Tender Value
₹35.5 L
EMD Value
₹35,520
Closing Date
21 May 2026, 6:00 pmClosed
CHIEF OFFICER NAGAR PALIKA BODELI
BID DOCUMENTS FOR CONSTRUCTION WORK OF BOX CULVERT AT RAJA NAGAR TO VARDHMAN OF BODELI NAGARPALIKA UNDER: SWARNIM JAYANTI MUKHYA MANTRI SAHERI VIKAS YOJANA (UDP-88) YEAR: 2025-26
304178
580/2026 DATE -06/05/2026
Open
Civil Works
Chhota Udaipur
3 documents required · 3 mandatory
₹1,770
CHIEF OFFICER, BODELI NAGARPALIKA, BODELI
₹35,520
11 May 2026
11 May 2026
11 May 2026
21 May 2026
11 May 2026
Qty. Description Total Unit Amount
1 245.00 Excavation for foundation in up to 1.5 M Depth including
Cmt. shorting out and stacking of useful materials and disposing of
the excavated stuff up to 50 Meter lead.
in all sorts of soil 120.01 Cmt.
2 245.00 Excavation for foundation for depth from from 1.5 mt. to 3.0 mt.
Cmt. including shorting out and stacking of useful materials and
disposing of the excavated stuff up to 50 Meter lead.
1.50 to 3.00 Mt. Depth 133.05 Cmt.
3 245.00 Excavation for foundation for depth from 3.0 m to 5.0 m
Cmt. including sorting out and stacking of useful materials and
disposing off the excavated stuff upto 50 Meter lead. (A) Loose
3.00 to 5.00 Mt. Depth 146.09 Cmt.
4 49.00 Providing and filling rubbles including hand packing and filling
Cmt. interstices with quarry spalls behind abutments and between
returns as directed.
5 24.50 Providing and laying P.C.C. (1:3:6) mix (1 cement, 3 coarse
Cmt. sand, 6 hand broken stone aggregate of 40mm nominal size)
and curing complete excluding the cost of formwork in (A)
Foundation and Plinth.
6 Providing & laying controlled cement concrete M 250 and
curing complete excluding the cost of formwork and
reinforcement of reinforced concrete work in.
39.50 a) -- do -- for R.C.C. Wall 4551.51 Cmt.
17.00 b) -- do -- for R.C.C. Beam 4526.87 Cmt.
SBD SECTION-7 BILL OF QUANTITIES-146
73.50 c) -- do -- for R.C.C. Base Slab 4247.57 Cmt.
38.50 d) -- do -- for R.C.C. Slab 4526.87 Cmt.
7 23610.00 Providing TMT Bar FE 500D reinforcement for R.C.C. work
Kgs. including bending, binding and placing in position complete upto
floor two level.
8 22.50 Providing formwork of ordinary timber planking so as to give a
Smt. rough finish including centering, shuttering, strutting and
propping etc. height of propping and centering below
supporting floor to ceiling not exceeding 4m. and removal of the
same for in situ reinforced concrete and plain concrete work in
:(A) Foundations, footings, bases of Columns etc. and mass
9 179.50 Providing formwork of ordinary timber planking so as to give a
Smt. rough finish including centering, shuttering, strutting and
propping etc. height of propping and centering below
supporting floor to ceiling not exceeding 4m. and removal of the
same for in situ reinforced concrete and plain concrete work in
:(C) Vertical surface such as walls (any thickness ) partitions
and the like including attached buttresses & string course & the
like. 238.06 Smt.
10 78.50 Providing formwork of ordinary timber planking so as to give a
Smt. rough finish including centering, shuttering, strutting and
propping etc. height of propping and centering below
supporting floor to ceiling not exceeding 4m. and removal of the
same for in situ reinforced concrete and plain concrete work in
:(B) Flat surfaces such as soffits of supspened floors slabs
landings and the like. (2) Floors etc above 200 mm in
thickness. 280.45 Smt.
11 55.50 Providing formwork of ordinary timber planking so as to give a
Smt. rough finish including centering, shuttering, strutting and
propping etc. height of propping and centering below
supporting floor to ceiling not exceeding 4m. and removal of the
same for in situ reinforced concrete and plain concrete work in
:(H) (1) Sides and soffits of beams, Beam haunchings,
cantilevers, girders Bressumers, and lintels not exceeding 1 M
SBD SECTION-7 BILL OF QUANTITIES-147
12 4.50 Brick work using common burnt clay building brick having
Cmt crushing strength not less than 35 kg/sq. cm. in
foundationandplinth in Cement mortar 1:6 (1 Cement : 6 fine
sand ) 4121.55 Cmt
(B) Conventional
13 114.00 Providing 15mm. Thick cement plaster in single coat on
Smt. brick/concrete walls for interior plastering upto floor two level
and finished even and smooth in C. M. 1:3 (1 Cement, 3 Sand)
including finishing with a floating coat of neat cement slurry.
14 14.00 Filling available excavated earth (excluding rock) in trenches
Cmt. plinth, sides of foundations etc. in layers not exceeding 20 cm in
depth consolidating each disposited layer by ramming and
Add :- 18% of GST, Rs.
Add :- 1% of Qaulity Controll Rs.
Add :- 2% of Contingency Charges Rs.
I / We am/are willing to carry out the work at _____________ % above / below (percent should be written in figure and in words) of the estimated
rates mentioned above. Amount of my/our tender works out as under.
( In words ) _________________________ percentage above / below the estimated rate.
Estimated Amount put to tender Rs.
Deduct _______ % below Rs. Rs.
Estimated Amount put to tender Rs.
Add _______ % above Rs. Rs.
Total Amount Rs.
Total Amount Rs.
Note :1 All work shall be carried out as per Public Works Department Hand Book and other specifications of Division or as
Note :2 Rates quoted include clearance of site (prior commencement of work and its close) in all respects and hold good for
I/ We have read the conditions mentioned in this tender and agree to abide by the same.
Note :4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.: PRC-10/2017
Cement Consumption/16/C Date:11/05/2017 as stated in S.O.R. therefore in R.C.C. items where there is a change as
per actual mix design the cost of difference of cement consumption have been deducted from the rate of original item
at the rate of input rate mentioned in all the tender.
Signature of Contractor President Chief Officer
Bodeli Nagarpalika Bodeli Nagarpalika
SBD SECTION-7 BILL OF QUANTITIES-148
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
SBD.pdf
BOQ.pdf
OTHER IMPORTANT-1.pdf
OTHER IMPORTANT-2.pdf
OTHER IMPORTANT-3.pdf
Download all tender documents and submit your bid