| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.2 LAdmitted-Finance | ₹5.2 L | L1 | Admitted-Finance |
| 2 | L2₹5.2 LAdmitted-Finance | ₹5.2 L | L2 | Admitted-Finance |
| 3 | L3₹5.3 LAdmitted-Finance | ₹5.3 L | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | BHUENDER SINGH L1 | Chhaminder Lal L2 | ANOKH RAM L3 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundations, trenches etc.in all kind of soil in all leads and lifts such as pick work, jumper work in saturated/unsaturated soil including bailing out water, blasting work in hard/ soft rock or chiseling in hard/soft rock where blasting is prohibited in all lifts stacking the excavated earth not more than 3 mtrs clear from the edge of excavation and then returning the stacked soil in 15 cm layers when required into plinths sides of each deposited layer by ramming and watering and then disposing of all surplus excavated earth foundations etc., consolidating as directed within all leads and lifts and handing over the useable materials available from excavation to department free of cost to the entire staisfaction of Engineer-in-charge with in all leads and lifts. | 39.1 | Cum. | 598 ₹23,381.80 | 600 ₹23,460 | 650 ₹25,415 |
| 2.00 | Providing and laying cement concrete 1:3:6 (1cement :3 sand :6 graded stone aggregate 40mm nominal size) and curing complete excluding the cost of form work in in foundation and plinth. | 2.66 | Cum | 9,955 ₹26,480.30 | 10,000 ₹26,600 | 10,500 ₹27,930 |
| 3.00Providing & laying reinforcement cement concrete 1:1.5:3(1cement:1½ sand:3graded stone agregate of 20mm nominal size) curing complete excluding cost of from work and reinforcemenr for reinforced concrete work including all leads and lifts. | ||||||
| 3.01 | Foundations , footings bases of columns and the like and mass concrete work complete in all respect. | 4.19 | Cum | 12,380 ₹51,872.20 | 12,500 ₹52,375 | 12,500 ₹52,375 |
| 3.02 | Walls any thikness but not less that 0.10 Mtrs thickness including attached pilasters, buttresses plinth and string courses etc, from top of foundation (level) upto floor two level including all leads and lifts etc. complete in all respect. | 7.91 | Cum | 12,403 ₹98,107.73 | 12,500 ₹98,875 | 13,000 ₹1.0 L |
| 4.00 | Providing and laying cement concrete 1:4:8 (1cement :4 sand :8 graded stone aggregate 40mm nominal size) and curing complete excluding the cost of form work in in foundation and plinth. | 1.05 | Cum | 9,428 ₹9,899.40 | 9,500 ₹9,975 | 10,000 ₹10,500 |
| 5.00 | Random rubble masonry/polygonal rubble masonry un-coursed/brought to courses with hard stone of approved quality in foundation and plinth including leveling up with cement concrete 1:6:12 (1cement :6 sand :12 graded stone aggregate 20mm nominal size) in Cement mortar 1:6(1cement : 6sand) with in all leads and lifts as per the direction of Engineer-in-Charge. | 6.75 | Cum | 9,085 ₹61,323.75 | 9,100 ₹61,425 | 9,100 ₹61,425 |
| 6.00Providing and laying cement concrete 1:2:4 (1cement :2 sand :4 graded stone agg. 20mm nominal size) and curing complete excluding the cost of form work in | ||||||
| 6.01 | Foundation, footings, bases of columns and the like mass concrete in all leads and lifts. | 0.15 | Cum | 11,338 ₹1,700.70 | 11,400 ₹1,710 | 11,500 ₹1,725 |
| 7.00 | Fixing of fencing pannel arround the WTP including all leads and lifts etc. complete in all leads and lifts. | 30 | Each | 205 ₹6,150 | 210 ₹6,300 | 220 ₹6,600 |
Tender Value
₹5.1 L
EMD Value
₹10,209
Closing Date
30 Mar 2026, 11:00 amClosed
EE Jal shakti Division Katrain
EE Jal shakti Division Katrain
SH-C/o Sedimentation tank and C/o boundary wall around WTP with fencing pannel) (under PDNA at Sr. No. 2805)
2026_HPIPH_132224_6
EE Katrain 109561-600 dated 20.03.2026
Open Tender
Civil Works
60 days
Katrain
Please refer Tender documents.
2 documents required · 2 mandatory
₹350
₹10,209
4 Apr 2026
23 Mar 2026
30 Mar 2026
23 Mar 2026
30 Mar 2026
23 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
Excavation in foundations, trenches etc.in all kind of soil in all leads and lifts such as pick work, jumper work in saturated/unsaturated soil including bailing out water, blasting work in hard/ soft rock or chiseling in hard/soft rock where blasting is prohibited in all lifts stacking the excavated earth not more than 3 mtrs clear from the edge of excavation and then returning the stacked soil in 15 cm layers when required into plinths sides of each deposited layer by ramming and watering and then disposing of all surplus excavated earth foundations etc., consolidating as directed within all leads and lifts and handing over the useable materials available from excavation to department free of cost to the entire staisfaction of Engineer-in-charge with in all leads and lifts. | - | Cum. | - | - | itemH1Code1 | |
Providing and laying cement concrete 1:3:6 (1cement :3 sand :6 graded stone aggregate 40mm nominal size) and curing complete excluding the cost of form work in in foundation and plinth. | - | Cum | - | - | code1.02 | |
Providing & laying reinforcement cement concrete 1:1.5:3(1cement:1½ sand:3graded stone agregate of 20mm nominal size) curing complete excluding cost of from work and reinforcemenr for reinforced concrete work including all leads and lifts. | - | - | - | - | code1.03 | |
Foundations , footings bases of columns and the like and mass concrete work complete in all respect. | - | Cum | - | - | code1.04 | |
Walls any thikness but not less that 0.10 Mtrs thickness including attached pilasters, buttresses plinth and string courses etc, from top of foundation (level) upto floor two level including all leads and lifts etc. complete in all respect. | - | Cum | - | - | code1.05 | |
Providing and laying cement concrete 1:4:8 (1cement :4 sand :8 graded stone aggregate 40mm nominal size) and curing complete excluding the cost of form work in in foundation and plinth. | - | Cum | - | - | code1.06 | |
Random rubble masonry/polygonal rubble masonry un-coursed/brought to courses with hard stone of approved quality in foundation and plinth including leveling up with cement concrete 1:6:12 (1cement :6 sand :12 graded stone aggregate 20mm nominal size) in Cement mortar 1:6(1cement : 6sand) with in all leads and lifts as per the direction of Engineer-in-Charge. | - | Cum | - | - | code1.07 | |
Providing and laying cement concrete 1:2:4 (1cement :2 sand :4 graded stone agg. 20mm nominal size) and curing complete excluding the cost of form work in | - | - | - | - | code1.08 | |
Foundation, footings, bases of columns and the like mass concrete in all leads and lifts. | - | Cum | - | - | code1.09 | |
Fixing of fencing pannel arround the WTP including all leads and lifts etc. complete in all leads and lifts. | - | Each | - | - | code1.10 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.43 MB
Terms.pdf
Tender Documents • 0.12 MB
BOQ_195508.xls
BOQ • 0.40 MB
Form6.pdf
Tender Documents • 0.37 MB
Form8.pdf
Tender Documents • 1.19 MB
Download all tender documents and submit your bid