Loading…
Loading…
Tender Value
₹6.0 L
EMD Value
₹7,504
Closing Date
12 Sept 2026, 5:00 pmDue today
Dr. Sunny Rao
Office of the Project Officer,WJ Area
Cleaning of Shaft No-II Pit bottom area, travelling roadway along 4th dip,Manual Drain cutting in D-19 BG to old RH-2 and side dressing in D19 TG 9th to face ,in XVI seam at Moonidih Colliery,W.J.Area.
2026_BCCL_364756_1
BCCL/WJA/MND/SUR/2026-27/07
Open Tender
Miscellaneous Works
Percentage
25 days
Moonidih Colliery, WJ Area
Please refer to NIT
11 documents required · 11 mandatory
₹7,504
2 Sept 2026
2 Sept 2026
14 Sept 2026
2 Sept 2026
12 Sept 2026
2 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Cleaning of Shaft No-II Pit bottom area, travelling roadway along 4th dip,Manual Drain cutting in D-19 BG to old RH-2 & side dressing in D19 TG/9th to face ,In XVI seam at Moonidih Colliery,W.J.Area. | |||||
| 1.01 | cleaning of Shaft No-II Pit bottom area , require Manpower= Analysis:For cleaning 4 M3 ,3 Unskilled manshaft required. = cost involved=(3x1437.6)/4 =RS.1078.2/M3, 175.0MX4.0MX.30M=210.0M3 | 210 | M3 | 1,078.2 | ₹2,26,422 |
| 1.02 | cleaning of travelling roadway along 4th dip: 35.00mx4.0mx(0.30+0.20)/2=35x4x0.25=35M³ Analysis:For cleaning 4 M3 ,3 Unskilled manshaft required. = cost involved=(3x1437.6)/4 =RS.1078.2/M3 | 35 | M3 | 1,078.2 | ₹37,737 |
| 1.03 | Manual Drain cutting in D-19 BG to old RH-2 = 280.mx0.70x0.30m=58.8M3 Analysis: Cutting of 2.0m3 in floor, 3 Unskilled Manshift required cost =(3x1437.6)/2 =RS.2156.4/M3 | 58.8 | M3 | 2,156.4 | ₹1,26,796.32 |
| 1.04 | side dressing in d19 TG/9th to face=33m x2.80mx(1.0+0.50)/2=69.3M3 , Analysis: For 10 M3 side dressing in coal Manshift required=3 skilled manshift for +10Unskilled manshift for mucking , Cost involved 1.00 M3=(3x1510.6+10x1437.60)/10=Rs18907.8/10M3 =Rs.1890.78/M3 | 69.3 | M3 | 1,890.78 | ₹1,31,031.05 |
| 1.05 | Add CP 15% as per clause 4.17.1 of Civil Eng. Manual & BCCL SOR | 1 | Units | 78,297.96 | ₹78,297.96 |
| 2CMPF | |||||
| 2.01 | CMPF, Pension and admin. Charge of Employee Un Skilled surface | 341 | Head | 275.26 | ₹93,863.66 |
| 2.02 | CMPF, Pension and admin. Charge of Employee Skilled surface | 21 | Head | 289.24 | ₹6,074.04 |
| 3Total impact of GST for the purpose of CTC | |||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.60 MB
BOQ_377669.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .