02 | sqm | 286.35 | ₹11,173.38 |
| 5 | 12mm Cement plaster of mix: 1 : 6 ( 1 cement : 6 fine sand) | 32.52 | sqm | 266.2 | ₹8,656.82 |
| 6 | Carriage of for sand and bajri for an avg lead of 15kms | 8.55 | cum | 340 | ₹2,907 |
| 7 | Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m in -All kinds of soil | 147.16 | sqm | 24.12 | ₹3,549.5 |
| 8 | Providing and laying GSB/ Nallah muck including spreading levelling and rolling including all carriages | 44.85 | cum | 1,150 | ₹51,577.5 |
| 9 | Supplying and stacking at site Laying, spreading and compacting stone aggregate of specified sizes to WBM specifications in uniform thickness, hand picking, rolling with 3 wheeled road / vibratory roller 8-10 tonne capacity in stages to proper grade and camber, applying and brooming requisite type of screening 18% /binding material 12% to fill up interstices of coarse aggregate, watering and compacting to the required density. including all carriages | 11.21 | cum | 2,600 | ₹29,146 |
| 10 | signboard ,photographs and unforseen items. | 1 | job | 1,800 | ₹1,800 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.61 MB
BOQ_1074725.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .