Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹8.5 LAccepted-AOC | ₹8.5 L | 1 | Accepted-AOC 1 |
| 2 | 2₹8.5 LRejected-AOC | ₹8.5 L | 2 | Rejected-AOC 2 |
| Sl No | Description | Qty | Unit | A.M.ABDUL SALAM L1 | ASHRAF P V L2 |
|---|---|---|---|---|---|
| 1.00PROTECTION WALL | |||||
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil | 47.97 | cum | 197.98 ₹9,497.10 | 203.3 ₹9,752.30 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) | 9.59 | cum | 6,303.76 ₹60,478.27 | 6,473.25 ₹62,104.36 |
| 1.00 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 208.08 | sqm | 310.16 ₹64,538.09 | 318.5 ₹66,273.48 |
| 1.00 | 5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 150 landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) : 3 graded stone aggregate 20 mm nominal size). | 35.57 | cum | 10,630.94 ₹3.8 L | 10,916.77 ₹3.9 L |
| 1.00 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 2,980.8 | kilogram | 90.93 ₹2.7 L | 93.37 ₹2.8 L |
Tender Value
₹8.5 L
EMD Value
₹21,181
Closing Date
27 Feb 2025, 6:00 pmClosed
Assistant Engineer
Office of the Assistant Engineer, LIDEW Section, Kalamassery Municipality
SO252/25-CONSTRUCTION OF SIDE PROTECTION WALL IN KAIPPUDAMUKAL S C COLONEY IN WARD NO 20-General Civil Work
2025_LSGD_740700_7
LIDEW/AEE/ET/10/2025
Open Tender
Civil Works - Roads
180 days
Kalamassery
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,870
Yes
₹21,181
Yes
6 May 2026
22 Feb 2025
1 Mar 2025
22 Feb 2025
27 Feb 2025
22 Feb 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1191785.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.07 MB
BOQ_1191785.xls
BOQ • 0.23 MB
sbd7.pdf
Tender Documents • 2.10 MB
Download all tender documents and submit your bid